By installing lifting and snap-fit ​​components on the construction scaffolding, the problems of walkway slab dents and panel slippage in the construction scaffolding were solved, thereby improving the safety of workers and construction efficiency.

CN224514714UActive Publication Date: 2026-07-17CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA TIESIJU CIVIL ENGINEERING GROUP CO LTD
Filing Date
2025-08-25
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The walkways of existing construction scaffolds are prone to localized dents, which can cause workers to slip and fall. The panels are also prone to sliding on the support frame, and the integral panels are difficult to dismantle, affecting construction efficiency.

Method used

The system employs a lifting assembly and a snap-fit ​​assembly. The lifting assembly provides additional support for locally recessed areas through a threaded screw and a lifting plate, while the snap-fit ​​assembly secures the panel with clamps and screws to prevent slippage.

Benefits of technology

It effectively prevents workers from falling, improves panel stability, simplifies panel installation and removal, and enhances construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514714U_ABST
    Figure CN224514714U_ABST
Patent Text Reader

Abstract

本实用新型涉及建筑施工技术领域,公开了一种施工爬架防护装置,包括支撑架,以及设置在支撑架上方的一号面板和二号面板,所述支撑架上安装有顶升组件;所述顶升组件包括安装座,所述安装座通过固定块连接有螺纹套筒,所述螺纹套筒的内侧螺纹连接有一号螺杆,所述一号螺杆的顶部设置有顶升板,用于将一号面板或者二号面板容易凹陷的地方顶起;顶升组件通过转动一号螺杆带动顶升板向上移动,能为一号面板和二号面板局部容易凹陷的部位提供额外支撑,避免工作人员摔倒,且针对局部凹陷部位单独加装顶升组件,便捷省事,另外,支撑架上的卡扣组件,夹块采用铝型材质,韧性良好,可卡在支撑架上,能够避免一号面板和二号面板在支撑架上滑动,造成安全事故的问题发生。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A construction climbing frame protection device, comprising a support frame (1), and a first panel (2) and a second panel (3) arranged above the support frame (1), characterized in that, A lifting assembly is installed on the support frame (1); The lifting assembly includes a mounting base (7), which is connected to a threaded sleeve (9) via a fixing block (8). The inner side of the threaded sleeve (9) is threadedly connected to a screw (10), and a lifting plate (11) is provided on the top of the screw (10) to lift up the easily recessed parts of the first panel (2) or the second panel (3).

2. The construction climbing frame protection device according to claim 1, characterized in that, The lifting assembly also includes two connecting frames (5) set on the mounting base (7), and each connecting frame (5) has a connecting block (6) at its lower end. The connecting block (6) has a central shaft, which is rotatably connected to the mounting base (7). The connecting frame (5) has a first connecting seat (12) at its upper end, and the first connecting seat (12) is respectively sleeved on the outside of two adjacent support frames (1).

3. The construction climbing frame protection device according to claim 1, characterized in that, The support frame (1) is also provided with a buckle assembly, which includes a clamping block (14), a rotating shaft (15) is rotatably connected above the clamping block (14), a second connecting seat (16) is provided above the rotating shaft (15), and a second screw (17) is provided above the second connecting seat (16). Furthermore, the bottom surface of the first panel (2) or the second panel (3) is provided with an adapter groove for use with the second screw (17).

4. The construction climbing frame protection device according to claim 1, characterized in that, A hinge (4) is provided between the first panel (2) and the second panel (3).

5. The construction climbing frame protection device according to claim 3, characterized in that, The clamp (14) is fitted onto the outside of the support frame (1).

6. The construction climbing frame protection device according to claim 3, characterized in that, A positioning nut (18) is fitted on the outer side of the second screw (17).

7. The construction climbing form working protection device according to claim 1, characterized in that, The lower end of the first screw (10) passes through the mounting base (7).