一种煤矿用超前临时支护结构

By using an advanced temporary support structure composed of impact wedges, iron back plates, and anchor bolts in underground coal mine roadways, the problem of roof deformation and failure in traditional passive support methods has been solved, realizing active support and improving construction safety and reliability.

CN224515207UActive Publication Date: 2026-07-17GUIZHOU PANJIANG REFINED COAL

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
GUIZHOU PANJIANG REFINED COAL
Filing Date
2025-06-23
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Traditional passive support methods such as wooden props and metal friction props cannot actively adapt to roof deformation and are prone to failure due to roof subsidence or impact pressure, thus failing to meet the safety requirements of deep coal mining.

Method used

An advanced temporary support structure consisting of impact wedges, iron back plates, and anchor bolts is adopted. The impact wedges are inserted into the face of the working face and tied to the U-shaped canopy beam. Combined with the iron back plate and steel mesh, the anchor bolts are used for active support to form a stable temporary support system.

Benefits of technology

It improved the safety and reliability of construction during tunnel excavation and repair, and ensured the safety of life and property of construction workers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224515207U_ABST
    Figure CN224515207U_ABST
Patent Text Reader

Abstract

本实用新型公开了一种煤矿用超前临时支护结构,包括撞楔、铁背板和锚杆,撞楔为前端两侧加工成尖型、后端开设孔眼的钢管,多个撞楔间隔设定距离通过前端从U型棚棚梁下方插入后抵靠在迎头掌子面上,后端采用钢丝绳通过孔眼绑扎在U型棚棚梁上,铁背板安装在钢筋网下方,钢筋网安装在撞楔与巷道顶板之间,U型棚边缘350mm沿巷道中线设有第一根锚杆,第一根锚杆两侧分对称打设两根锚杆支护顶板。本实用新型由传统的被动支护更改为主动支护,解决了在巷道掘进及修复期间的顶板问题,极大的提高了施工的安全性及可靠性,保障了施工人员的生命财产安全。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A temporary advance support structure for use in a coal mine, characterised in that, The system includes a wedge (1), an iron back plate (2), and an anchor bolt (3). The wedge (1) is a steel pipe with pointed ends (101) on both sides and holes (102) at the rear end. Multiple wedges (1) are inserted from below the U-shaped canopy beam at a set distance and abut against the face of the working face. The rear end is tied to the U-shaped canopy beam through the holes (102) with steel wire rope. The iron back plate (2) is installed below the steel mesh (6). The steel mesh (6) is installed between the wedge (1) and the roadway roof. The first anchor bolt (3) is installed 350mm from the edge of the U-shaped canopy along the roadway centerline. Two anchor bolts (3) are symmetrically installed on both sides of the first anchor bolt (3) to support the roof.

2. The temporary advance support structure for coal mines according to claim 1, characterized in that, The anchor bolts (3) are spaced 1200mm apart.

3. The temporary advance support structure for coal mines as claimed in claim 1 wherein, The anchor rod (3) is a right-hand threaded rod with a specification of φ20×1800mm. It is used with a tray (4) with a specification of 600×150×8mm and a matching stress nut (5). The end of the anchor rod (3) protrudes 10-100mm beyond the nut (5), and the torque of the nut at the end of the anchor rod (3) is not less than 400N·m.

4. The temporary advance support structure for coal mines as claimed in claim 1 wherein, The wedge (1) is made of 1.5-inch tubing.

5. The temporary advance support structure for coal mines as claimed in claim 1 wherein, The steel mesh (6) has a specification of 2.0×1.2m.