一种装配式电力沟槽

By staggering the arrangement of prefabricated sections and cover plates, and setting up drainage sections and diversion channels, the problems of water accumulation and low cable fixing efficiency in prefabricated power trenches are solved, thereby reducing water accumulation, improving construction efficiency, and ensuring line safety.

CN224520626UActive Publication Date: 2026-07-17SHANWEI HUINENG INTEGRATED ENERGY SERVICE CO LTD +2

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANWEI HUINENG INTEGRATED ENERGY SERVICE CO LTD
Filing Date
2025-08-21
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing prefabricated power trenches are prone to water accumulation in areas with high rainfall or abundant groundwater, resulting in backflow or seepage at drainage outlets, which affects line safety and has low cable fixing efficiency.

Method used

An assembled power trench with prefabricated sections and cover plates arranged in an alternating pattern was designed. Drainage sections and diversion channels were set up, and diversion pipes and longitudinal support plates were used. Combined with pipe racks and grounding embedded parts, the sealing performance and cable laying efficiency were improved.

Benefits of technology

It effectively reduces the risk of water backflow, improves sealing and construction efficiency, protects cables from water damage, and ensures line safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224520626U_ABST
    Figure CN224520626U_ABST
Patent Text Reader

Abstract

本实用新型公开一种装配式电力沟槽包括预制节、盖板,所述预制节包括标准节、排水节,所述预制节顶端内侧设置有凸起条,在所述盖板两侧设置向下的盖板凸起条;盖板在铺设时同预制节交错布置,两盖板对接处设置在预制节中央区域,预制节一侧设置有水平凸起条,另一侧端面设置有水平凹槽;在预制节底部中央设置有导流槽,排水节的导流槽内设置有排水口,在排水口下设置有导流管。本实用新型通过排水管道将沟槽内积水导流到设置的排水处,可以减少排水口反灌的风险,通过各节两端设置的凹槽和凸起,提高两节之间的密封性,针对沟槽内线缆 / 线管布置,本申请的沟槽在内部下侧设置凸起部,将管架直接放置在凸出沿后即可以实现线缆 / 线管的方便布置。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A fabricated electrical power trench, characterized by, It includes prefabricated sections and cover plates. The prefabricated sections include standard sections and drainage sections. The prefabricated sections have a U-shaped cross-section and a raised strip on the inner side of the top. The cover plates have downward raised strips on both sides. The cover plates are staggered with the prefabricated sections during installation, and the joint between the two cover plates is located in the central area of ​​the prefabricated sections.

2. The fabricated power trench of claim 1, wherein, A horizontal protrusion is provided on the inner side of one end face of the precast section, and a horizontal groove is provided on the other end face.

3. The fabricated power trench of claim 1, wherein, At least one connecting groove is provided on each side of the precast section near the two end faces, and a through hole is provided between the connecting groove and the end face.

4. The fabricated power trench of claim 1, wherein, A flow guide channel is provided at the center of the bottom of the precast section, and the flow guide channel is parallel to the direction of trench laying.

5. The prefabricated power trench according to claim 4, characterized in that, A drain outlet is provided in the guide groove of the drainage section, and a guide pipe is provided below the drain outlet.

6. The fabricated power trench of claim 4, wherein, Several longitudinal support plates are provided at the bottom of the prefabricated section. The longitudinal support plates are perpendicular to the guide channel. The longitudinal support plates are provided with at least one interruption groove. A pad is provided on the longitudinal support plate. The pad is provided with openings or slots.

7. The fabricated power trench of claim 1, wherein, The prefabricated section has a protruding edge at the middle of the inner side of both sides; the assembled power trench also includes a pipe rack, which includes a central plate and several limiting rods. The width of the central plate is the same as the inner width of the upper part of both sides of the drainage section. An opening or slot is provided on the central plate. The limiting rods pass through the central plate, with their bottoms contacting the bottom of the inner side of the drainage section and their tops extending below the cover plate.

8. The fabricated power trench of claim 1, wherein, The cover plate has grooves at its four corners, and lifting rings are installed in the grooves. The top of the lifting rings is flush with the cover plate.