一种利用高空马道进行电气结构安装的系统

By using a segmented electrical structure installation method and utilizing elevated walkways for segmented installation of the electrical structure, the difficulties in construction and precision control of electrical structures in tall buildings have been solved, achieving efficient and safe installation and maintenance.

CN224514696UActive Publication Date: 2026-07-17BEIJING CONSTRUCTION ENGINEERING GROUP CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
BEIJING CONSTRUCTION ENGINEERING GROUP CO LTD
Filing Date
2025-08-25
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the existing technology, the installation of lighting fixtures in tall buildings such as theaters and dance rehearsal halls is difficult to construct, requires high precision, and is difficult to maintain, especially when the span of the high-altitude catwalk is large, it is difficult to control the splicing accuracy.

Method used

The electrical structure is installed in sections using a segmented combination method. The electrical structure is installed in sections using an elevated walkway. The installation and connection of the electrical system are achieved by lifting fixed and movable components in sections.

Benefits of technology

It reduces construction difficulty, improves installation accuracy and construction efficiency, and facilitates later maintenance, ensuring construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514696U_ABST
    Figure CN224514696U_ABST
Patent Text Reader

Abstract

本实用新型公开了一种利用高空马道进行电气结构安装的系统,包括马道结构、提升结构和电气结构,所述马道结构间隔设置在建筑结构上,所述电气结构包括固定组件和活动组件,所述固定组件固定设置在马道结构上,位于马道结构的下方,所述活动组件通过提升结构与马道结构连接,并位于相邻的马道结构之间。本实用新型根据马道的分布将电气结构分为固定组件和活动组件的分段式结构,固定组件直接固定安装在马道结构上,而活动组件则设置在相邻马道结构之间,并通过提升结构提升的方式进行安装,有效解决了电气结构的安装问题,降低施工难度的同时有效保证了安装精度,并且分段式结构便于后期维护。