一种耐火砖坯体烘干仓

CN224517179UActive Publication Date: 2026-07-17SHANDONG XINRUIXIANG NEW MATERIAL CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANDONG XINRUIXIANG NEW MATERIAL CO LTD
Filing Date
2025-07-24
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

When drying refractory brick blanks, the brick blanks near the middle area cannot come into good contact with the hot air, resulting in the outer brick blanks being dried while the inner brick blanks are not dried, which affects the use effect of the drying chamber.

Method used

A flow guiding device is adopted, including a connecting pipe, a first bolt and a flow guiding pipe, which guides the hot air inside the ventilation pipe to the middle area of ​​the support to ensure a more uniform distribution of hot air.

Benefits of technology

The airflow guiding device ensures a more even distribution of hot air, preventing the brick blanks in the middle area from not being dried and improving the effectiveness of the drying chamber.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224517179U_ABST
    Figure CN224517179U_ABST
Patent Text Reader

Abstract

本实用新型提供一种耐火砖坯体烘干仓,涉及烘干仓技术领域,本实用新型包括仓体,所述仓体上端设有通风管,所述仓体内部设有支架,所述通风管处设有导流装置,所述导流装置通过导流管,来对通风管内部的热风进行导流,所述导流装置包括连接管、第一螺栓和导流管,所述连接管一侧与通风管连接,本实用新型通过使用导流装置,可以将通风管内部的热风导流到支架中间区域的耐火砖胚体处,然后使仓体内部的热空气更均匀地分布,避免在对支架上耐火砖坯体进行烘干的时候,靠近中间区域的耐火砖胚体不能很好的与热空气接触,导致外部耐火砖胚体烘干后,内部部分耐火砖胚体没有被烘干的情况发生,从而提升烘干仓的使用效果。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A firebrick green body drying kiln comprising a kiln body (1), characterised in that: The upper end of the chamber (1) is provided with a ventilation pipe (2), the inside of the chamber (1) is provided with a support (3), and a flow guiding device (4) is provided at the ventilation pipe (2). The flow guiding device (4) guides the hot air inside the ventilation pipe (2) through the flow guiding pipe (43). The flow guiding device (4) includes a connecting pipe (41), a first bolt (42) and a flow guiding pipe (43). One side of the connecting pipe (41) is connected to the ventilation pipe (2). The first bolt (42) is inserted into one side of the connecting pipe (41) to connect with the flow guiding pipe (43). The outlet of the flow guiding pipe (43) is close to the middle area of ​​the support (3).

2. A kiln for drying green firebricks according to claim 1, characterized in that: The first bolt (42) is provided with a nut (44) on the side near the guide pipe (43) to limit and fix the first bolt (42).

3. A firebrick green body drying chamber according to claim 2, wherein: The connecting pipe (41) is provided with a protective component (45) on the side near the guide pipe (43). The protective component (45) includes a second bolt (451), a placement frame (452) and a protective plate (453). The second bolt (451) is inserted into one side of the placement frame (452) and connected to the connecting pipe (41). The protective plate (453) is located on one side of the placement frame (452) and on one side of the guide pipe (43).

4. A kiln for drying green firebricks according to claim 3, wherein: The placement rack (452) is provided with a reinforcing plate (454) on the side near the protective plate (453) to improve the connection strength between the placement rack (452) and the protective plate (453).

5. A kiln for drying green firebricks according to claim 4, characterised in that: The placement rack (452) is provided with a support plate (455) on the side near the guide pipe (43), and the support plate (455) is in contact with the guide pipe (43) for support.

6. A kiln for drying green firebricks according to claim 5 wherein: The second bolt (451) has a washer (456) on the side near the placement rack (452), the washer (456) increasing the contact area between the second bolt (451) and the placement rack (452).

7. A firebrick green body drying chamber according to claim 6, wherein: A positioning plate (457) is provided on one side of the connecting pipe (41) to position the placement rack (452) and the connecting pipe (41).