Steel structure full assembly type railway passenger bridge structure

CN224548936UActive Publication Date: 2026-07-24CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
Filing Date
2025-06-16
Publication Date
2026-07-24

AI Technical Summary

Technical Problem

Traditional railway passenger overpass construction suffers from problems such as unstable on-site welding quality, low construction efficiency, and environmental pollution caused by wet operations.

Method used

The fully prefabricated design utilizes high-strength steel and a combination of connecting plates and bolts to achieve zero welding and zero wet work on site. By prefabricating components in the factory and assembling them on site, the quality of welds and connection stability are ensured.

Benefits of technology

It improves construction efficiency, ensures construction quality and safety, reduces environmental pollution, lowers costs, and meets energy conservation and environmental protection requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224548936U_ABST
    Figure CN224548936U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of steel structure full assembly type railway passenger footbridge structures, belong to building technical field.The footbridge structure includes stand, steel structure main module, channel steel purline, upper H type steel unit and lower H type steel concrete slab unit.Bolt hole is reserved when upper H type steel unit is prefabricated in factory, and steel structure main module is connected by welding steel plate and connecting plate bolt connection to realize overall connection, lower H type steel concrete slab unit is the full assembly floor support plate of structure and building decoration integration, site zero welding, zero wet operation.The utility model has the advantages of high construction efficiency, stable and reliable quality, high safety, energy saving and environmental protection etc., solve many problems existing in the construction of traditional railway passenger footbridge, suitable for passenger traffic facilities construction of railway station yard and other traffic hubs.
Need to check novelty before this filing date? Find Prior Art