Pipe pile for building construction
By designing horizontal and side plates on the pipe piles in building construction to create free space for placing lifting devices, the problems of instability of work vehicles on soft foundations and lack of fulcrum for steel pipe columns are solved, enabling efficient and safe construction by multiple people.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- ZHEJIANG XINGTU BRIDGE TEMPORARY STEEL STRUCTURE ENG
- Filing Date
- 2025-07-18
- Publication Date
- 2026-07-31
AI Technical Summary
In existing technologies, the work vehicle is unstable on soft foundations or uneven roads and can only carry two people, resulting in low efficiency of high-altitude operations and a lack of fulcrum for the steel pipe columns, which affects construction efficiency.
A pipe pile for building construction has been designed with a horizontal plate and two side plates to form a space for placing lifting equipment. Supports and jacks are installed on the steel pipe pile to enhance its load-bearing strength, making it suitable for multi-person operations.
It provides improved construction efficiency and safety under conditions where multiple workers are not restricted by the foundation, and enhances the load-bearing capacity of steel pipe piles.
Smart Images

Figure CN224578618U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bridge construction technology, and in particular to pipe piles used in building construction. Background Technology
[0002] During bridge support construction, it is unavoidable to perform work at height when installing horizontal bracing, diagonal bracing, wall anchors, load-bearing beams, and unloading blocks. Existing technology uses work vehicles for these operations; however, these vehicles have high site requirements, and they can tilt when encountering soft foundations or uneven road surfaces. Furthermore, the load capacity of these work vehicles is limited to only two people, resulting in a limited working area and low installation efficiency.
[0003] Currently, steel pipe columns are used as the main support components for bridge supports. However, the existing steel pipe columns are cylindrical in shape. When it is necessary to lift the beams above the steel pipe columns, there is a lack of leverage points when setting up lifting devices, which brings inconvenience to construction. Utility Model Content
[0004] The technical problem to be solved by this utility model is to overcome the shortcomings of the existing technology and provide a pipe pile for building construction that is not limited by the foundation and can support multiple people working.
[0005] The technical solution adopted by this utility model is as follows: a pipe pile for building construction, including a steel pipe pile, the steel pipe pile having a first plate and a second plate, the outer edges of the first plate and the second plate extending out of the pipe wall of the steel pipe pile, the first plate and the second plate being arranged vertically at intervals, the pipe wall of the steel pipe pile being fixedly connected to a horizontally arranged transverse plate and vertically arranged side plates, the side plates being spaced apart and fixedly connected to the transverse plate, the side of the side plates away from the pipe wall having an opening, the first plate having a notch, the notch being located above the transverse plate.
[0006] The upper ends of the two side plates are fixedly connected to the first plate.
[0007] There is a gap between the horizontal plate and the second plate, and a support member is provided in the gap. The upper and lower ends of the support member are fixedly connected to the lower surface of the horizontal plate and the upper surface of the second plate, respectively.
[0008] The outer edge of the notch extends into a side panel.
[0009] The side panel has two openings, which are on the same horizontal plane.
[0010] Among them, a drop block is provided above the first plate, and a beam is provided above the drop block.
[0011] The empty space above the horizontal plate and between the side plates is a location for placing the lifting device.
[0012] The lifting device can be a jack, a hydraulic cylinder, or a pneumatic cylinder.
[0013] The first plate has a jacking block above it, and a beam is located above the jacking block. A lifting device is placed at the location for placing the lifting device to lift the beam.
[0014] Compared with the prior art, the beneficial effects of this utility model are as follows:
[0015] The pipe pile of this utility model has a spare space on the side mainly formed by a transverse plate and two side plates. During the construction process, lifting devices such as jacks can be set in this position, and the lifting devices can be removed from the opening after use. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the structure of this utility model.
[0017] Figure 2 yes Figure 1 A partially enlarged structural diagram of part A shown.
[0018] Figure 3 yes Figure 2 A schematic diagram of the structure after the lifting device has been placed. Detailed Implementation
[0019] The present invention will be further described below with reference to the accompanying drawings and embodiments.
[0020] like Figures 1 to 3 As shown, the pipe pile for building construction described in this embodiment includes a steel pipe pile 1. The steel pipe pile 1 has a first plate 11 and a second plate 12. The outer edges 111 of the first plate 11 and the second plate 12 extend out of the pipe wall of the steel pipe pile 1. The first plate 11 and the second plate 12 are arranged vertically at intervals. The pipe wall of the steel pipe pile 1 is fixedly connected to a horizontally arranged transverse plate 2 and two vertically arranged side plates 3. The side plates 3 are spaced apart and fixedly connected to the transverse plate 2. The side of the side plates away from the pipe wall has an opening 31. The first plate 11 has a notch 110, which is located above the transverse plate 2. In this embodiment, a position for placing a lifting device 7 is formed on the outer side of the pipe wall, mainly composed of the transverse plate 2 and the two side plates 3. When disassembling or assembling the beam 6, a jack can be placed at this position. After the beam is installed, the jack can be removed from the opening 31, which greatly improves the installation efficiency and construction safety.
[0021] In a preferred embodiment, the upper ends of the two side plates 3 are fixedly connected to the first plate 11. In this embodiment, after the upper ends of the two side plates 3 are fixedly connected to the first plate 11, the two side plates 3 provide support for the first plate 11.
[0022] In a preferred embodiment, a gap exists between the transverse plate 2 and the second plate 12, and a support member 4 is provided within this gap. The upper and lower ends of the support member 4 are fixedly connected to the lower surface of the transverse plate 2 and the upper surface of the second plate 12, respectively. In this embodiment, the transverse plate 2 and the second plate 12 are fixed by the support member 4, thereby enhancing the stress resistance of the transverse plate 2 and the second plate 12.
[0023] In a preferred embodiment, the outer edge 111 of the notch extends out to form the side plate 3.
[0024] In a preferred embodiment, the side plate 3 is provided with two openings 30, and the two openings 30 are on the same horizontal plane.
[0025] In a preferred embodiment, a drop block 5 is provided above the first plate 11, and a beam 6 is provided above the drop block 5.
[0026] In a preferred embodiment, the space above the transverse plate 2 and between the side plate 3 is a location for placing the lifting device.
[0027] In a preferred embodiment, a relief block 5 is provided above the first plate 11, and a beam 6 is provided above the relief block 5; a lifting device 7 is placed at the position for placing the lifting device 7 to lift the beam 6. In a preferred embodiment, the lifting device 7 can be a jack, a hydraulic cylinder, or a pneumatic cylinder.
Claims
1. A pipe pile for construction work, characterized in that, The device includes a steel pipe pile, which has a first plate and a second plate. The outer edges of the first plate and the second plate extend out of the pipe wall of the steel pipe pile. The first plate and the second plate are arranged vertically at intervals. The pipe wall of the steel pipe pile is fixedly connected to a horizontally arranged transverse plate and two vertically arranged side plates. The side plates are spaced apart and fixedly connected to the transverse plate. The side of the side plates away from the pipe wall has an opening. The first plate has a notch located above the transverse plate.
2. A pipe pile for construction work as recited in claim 1, wherein The upper ends of the two side plates are fixedly connected to the first plate.
3. The pipe pile for construction work according to claim 1, wherein There is a gap between the horizontal plate and the second plate, and a support member is provided in the gap. The upper and lower ends of the support member are fixedly connected to the lower surface of the horizontal plate and the upper surface of the second plate, respectively.
4. The pipe pile for construction work according to claim 1, wherein The outer edge of the notch extends into the side panel.
5. The pipe pile for building construction as described in claim 1, characterized in that, The side panel has two openings, which are on the same horizontal plane.
6. The pipe pile for construction work according to claim 1, wherein A slack block is provided above the first plate, and a beam is provided above the slack block.
7. The pipe pile for construction work according to claim 1, wherein The empty space above the horizontal plate and between the side plates is a location for placing the lifting device.
8. A pipe pile for building construction according to claim 7, wherein The lifting device can be a jack, a hydraulic cylinder, or a pneumatic cylinder.
9. The pipe pile for construction work according to claim 7, wherein A jacking block is provided above the first plate, and a beam is provided above the jacking block; a lifting device is placed at the position for placing the lifting device to lift the beam.