一种电网设备自动试验系统
The automatic testing system for power grid equipment enables the automated collection, processing, and report generation of test data, solving the problem of low efficiency in traditional power grid equipment test data management, improving data accuracy and testing efficiency, and enhancing the management level of ultra-high voltage power grid projects.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- BEIJING NORTH STAR DIGITAL REMOTE SENSING TECH CO LTD
- Filing Date
- 2025-05-19
- Publication Date
- 2026-07-17
AI Technical Summary
Traditional methods of managing test data for power grid equipment are inefficient, prone to errors, and cannot meet the complex and ever-changing management needs of ultra-high voltage power grid projects.
Design an automatic testing system for power grid equipment, which integrates the tested equipment, testing equipment, terminal equipment, automatic testing management platform and data communication network to realize the automatic collection, processing and report generation of test data.
It has enabled the automated collection, processing and report generation of test data, improved data accuracy and test efficiency, reduced the complexity and error rate of manual operation, and enhanced the management level of UHV electrical engineering projects in the power grid.
Smart Images

Figure CN224520756U_ABST
Abstract
Claims
1. A power grid equipment automatic testing system, characterized in that, include: Test device (100), test equipment (200), terminal equipment (300), automatic test management platform (400), data communication network (500); The test device (100), the test device (200), the terminal device (300), and the automatic test management platform (400) are respectively connected to the data communication network (500); The terminal device (300) configures test tasks for the automatic test management platform (400) through the data communication network (500); The automatic test management platform (400) controls the test equipment (200) to conduct tests on the test equipment (100) through the data communication network (500) according to the test task, and processes the test results and generates a test report.
2. The power grid equipment automatic testing system of claim 1, wherein, The tested equipment (100) includes: a main transformer, a reactor, and a combined electrical appliance.
3. The power grid equipment automatic testing system of claim 1, wherein, The test equipment (200) includes: a DC resistance tester, a voltage ratio tester, and a comprehensive tester.
4. The power grid equipment automatic testing system of claim 1, wherein, The terminal device (300) includes: mobile phone and tablet computer.
5. The power grid equipment automatic testing system of claim 1, wherein, The automated test management platform (400) includes: The basic information configuration module (410) is used to obtain the basic information of the experiment and perform basic configuration of the experiment system based on the basic information of the experiment; The test device configuration module (420) is used to acquire information of each test device (100) in the test system, and to summarize and manage the acquired test device information in a unified manner. The test task configuration module (430) is used to configure the test equipment (200) and the test device (100) based on the test task and test items, and to conduct the test according to the test configuration results; The test report generation module (440) is used to process and summarize the test results data, generate test reports, and display them.
6. The power grid equipment automatic testing system of claim 5, wherein, The basic information for the test includes, but is not limited to, various parameters and characteristics of the test standard library for ultra-high voltage power grid engineering equipment.
7. The power grid equipment automatic testing system of claim 6, wherein, Configure the basic information of the test system, including: the basic information of the test system, project information, measurement items, test project templates, test standard requirements, and data analysis rules.
8. The power grid equipment automatic testing system of claim 5, wherein: In the experimental system, each test device (100) has a corresponding ID value, and each test device (100) can be effectively distinguished and managed through the unique ID value.
9. The power grid equipment automatic testing system of claim 5, wherein: The test tasks and test items are set by the test personnel through the terminal device (300) according to actual needs.
10. The power grid equipment automatic testing system of claim 1, wherein, The data communication network (500) includes: a wireless communication module (510) and a wired communication module (520).