一种基坑监测用测斜管防堵装置

By installing an anti-clogging device inside the inclinometer tube and using a threaded rod and scraper to clean the soil, the problem of soil blockage inside the inclinometer tube was solved, ensuring the smooth insertion of the inclinometer and the accuracy of the measurement.

CN224517777UActive Publication Date: 2026-07-17SINOCHEM GEOLOGY JIANGSU GEOTECHNICAL ENG CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SINOCHEM GEOLOGY JIANGSU GEOTECHNICAL ENG CO LTD
Filing Date
2025-06-30
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing inclinometer tubes used for foundation pit monitoring are prone to getting soil inside during use, making it difficult to insert the inclinometer further, and the soil residue inside is difficult to clean completely, affecting the accuracy of the measurement.

Method used

An anti-clogging device was designed, comprising a mounting flange, a threaded rod, an anti-clogging plate, a movable shaft, a fixed rod, a telescopic block, a scraper, and a spring. By turning the handle, the threaded rod is rotated, and the anti-clogging plate moves up and down inside the inclinometer tube, pushing the movable shaft and the scraper to rotate on the inner wall. The scraper cleans the soil and collects it on the anti-clogging plate.

Benefits of technology

This effectively prevents soil from entering the inclinometer tube, ensuring that the inclinometer can be inserted smoothly, and thoroughly cleans the soil residue inside, thus improving measurement accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224517777U_ABST
    Figure CN224517777U_ABST
Patent Text Reader

Abstract

本实用新型涉及基坑监测领域,具体涉及一种基坑监测用测斜管防堵装置,包括安装法兰,用于安装测斜管防堵装置。本实用新型一种基坑监测用测斜管防堵装置,通过测斜管、螺纹杆、把手、防堵片、活动轴、固定杆、伸缩块、刮板、伸缩杆和弹簧的设置,通过转动安装法兰上方的把手带动螺纹杆转动,而螺纹杆转动带动外部下方的防堵片在测斜管内滑槽中限位升降,而防堵片升降的过程中推动活动轴在螺纹杆外转动,从而使得活动轴外部的固定杆与伸缩块和刮板贴在测斜管内壁转动,而伸缩块通过两侧的伸缩杆与外部的弹簧设置,从而挤压推动弹簧贴在测斜管内部,而刮板的尺寸大于测斜管内部滑槽,从而不会进入滑槽中,之后清理后的泥土会落入在防堵片上。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A slope pipe anti-blocking device for foundation pit monitoring, characterized in that: The installation flange (1) is used for installing the anti-blocking device of the inclinometer tube. The installation flange (1) is installed on the upper end of the inclinometer tube (2), the threaded rod (4) is screwed through the installation flange (1), the upper end of the threaded rod (4) is fixedly connected with the handle (5), the outer thread of the threaded rod (4) is connected with the anti-blocking piece (6), the upper end of the anti-blocking piece (6) is rotatably connected with the movable shaft (7), the outer sides of the movable shaft (7) are fixedly connected with the fixed rods (8), the inner sides of the fixed rods (8) are slidably connected with the telescopic blocks (10), one end of the telescopic block (10) is fixedly connected with the scraper (11), the two sides of the telescopic block (10) are provided with the telescopic rods (13), and the outer sides of the telescopic rods (13) are sleeved with the springs (14).

2. The anti-blocking device for inclinometer pipe in foundation pit monitoring according to claim 1, characterized in that: The installation flange (1) is provided with the bolts (3), and the installation flange (1) is screwed with the inclinometer tube (2) through the bolts (3).

3. The anti-blocking device for inclinometer pipe in foundation pit monitoring according to claim 1, characterized in that: The movable shaft (7) is screwed with the threaded rod (4), and the fixed rod (8) is provided with four groups.

4. The anti-blocking device for inclinometer pipe in foundation pit monitoring according to claim 1, characterized in that: The two sides of the fixed rod (8) are fixedly connected with the first fixed blocks (9), the two sides of the telescopic block (10) are fixedly connected with the second fixed blocks (12), the inner side of the second fixed block (12) is fixedly connected with the telescopic rod (13), and the front end of the telescopic rod (13) penetrates into the first fixed block (9).

5. The anti-blocking device for inclinometer pipe in foundation pit monitoring according to claim 1, characterized in that: The springs (14) are provided with two groups, and the springs (14) are located between the first fixed blocks (9) and the second fixed blocks (12).

6. The anti-blocking device for inclinometer pipe in foundation pit monitoring according to claim 1, characterized in that: The inner side of the lower end of the inclinometer tube (2) is provided with the threaded groove (15), and the threaded groove (15) is screwed with the plug cone (16).