一种电网设备自动试验系统

The automatic testing system for power grid equipment enables the automated collection, processing, and report generation of test data, solving the problem of low efficiency in traditional power grid equipment test data management, improving data accuracy and testing efficiency, and enhancing the management level of ultra-high voltage power grid projects.

CN224520756UActive Publication Date: 2026-07-17BEIJING NORTH STAR DIGITAL REMOTE SENSING TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
BEIJING NORTH STAR DIGITAL REMOTE SENSING TECH CO LTD
Filing Date
2025-05-19
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Traditional methods of managing test data for power grid equipment are inefficient, prone to errors, and cannot meet the complex and ever-changing management needs of ultra-high voltage power grid projects.

Method used

Design an automatic testing system for power grid equipment, which integrates the tested equipment, testing equipment, terminal equipment, automatic testing management platform and data communication network to realize the automatic collection, processing and report generation of test data.

Benefits of technology

It has enabled the automated collection, processing and report generation of test data, improved data accuracy and test efficiency, reduced the complexity and error rate of manual operation, and enhanced the management level of UHV electrical engineering projects in the power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224520756U_ABST
    Figure CN224520756U_ABST
Patent Text Reader

Abstract

本实用新型涉及电网设备测试技术领域,具体为一种电网设备自动试验系统,包括:被试设备,试验设备,终端设备,自动试验管理平台,数据通信网路;所述被试设备、所述试验设备、所述终端设备、所述自动试验管理平台分别与所述数据通信网路连接;所述终端设备通过所述数据通信网路对所述自动试验管理平台进行试验任务配置;所述自动试验管理平台根据所述试验任务,通过所述数据通信网路控制所述试验设备对所述被试设备进行试验,并对试验结果进行处理、生成试验报告。本实用新型实现了试验数据的自动化收集、处理与报告生成,提高了数据准确性和试验效率,降低了人工操作的复杂性和错误率,升了电网特高压电气工程的管理水平和整体工作效率。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A power grid equipment automatic testing system, characterized in that, include: Test device (100), test equipment (200), terminal equipment (300), automatic test management platform (400), data communication network (500); The test device (100), the test device (200), the terminal device (300), and the automatic test management platform (400) are respectively connected to the data communication network (500); The terminal device (300) configures test tasks for the automatic test management platform (400) through the data communication network (500); The automatic test management platform (400) controls the test equipment (200) to conduct tests on the test equipment (100) through the data communication network (500) according to the test task, and processes the test results and generates a test report.

2. The power grid equipment automatic testing system of claim 1, wherein, The tested equipment (100) includes: a main transformer, a reactor, and a combined electrical appliance.

3. The power grid equipment automatic testing system of claim 1, wherein, The test equipment (200) includes: a DC resistance tester, a voltage ratio tester, and a comprehensive tester.

4. The power grid equipment automatic testing system of claim 1, wherein, The terminal device (300) includes: mobile phone and tablet computer.

5. The power grid equipment automatic testing system of claim 1, wherein, The automated test management platform (400) includes: The basic information configuration module (410) is used to obtain the basic information of the experiment and perform basic configuration of the experiment system based on the basic information of the experiment; The test device configuration module (420) is used to acquire information of each test device (100) in the test system, and to summarize and manage the acquired test device information in a unified manner. The test task configuration module (430) is used to configure the test equipment (200) and the test device (100) based on the test task and test items, and to conduct the test according to the test configuration results; The test report generation module (440) is used to process and summarize the test results data, generate test reports, and display them.

6. The power grid equipment automatic testing system of claim 5, wherein, The basic information for the test includes, but is not limited to, various parameters and characteristics of the test standard library for ultra-high voltage power grid engineering equipment.

7. The power grid equipment automatic testing system of claim 6, wherein, Configure the basic information of the test system, including: the basic information of the test system, project information, measurement items, test project templates, test standard requirements, and data analysis rules.

8. The power grid equipment automatic testing system of claim 5, wherein: In the experimental system, each test device (100) has a corresponding ID value, and each test device (100) can be effectively distinguished and managed through the unique ID value.

9. The power grid equipment automatic testing system of claim 5, wherein: The test tasks and test items are set by the test personnel through the terminal device (300) according to actual needs.

10. The power grid equipment automatic testing system of claim 1, wherein, The data communication network (500) includes: a wireless communication module (510) and a wired communication module (520).