A transformer hoisting tool

CN224530447UActive Publication Date: 2026-07-21HEBEI ZHONGTE TRANSFORMER CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
HEBEI ZHONGTE TRANSFORMER CO LTD
Filing Date
2025-09-09
Publication Date
2026-07-21

AI Technical Summary

Technical Problem

Transformer installation and maintenance are complex and costly.

Method used

Design a transformer hoisting fixture, including a utility pole, upper channel steel, lower channel steel, supporting channel steel and transformer. The transformer is hoisted and inspected by using hoisting cross braces and hoists, and the fixing strength is improved by using U-shaped clamps and tie rods.

Benefits of technology

It simplifies the installation and maintenance process of transformers, reduces operational difficulty and costs, and improves maintenance efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224530447U_ABST
    Figure CN224530447U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of hoisting tool of transformer, it includes telegraph pole, upper channel steel, lower channel steel, support channel steel and transformer, upper channel steel is fixedly arranged in telegraph pole middle position, lower channel steel is fixedly arranged in telegraph pole middle position, and it is located upper channel steel bottom, support channel steel is fixedly arranged on lower channel steel, transformer is fixedly arranged on support channel steel, transformer bottom is fixedly provided with support leg, support leg is fixedly arranged on support channel steel. By the setting of upper channel steel, not only can be used for the installation of hoisting cross brace and hoist gourd, to facilitate the hoisting work of transformer, saves hoisting cost, after transformer installation is completed, upper channel steel is moved down and fixed with support channel steel, the fixing strength of support channel steel is enhanced, and when transformer is overhauled later, upper channel steel is moved to appropriate height, hoisting cross brace and hoist gourd are installed on upper channel steel, transformer core is hoisted, improve transformer maintenance efficiency, save hoisting cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of transformer installation technology, and in particular to a transformer hoisting fixture. Background Technology

[0002] Transformers are mainly composed of an iron core and a housing. They are relatively heavy and are core equipment in the power system.

[0003] First, when installing transformers outdoors, specialized hoisting equipment is required to lift them to the top of the pole and secure them to the mounting platform. Second, transformers operating for extended periods are prone to aging or malfunctions, also necessitating specialized hoisting equipment for lifting and repairing the transformer or its core. Both transformer installation and repair involve complex processes, high operational difficulty, and consequently, high costs. Therefore, a transformer hoisting fixture is proposed. Utility Model Content

[0004] The purpose of this utility model is to propose a transformer hoisting tool to solve the problems of high difficulty and high cost in the installation and subsequent maintenance of existing transformers.

[0005] To achieve the above objectives, the technical solution of this utility model is implemented as follows:

[0006] A transformer hoisting fixture, comprising:

[0007] A utility pole; an upper channel steel, fixedly installed in the middle of the utility pole; a lower channel steel, fixedly installed in the middle of the utility pole and located at the bottom of the upper channel steel; a supporting channel steel, fixedly installed on the lower channel steel; a transformer, fixedly installed on the supporting channel steel, the bottom of the transformer being fixedly provided with a support leg, the support leg being fixedly installed on the supporting channel steel.

[0008] Furthermore, there are two utility poles, which are arranged symmetrically at intervals. There are also two upper channel steels and two lower channel steels. The two upper channel steels are fixedly installed on the same side of the two utility poles and at the same height. The two lower channel steels are also fixedly installed on the same side of the two utility poles and at the same height.

[0009] Furthermore, a lifting cross brace is fixedly installed between the two upper channel steels, a through slot is opened in the middle of the lifting cross brace, a lifting shaft is fixedly installed in the middle of the lifting cross brace, and a hoist is installed on the lifting shaft.

[0010] Furthermore, U-shaped clamps are fixedly installed on the upper channel steel and the lower channel steel, and the upper channel steel and the lower channel steel are respectively fixed on the utility pole by the U-shaped clamps.

[0011] Furthermore, there are two supporting channel steels, which are located on both sides of the utility pole, and a tie rod is fixedly installed between the two supporting channel steels.

[0012] Compared with the prior art, the present invention has the following beneficial effects:

[0013] The transformer hoisting fixture described in this utility model, through the setting of the upper channel steel, can not only be used for the installation of hoisting cross braces and hoists to facilitate the hoisting of the transformer and save hoisting costs, but also, after the transformer is installed, the upper channel steel can be moved downward and fixed with the supporting channel steel, which enhances the fixing strength of the supporting channel steel. Moreover, during the later maintenance of the transformer, the upper channel steel can be moved to a suitable height, and the hoisting cross braces and hoists can be installed on the upper channel steel to hoist the transformer core, thereby improving the efficiency of transformer maintenance and saving hoisting costs. Attached Figure Description

[0014] The accompanying drawings, which form part of this utility model, are used to provide a further understanding of the utility model. The illustrative embodiments of the utility model and their descriptions are used to explain the utility model and do not constitute an undue limitation of the utility model. In the drawings:

[0015] Figure 1 This is a schematic diagram of a transformer lifting fixture according to an embodiment of the present utility model;

[0016] Figure 2 This is a schematic diagram of the completed transformer hoisting process according to an embodiment of the present utility model.

[0017] Figure 3 This is a top view of a transformer hoisting fixture according to an embodiment of the present utility model;

[0018] Figure 4 As described in the embodiments of this utility model Figure 3 Enlarged view at point I;

[0019] Figure 5 This is a schematic diagram of the upper channel steel being fixed on the supporting channel steel according to an embodiment of the present invention;

[0020] Figure 6 As described in the embodiments of this utility model Figure 5 Enlarged view of section II in the middle.

[0021] Explanation of reference numerals in the attached drawings: 1. Utility pole; 2. Upper channel steel; 3. Lower channel steel; 4. Support channel steel; 401. Tie rod; 5. Transformer; 501. Outrigger; 6. Lifting cross brace; 601. Through channel; 602. Lifting shaft; 603. Lifting hoist; 7. U-shaped clamp. Detailed Implementation

[0022] It should be noted that, unless otherwise specified, the embodiments and features described in these embodiments can be combined with each other.

[0023] In the description of this utility model, it should be noted that if terms such as "upper," "lower," "inner," or "back" appear, indicating orientation or positional relationship, they are based on the orientation or positional relationship shown in the accompanying drawings and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. Furthermore, if terms such as "first" or "second" appear, they are also used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0024] The present invention will now be described in detail with reference to the accompanying drawings and embodiments.

[0025] This embodiment relates to a transformer hoisting fixture, the overall structure of which is as follows: Figure 1 and Figure 2 As shown, it includes a utility pole 1, an upper channel steel 2, a lower channel steel 3, a supporting channel steel 4, and a transformer 5.

[0026] The upper channel steel 2 is fixedly installed in the middle of the utility pole 1, the lower channel steel 3 is fixedly installed in the middle of the utility pole 1 and located at the bottom of the upper channel steel 2, the supporting channel steel 4 is fixedly installed on the lower channel steel 3, the transformer 5 is fixedly installed on the supporting channel steel 4, and the bottom of the transformer 5 is fixedly provided with a support leg 501, which is fixedly installed on the supporting channel steel 4.

[0027] It is worth mentioning that the support channel steel 4 is fixedly installed on the lower channel steel 3 for the installation of the transformer 5. The support leg 501 is welded to the bottom of the transformer 5 and fixed to the support channel steel 4 by bolt assembly.

[0028] As a preferred option, it remains as follows Figure 1 , Figure 2 , Figure 5 and Figure 6 As shown, in this embodiment, there are two utility poles 1, which are arranged symmetrically at intervals. There are two upper channel steels 2 and two lower channel steels 3. The two upper channel steels 2 are respectively fixedly installed on the same side of the two utility poles 1 and at the same height. The two lower channel steels 3 are respectively fixedly installed on the same side of the two utility poles 1 and at the same height.

[0029] It should be noted that the two upper channel steels 2 are located on the same side of the two utility poles 1 and at the same height. They are used for the installation of the horizontal support 6 when the transformer 5 is hoisted. The two lower channel steels 3 are located on the same side of the two utility poles 1 and at the same height. They are used to improve the ease of installation of the support channel steel 4 and at the same time improve the fixing strength of the support channel steel 4.

[0030] As a preferred option, it remains as follows Figure 2 , Figure 3 and Figure 4 As shown, in this embodiment, a lifting cross brace 6 is fixedly installed between the two upper channel steels 2. A through groove 601 is opened in the middle of the lifting cross brace 6. A lifting shaft 602 is fixedly installed in the middle of the lifting cross brace 6. A hoist 603 is installed on the lifting shaft 602.

[0031] Specifically, bolt mounting holes are provided at the top middle position of the upper channel steel 2 and at both ends of the lifting cross brace 6. The two ends of the lifting cross brace 6 are fixedly installed on the two upper channel steels 2 by bolt assemblies. The lifting shaft 602 is located in the middle position of the lifting channel steel and is used to install the hoist 603. The through slot 601 is opened on the lifting cross brace 6 at the bottom of the lifting shaft 602. The hook at the upper end of the hoist 603 passes through the through slot 601 and is installed on the lifting shaft 602. The lower end of the hoist 603 has a hook for lifting the transformer 5.

[0032] As a preferred option, it remains as follows Figure 1 , Figure 2 , Figure 5 and Figure 6 As shown, in this embodiment, U-shaped clamps 7 are fixedly installed on the upper channel steel 2 and the lower channel steel 3, and the upper channel steel 2 and the lower channel steel 3 are respectively fixed to the utility pole 1 by the U-shaped clamps 7. Specifically, each upper channel steel 2 and each lower channel steel 3 are respectively fixedly installed on the utility pole 1 by the U-shaped clamps 7 and bolt assemblies.

[0033] As a preferred option, it remains as follows Figure 2 , Figure 3 , Figure 5 and Figure 6 As shown, in this embodiment, there are two supporting channel steels 4, located on both sides of the utility pole 1, and a tie rod 401 is fixedly installed between the two supporting channel steels 4. Specifically, the two supporting channel steels 4 are installed on both sides of the two utility poles 1, and each utility pole 1 has two tie rods 401 on both sides, which fix the two supporting channel steels 4 to the utility pole 1.

[0034] Working principle: Transformer 5 is typically installed outdoors between two utility poles 1. First, two workers climb the two utility poles 1 respectively, installing the upper channel steel 2 and lower channel steel 3 at the designated height. The two upper channel steel 2 and two lower channel steel 3 are fixed to the utility poles 1 using U-shaped clamps 7 and bolt assemblies. Then, the two ends of the lifting cross brace 6 are fixed between the two upper channel steel 2 using bolt assemblies. The upper hook on the hoist 603 is suspended from the lifting shaft 602 of the lifting cross brace 6. The lower hook on the hoist 603 is extended downwards to the ground under manual operation. At this time, the lifting wire rope is installed on the lifting ring at the top of the transformer 5 on the ground. The middle part of the wire rope is a wire rope sling. The wire rope sling is attached to the lower hook of the hoist 603. Then, one of the installation workers manually... Pull the hand chain of the hoist 603 at a constant clockwise speed to raise the transformer 5 to a suitable height. At this time, the height of the bottom support leg 501 of the transformer 5 is higher than the height of the lower channel steel 3. Then, another worker places two support channel steels 4 on the lower channel steel 3, adjusts the position of the two support channel steels, and fixes the support channel steel 4 on this worker's side to the lower channel steel 3 with bolt assembly. At the same time, fix the two support channel steels 4 on this worker's side to the utility pole 1 with pull rod 401. Then, manually pull the hand chain counterclockwise at a constant speed to lower the support leg 501 of the transformer 5 onto the support channel steel 4. At this time, the worker releases the hand chain and fixes the other end of the support channel steel 4 to the lower channel steel 3 and the utility pole 1 respectively with bolt assembly and pull rod 401. Then, fix the bottom support leg 501 of the transformer 5 to the support channel steel 4 with bolt assembly.

[0035] Bolt mounting holes are provided at both ends of the bottom of the upper channel steel 2. After the transformer 5 and the supporting channel steel 4 are installed, the hoist 603 and the lifting cross brace 6 are removed. At this time, two workers loosen the U-shaped clamp 7 of the upper channel steel 2, move the upper channel steel 2 down to the top of the supporting channel steel 4, fix the upper channel steel 2 to the supporting channel steel 4 with bolt assembly, and then fix the upper channel steel 2 to the utility pole 1 with the U-shaped clamp 7 to enhance the fixing strength of the supporting channel steel 4.

[0036] When transformer 5 is in operation for a long time, it is necessary to carry out regular inspection and maintenance. If it is necessary to lift the core of transformer 5 for inspection and maintenance, the above installation process can be followed. Simply loosen the U-shaped clamps 7 of the two upper channel steels 2, move the two upper channel steels 2 upward to a suitable height, and install the lifting cross brace 6 and hoist 603 between the two upper channel steels 2. The core of transformer 5 can then be lifted for inspection and maintenance. The inspection and lifting is simple, easy to operate, and saves costs.

[0037] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A transformer hoisting fixture, characterized in that, include: Utility pole (1); The upper channel steel (2) is fixedly installed in the middle position of the utility pole (1); The lower channel steel (3) is fixedly installed in the middle of the utility pole (1) and located at the bottom of the upper channel steel (2); Support channel steel (4) is fixedly installed on the lower channel steel (3); The transformer (5) is fixedly installed on the supporting channel steel (4). The bottom of the transformer (5) is fixedly provided with a support leg (501), which is fixedly installed on the supporting channel steel (4).

2. The transformer hoisting fixture according to claim 1, characterized in that: There are two utility poles (1), which are arranged symmetrically at intervals. There are two upper channel steels (2) and two lower channel steels (3). The two upper channel steels (2) are respectively fixedly installed on the same side of the two utility poles (1) and at the same height. The two lower channel steels (3) are respectively fixedly installed on the same side of the two utility poles (1) and at the same height.

3. The transformer hoisting fixture according to claim 1, characterized in that: A hoisting cross brace (6) is fixedly installed between the two upper channel steels (2). A through slot (601) is opened in the middle of the hoisting cross brace (6). A hoisting shaft (602) is fixedly installed in the middle of the hoisting cross brace (6). A hoisting hoist (603) is installed on the hoisting shaft (602).

4. The transformer hoisting fixture according to claim 1, characterized in that: U-shaped clamps (7) are fixedly installed on the upper channel steel (2) and the lower channel steel (3), and the upper channel steel (2) and the lower channel steel (3) are respectively fixed on the utility pole (1) by the U-shaped clamps (7).

5. The transformer hoisting fixture according to claim 1, characterized in that: There are two support channel steels (4), which are located on both sides of the utility pole (1), and a tie rod (401) is fixedly installed between the two support channel steels (4).