Construction equipment for a green decorative ceiling system for health and wellness centers
By designing construction equipment that includes clamping, brushing, and drying mechanisms, the problem of construction instability in the green decoration and ceiling system of the health and wellness center was solved, achieving stable clamping, automatic brushing, and drying of the ceiling panels, thus improving construction efficiency and quality.
CN224514677UActive Publication Date: 2026-07-17CHINA THIRD METALLURGICAL GRP
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- CHINA THIRD METALLURGICAL GRP
- Filing Date
- 2025-08-12
- Publication Date
- 2026-07-17
AI Technical Summary
Technical Problem
The existing construction equipment for green decoration and ceiling systems in health and wellness centers suffers from unstable clamping and limiting, and inconvenient painting and drying operations, affecting construction efficiency and quality.
Method used
A construction device including clamping, brushing and drying mechanisms was designed. The clamping mechanism stabilizes the ceiling panel, the brushing mechanism automatically brushes and dries the panel, and the lifting mechanism facilitates the removal of the ceiling panel.
Benefits of technology
It achieves stable clamping and limiting of ceiling panels, automatic coating and drying, and improves construction efficiency and quality.
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN224514677U_ABST
Abstract
This utility model discloses a construction device for a green decorative ceiling system in a health and wellness center, relating to the field of ceiling construction technology. The construction device includes an operating platform mounted on a lifting platform. Two symmetrically arranged placement boxes are fixedly connected to the side wall of the operating platform. Each placement box contains a clamping mechanism for clamping and limiting the ceiling panels, and the bottom of each placement box contains a lifting mechanism for lifting the ceiling panels. This construction device and method for a green decorative ceiling system in a health and wellness center facilitates clamping and limiting the ceiling panels, ensuring greater stability and reliability and guaranteeing construction quality; it also facilitates automatic painting and drying of the ceiling panels, making the process more convenient and efficient; and it allows for easy lifting of the ceiling panels for removal from the placement boxes, further improving construction efficiency.
Need to check novelty before this filing date? Find Prior Art