一种加油机检定用计量罐快速排液阀门组件

By installing an inlet solenoid valve and a outlet solenoid valve in the metering tank used for fuel dispenser calibration, and by using high-pressure gas to push the liquid, the problems of slow drainage speed and the need to place the metering tank at a high position in the existing technology are solved, and a fast and convenient drainage operation is achieved.

CN224517853UActive Publication Date: 2026-07-17

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Filing Date
2025-10-13
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The existing metering tanks used for fuel dispenser calibration have a slow drainage speed and require the tanks to be placed at a high position for drainage, which affects the efficiency and convenience of the calibration operation.

Method used

An inlet solenoid valve is installed at the top of the inlet pipe, and a drain solenoid valve is installed at the top of the drain pipe. They are connected to a high-pressure gas tank through a connecting pipe. High-pressure gas is used to push the liquid to accelerate the draining process. At the same time, an extension hose is connected to the output end of the drain pipe to ensure that the liquid can be discharged quickly at a low point.

Benefits of technology

It improves the efficiency of the verification process, saves manpower, enhances the convenience of the draining operation, and ensures the speed and thoroughness of the draining.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224517853U_ABST
    Figure CN224517853U_ABST
Patent Text Reader

Abstract

本申请涉及一种加油机检定用计量罐快速排液阀门组件,涉及加油机计量罐技术领域,其包括罐体,所述罐体的顶端连通设置有进液管,所述进液管的顶端安装有进液电磁阀。本申请通过在进液管的顶端设置进液电磁阀,在排液管的顶端设置排液电磁阀,并在进液电磁阀的下方设置与进液管连通的固定管,通过连接管将固定管与高压气罐的输出端连接,能够在排液操作时关闭进液电磁阀,开启排液电磁阀和高压气罐的阀门,使罐内液体自重排液的同时受到高压气体的推送,进而加速排液,避免浪费时间,提高检定作业效率,通过在排液管的输出端螺纹连接延长软管,可将延长软管的输出端对准排液容器,防止排液管过低影响排液,避免将计量罐放置在高处排液,节省人力。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A fast drain valve assembly for a metering tank used in a gasoline dispenser calibration, comprising a tank body (1), characterized in that: The top of the tank (1) is connected to an inlet pipe (2), and an inlet solenoid valve (4) is installed at the top of the inlet pipe (2). The bottom of the tank (1) is connected to a drain pipe (5), and a drain solenoid valve (6) is provided on the outer circumference of the drain pipe (5). An extension hose (19) is provided at the output end of the drain pipe (5). The extension hose (19) is threadedly connected to the output end of the drain pipe (5) through a connector at the end. A high-pressure gas tank (7) is provided on one side of the tank (1). A valve (8) is installed at the output end of the high-pressure gas tank (7). A fixed pipe (9) is provided below the inlet solenoid valve (4) and is connected to the inlet pipe (2). A connecting pipe (10) is provided between the input end of the fixed pipe (9) and the output end of the high-pressure gas tank (7). The connecting pipe (10) is threadedly connected to the input end of the fixed pipe (9) and the output end of the high-pressure gas tank (7) through a connector at the end.

2. A quick drain valve assembly for a metering tank used in the calibration of a fuel dispenser as set forth in claim 1, the improvement wherein: The top of the inlet pipe (2) is connected to an inlet hopper (3), and the bottom of the tank (1) is a funnel-shaped structure.

3. A quick drain valve assembly for a proving tank for use in calibration of a fuel dispenser as defined in claim 1, wherein: The fixed tube (9) has an inverted U-shaped structure.

4. The rapid discharge valve assembly for a metering tank used in fuel dispenser calibration according to claim 1, characterized in that: The fixing tube (9) is a rigid metal tube, and the connecting tube (10) is a flexible hose.

5. A quick drain valve assembly for a proving tank for use in calibration of a fuel dispenser as defined in claim 1, wherein: The outer circumference of the liquid inlet pipe (2) is provided with a transparent observation window (11), and a scale (12) is provided in front of the observation window (11).

6. A quick drain valve assembly for a proving tank for use in calibration of a fuel dispenser as defined in claim 1, wherein: The bottom of the tank (1) is fixedly connected to a bracket (15), and the bottom surface of the bracket (15) is fixedly connected to equidistantly arranged support legs (16). Each support leg (16) is provided with a leveling component (17) at its bottom. The leveling component (17) includes a screw rod (1701) threadedly connected to the support leg (16). The top of the screw rod (1701) is provided with a handwheel (1702), and the bottom of the screw rod (1701) is provided with a support plate (1703). The upper surface of the bracket (15) is provided with a level (18).

7. A quick drain valve assembly for a proving tank for a dispenser verification system as defined in claim 6 wherein: A base (13) is fixedly connected to one side of the upper surface of the bracket (15). The bottom of the high-pressure gas tank (7) is slidably inserted into the interior of the base (13). A balance block (20) is provided on the upper surface of the bracket (15) and is symmetrical to the position of the high-pressure gas tank (7).

8. A metering tank quick drain valve assembly for use in a fuel dispenser verification system as set forth in claim 7, wherein: The inner wall of the base (13) is provided with anti-slip strips (14) arranged at equal intervals through grooves, and one side of the anti-slip strips (14) is in close contact with the outer circumferential surface of the high-pressure gas tank (7).