高密度集成电路引线框架的卸料、装盒一体式设备
By designing an integrated device that utilizes the collaborative operation of the material handling module and the transfer module, the automatic unloading and boxing of lead frames is achieved, solving the problem that existing equipment cannot handle unloading and boxing simultaneously, thus improving production efficiency and continuity.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- DONGGUAN ALLMERIT TECH CO LTD
- Filing Date
- 2025-08-13
- Publication Date
- 2026-07-17
AI Technical Summary
Existing equipment cannot simultaneously and efficiently unload and pack lead frames, resulting in poor production continuity and severely restricting overall production efficiency.
An integrated device was designed, which, through a support frame and a fixed frame, combined with a material handling module, a transfer module and a conveyor belt module, realizes the automatic unloading and boxing of lead wire frames. The coordinated operation of the modules realizes the automatic pushing out, conveying and loading of lead wire frames in the material box.
This allows for the simultaneous unloading and packaging of lead frames, improving production efficiency and continuity while reducing waiting time between processes.
Smart Images

Figure CN224521599U_ABST