一种混凝土组装房模块快捷转运装置

CN224514412UActive Publication Date: 2026-07-17ALUHOUSE TECHNOLOGY (GD) COMPANY LIMITED

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
ALUHOUSE TECHNOLOGY (GD) COMPANY LIMITED
Filing Date
2025-08-11
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Currently, precast concrete structures can only be transported by crane, which is time-consuming and labor-intensive.

Method used

A detachable transfer mechanism is adopted. The assembly room module is connected to the assembly room module by hexagonal screws and L-shaped limit plates. The transfer mechanism is installed after being lightly lifted by a forklift or crane and transferred by pushing. The mechanism is disassembled after reaching the position to avoid drilling holes in the frame.

Benefits of technology

This enabled the rapid transfer of prefabricated housing modules, reducing transfer time and labor costs, and avoiding any impact on the strength of the frame.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514412U_ABST
    Figure CN224514412U_ABST
Patent Text Reader

Abstract

本实用新型公开了一种混凝土组装房模块快捷转运装置,涉及混凝土组装房预制装配技术领域,该混凝土组装房模块快捷转运装置,包括组装房模块和转运机构,所述组装房模块由四面的混凝土外墙板组成,且混凝土外墙板的内侧安装有模块化铝合金框架,所述转运机构包括承载座、脚轮连接架和脚轮,所述脚轮安装在脚轮连接架的内部,且通过转轴与脚轮连接架转动连接,所述承载座安装在脚轮连接架的上方,所述承载座上方的两侧均安装有L型限位片,两侧所述L型限位片的外侧均安装有两个六角螺丝,且六角螺丝的端部延伸至L型限位片的内侧,本方案解决了现有混凝土预制装配式结构在转运时,仅能通过吊机吊运的方式进行转运,费时费力的问题。
Need to check novelty before this filing date? Find Prior Art