A reinforced steel arrangement structure for strengthening existing building beams and columns by increasing their cross-sections.
By setting triangular prism steel reinforcement structures and closed-loop column stirrups at the beam-column joints of existing buildings, the problems of excessive rebar installation that easily damages the original structure and long construction period in traditional reinforcement methods are solved, achieving efficient and economical reinforcement results and improving seismic performance and overall bearing capacity.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- HUALAN DESIGN GRP CO LTD
- Filing Date
- 2025-07-29
- Publication Date
- 2026-07-17
AI Technical Summary
In traditional beam and column reinforcement methods using enlarged cross-sections, the stirrups do not meet the specifications, excessive rebar installation can easily damage the original structure, the construction period is long and the efficiency is low, and some structures cannot be reinforced with rebar, making construction complex and the seismic performance insufficient.
At the beam-column joints of existing buildings, the enlarged cross-section is divided into four areas, and triangular prism steel reinforcement structures are set up. These are connected by closed-loop column stirrups, combined with column longitudinal reinforcement, beam top reinforcement and beam bottom reinforcement to form an integral connection, reducing the number of rebars and enhancing the bond between new and old concrete.
Simplify the construction process, reduce rebar installation work, shorten the construction period, improve seismic performance, meet the stirrup spacing requirements of the specifications, reduce costs, and enhance the overall load-bearing capacity of beam-column connections.