一种建筑工程用基坑防护栏

By using threaded connections and limiting structures for the support frame and partitions, the problem of the pit guardrail being unable to be disassembled was solved, enabling disassembly and assembly in case of partial damage, thus improving maintenance efficiency and material utilization.

CN224514912UActive Publication Date: 2026-07-17SHANXIAN ZHUJIAN ENG SUPERVISION CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANXIAN ZHUJIAN ENG SUPERVISION CO LTD
Filing Date
2025-08-26
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The existing foundation pit guardrails used in construction projects are of a single, integrated structure, which means that when a part is damaged, the entire structure needs to be replaced, as it cannot be disassembled for maintenance.

Method used

The design employs a support frame, partitions, and assembly structure. By utilizing a combination of threaded connections, limit blocks, and screw nuts, the support frame and partitions can be disassembled and assembled. The threaded connections and limit structures are used to position and limit each component.

Benefits of technology

The design enables the pit guardrail to be disassembled and assembled, avoiding the need for complete replacement due to partial damage, and improving maintenance efficiency and material utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514912U_ABST
    Figure CN224514912U_ABST
Patent Text Reader

Abstract

本实用新型涉及防护栏技术领域,具体为一种建筑工程用基坑防护栏,包括:装置本体,所述装置本体包括支撑架,所述支撑架一侧设置有隔板;所述隔板两侧设置有组装结构,所述组装结构包括支撑板,所述支撑板一端连接有定位环。本实用新型经将第二螺套转动连接于支撑架外表面,而后将支撑板一端连接的定位环套接于支撑架外壁,再将第一螺套转动连接于支撑架外表面,利用第一螺套和第二螺套对定位环上下两端进行限位,使限位块紧贴于第二螺套一侧表面,从而对第二螺套的角度进行限制,从而实现对支撑架和隔板之间进行组装,避免因无法进行拆分,导致其中一部分出现损坏需要整体进行更换的问题。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A protective railing for foundation pits in construction projects, characterized in that, include: The device body (1) includes a support frame (11) and a partition (12) is provided on one side of the support frame (11). The partition (12) is provided with an assembly structure (2) on both sides. The assembly structure (2) includes a support plate (21). One end of the support plate (21) is connected to a positioning ring (22). The top end of the positioning ring (22) is tightly attached to a first threaded sleeve (23). The bottom end of the positioning ring (22) is tightly attached to a second threaded sleeve (24). A first screw (25) is inserted inside one side of the second threaded sleeve (24). Limiting blocks (26) are connected to both sides of the first screw (25).

2. The foundation protection fence for construction work according to claim 1, wherein: The support frame (11) has threads on its surface, and the support frame (11) and the first threaded sleeve (23) and the second threaded sleeve (24) are connected by threads.

3. The construction site excavation protection fence according to claim 1, wherein: The positioning ring (22) is sleeved on the outer surface of the support frame (11) and is movably connected to the support frame (11). The positioning ring (22) is limited by the first screw sleeve (23) and the second screw sleeve (24).

4. A foundation pit protection railing for construction projects according to claim 1, characterized in that: The second threaded sleeve (24) has a through groove on one side, and the support frame (11) has a threaded hole on one side. One end of the first screw (25) passes through the through groove of the second threaded sleeve (24) and is rotatably connected to the inside of the threaded hole of the support frame (11). The limiting block (26) is in close contact with the surface of one side of the second threaded sleeve (24).

5. The construction site excavation protection fence according to claim 1, wherein: The support plate (21) has a limiting structure (3) connected to one end surface. The limiting structure (3) includes a first positioning frame (31). A second screw (32) is inserted inside both sides of the surface of the first positioning frame (31). A nut (33) is rotatably connected to the outer surface of one end of the second screw (32). A second positioning frame (34) is connected to the other end of the second screw (32).

6. A building construction site excavation protection fence according to claim 5 wherein: The first positioning frame (31) and the second positioning frame (34) are respectively sleeved on the outer wall of one side of the partition (12), and the second screw (32) and the nut (33) are connected by threads.

7. The construction site excavation protection fence according to claim 5, wherein: The first positioning frame (31) has slots on both sides of its surface, and one end of the second screw (32) is inserted into the slot of the second screw (32).