一种混塔式风机基础中心对顶支撑立柱装置

By using a hybrid tower wind turbine foundation center-top support column device, the stable structure of steel plates and steel columns is connected to the soil to achieve counteracting steel pipe support, which solves the problems of labor and material waste and leakage risk in the traditional support frame erection process and improves construction efficiency.

CN224515310UActive Publication Date: 2026-07-17SHANXI INSTALLATION GRP CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANXI INSTALLATION GRP CO LTD
Filing Date
2025-11-27
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The use of traditional support frame erection technology in the foundation of hybrid tower wind turbines results in an excessive number of steel pipes, causing waste of labor and materials, and increasing the risk of leakage in the foundation slab.

Method used

A hybrid tower-type wind turbine foundation with a center-to-top support column device is adopted, including steel plates and steel columns. It is fixedly connected to the soil through a stable structure, and uses horizontal steel pipes to provide counteracting support, reducing the amount of steel column material used and improving construction efficiency.

Benefits of technology

It effectively reduces the amount of steel column material used, saves labor costs, reduces the risk of leakage in the wind turbine foundation slab, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224515310U_ABST
    Figure CN224515310U_ABST
Patent Text Reader

Abstract

本实用新型涉及混塔式风机领域,具体的说是一种混塔式风机基础中心对顶支撑立柱装置,包括钢板,所述钢板的一侧固定连接有钢立柱,所述钢立柱的表面固定连接有第一钢筋头,所述钢板和钢立柱之间设置有稳固结构;本实用新型中的钢板直接放置于基础的中心处,钢立柱直立于风机基础中心位置,对风机基础内室侧模的水平对顶支撑钢管传导的侧向压力进行对向抵消,放置完成后进行水平钢管对顶支设,整体由下至上在中心对顶支撑钢立柱的五个水平高度进行逐根钢管对顶支设,每台风机基础共六十根水平钢管对顶支设,并检验稳固后,在满足模板架体正常安全使用的前提下,能大大减少钢立柱材料用量,节约人工用量,提高施工效率。
Need to check novelty before this filing date? Find Prior Art