用于医疗建筑物的余热回收型空调系统

By using a waste heat recovery air conditioning system, heat exchange coils are used to absorb heat from the UPS room, solving the problems of high energy consumption and difficult outdoor unit installation in the air conditioning system of the UPS room in medical buildings. This achieves 100% fresh air operation and reduced energy consumption, improving the efficiency of the air conditioning system and air quality.

CN224516927UActive Publication Date: 2026-07-17SIPPR ENG GROUP

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SIPPR ENG GROUP
Filing Date
2025-08-13
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The air conditioning system in the UPS room of medical buildings has problems such as high energy consumption and difficulty in installing the outdoor unit. Especially during the transition season, it is impossible to achieve 100% fresh air operation, which affects the efficiency and energy consumption of the air conditioning system.

Method used

The waste heat recovery air conditioning system absorbs heat from the UPS through a waste heat circulation loop, and uses heat exchange coils to reheat the cooling air during the cooling season, preheat the mixed air during the heating season, and operate with a large fresh air volume during the transition season, thus solving the installation difficulties and energy consumption problems of the outdoor air conditioning unit.

Benefits of technology

It reduced the energy consumption of cold air reheating and mixed air heating, solved the installation problem of the outdoor unit of the air conditioner in the UPS room, and enabled the operation of fresh air in key departments, thus improving the efficiency of the air conditioning system and the air quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224516927U_ABST
    Figure CN224516927U_ABST
Patent Text Reader

Abstract

本实用新型公开了一种用于医疗建筑物的余热回收型空调系统,包括空调机组和余热回收利用单元,余热回收利用单元包括由压缩机、换热盘管、储液干燥器、热力膨胀阀和UPS间的空调室通过管路依次连接而成的余热循环回路、冷凝室和第一排风机;冷凝室和第一风室之间设置有第二调节风阀,冷凝室和第二风室之间设置有第一阀。本实用新型将UPS间配套的空调内机安装在UPS间内,通过余热循环回路将UPS间的热量送至换热盘管处,在供冷季可对冷风再热,降低冷风再热能耗;在供暖季可对混合风预热,降低加热能耗,还解决了UPS间空调外机的安装难题;在过渡季,本实用新型的余热回收型空调系统可以大新风量运行,实现重点科室的全新风运行。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A waste heat recovery type air conditioning system for medical buildings, comprising an air conditioning unit, said air conditioning unit comprising a mixing chamber, a primary filter section, a blower, a medium-efficiency filter section, a cooling surface section, a heating section, a humidification section, and an air flow equalization section connected in sequence; characterized in that: The waste heat recovery type air conditioning system also includes a waste heat recovery and utilization unit, which includes a waste heat circulation loop formed by connecting the compressor, heat exchange coil, liquid receiver dryer, thermal expansion valve and the air conditioning room between the UPS in sequence through pipelines. The surface cooling section includes a surface cooling chamber and a surface cooling coil disposed within the surface cooling chamber. The heating section includes a heating chamber and a heating coil disposed within the heating chamber. A first air chamber is provided at the air outlet of the surface cooling chamber. The first air chamber is connected to the heating chamber via a second air chamber. A first regulating air valve is provided between the first air chamber and the second air chamber. The waste heat recovery and utilization unit also includes a condensing chamber disposed outside the first air chamber and the second air chamber. The heat exchange coil is disposed within the condensing chamber. A second regulating air valve is provided between the condensing chamber and the first air chamber. A first valve is provided between the condensing chamber and the second air chamber. The waste heat recovery and utilization unit also includes a first exhaust fan, the air inlet of which is connected to the condensing chamber. The air conditioning unit also includes a return air chamber and a second exhaust fan. A second valve is installed between the fan chamber and the return air chamber of the second exhaust fan, and a third regulating air valve is installed at the air outlet of the fan chamber. A fourth regulating air valve is installed at the air outlet of the return air chamber. A third valve is installed between the return air chamber and the mixing air chamber, and a fifth regulating air valve is installed at the fresh air outlet of the mixing air chamber. A sixth regulating air valve is installed at the air outlet of the air supply equalization section.

2. The waste heat recovery type air conditioning system for a medical building according to claim 1, characterized by: The first and second regulating air valves are both electric air volume regulating valves, while the third, fourth, fifth, and sixth regulating air valves are all manual air volume regulating valves; the first, second, and third valves are all electric airtight valves.