一种建筑施工承载架
By introducing a conveyor belt structure into the building construction support frame, the problem of the existing support frame being unable to transport building materials has been solved, realizing efficient transportation of building materials and construction support, and improving construction efficiency and safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- ZHEJIANG MEISHENG CONSTRUCTION CO LTD
- Filing Date
- 2025-08-29
- Publication Date
- 2026-07-17
Smart Images

Figure CN224514690U_ABST
Abstract
Claims
1. A construction load bearing frame comprising a base (1) and a load bearing platform (2), characterised in that: The support platform (2) is located above the base (1). A through groove (3) is provided through the middle of the support platform (2). A movable roller (4) is provided above the opening of the through groove (3). A fixed roller (6) and a power roller (7) are respectively provided at the two ends of the upper part of the base (1). An adjusting roller (8) is provided above the power roller (7). A groove (9) is provided at both ends of the outer side wall of the movable roller (4), the fixed roller (6), the power roller (7), and the adjusting roller (8). Two conveyor belts (10) are provided on the outer side of the roller (8), and both conveyor belts (10) are located in the groove (9). Multiple support rods (11) are installed on the outer surface of the two conveyor belts (10). A connecting seat (12) is movably installed in the middle of the adjusting roller (8) through a pin. An adjusting hydraulic rod (13) is fixedly installed in the middle of the connecting seat (12). A support seat (14) is fixedly installed at the end of the adjusting hydraulic rod (13) away from the connecting seat (12), and the support seat (14) is fixedly installed on the upper surface of the base (1).
2. A construction load bearing scaffold according to claim 1, wherein: A motor (15) is fixedly installed on the upper surface of the base (1), and a transmission chain (16) is installed between the output shaft of the motor (15) and one end of the power roller (7).
3. A construction load bearing scaffold according to claim 2, wherein: Two sets of scissor lifts (17) are installed between the upper surface of the base (1) and the lower surface of the support platform (2). The movable roller (4), fixed roller (6), power roller (7) and adjusting roller (8) are all located between the two sets of scissor lifts (17).
4. A construction load bearing shelf as claimed in claim 3, wherein: Both sets of scissor lifts (17) are equipped with lifting hydraulic rods (18) on their outer sides.
5. A construction load bearing scaffold according to claim 1, wherein: A baffle (19) is fixedly installed on one end of the upper surface of the base (1), and the fixed roller (6) is located inside the baffle (19).
6. A construction load bearing scaffold according to claim 1, wherein: The base (1) is equipped with four wheels (20) at the four corners of its lower surface.
7. A construction load bearing scaffold according to claim 1, wherein: The movable roller (4) and the fixed roller (6) are both set to be two close to each other. Both ends of the movable roller (4) are equipped with supports (5) through bearings, and the supports (5) are fixedly installed on the upper surface of the support platform (2).