Temporary closure construction for handover of a basement work area
By setting up temporary sealing structures with concrete retaining walls and baffles and embedding double layers of steel bars in the basement construction area, the problem of exposed steel bars and waterproof membrane was solved, the construction quality and waterproof performance were improved, and the risk of construction disturbance was reduced.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- SHANGHAI CONSTRUCTION NO 7 (GROUP) CO LTD
- Filing Date
- 2025-06-25
- Publication Date
- 2026-07-31
AI Technical Summary
In basement construction carried out in batches, components such as steel bars and waterproof membranes are easily exposed, affecting the construction quality and the waterproof performance of the connection points. In addition, the operation of construction vehicles can easily cause disturbance risks.
Concrete retaining walls and concrete slabs are installed in the construction area, and double-layer bidirectional steel bars are installed inside them to form a temporary sealing structure, which enhances the waterproof performance and stability of the connection points.
It effectively protects steel bars and waterproof membranes, prevents backfill soil from falling, reduces the risk of construction disturbance, improves waterproof performance, and ensures the stability and quality of the construction environment.
Smart Images

Figure CN224578767U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building engineering technology, and in particular to a temporary sealing structure applied to the handover area of basement construction processes. Background Technology
[0002] To meet people's growing living and spiritual needs, urban renewal and renovation are becoming increasingly frequent, such as installing elevators and adding underground parking garages. Furthermore, many basement constructions cannot be completed in one go and require phased construction, making the handling of connection points particularly important. Generally, a project's basement is a single, integrated project without structural gaps. However, some projects adopt a phased construction approach for underground works, where the steel reinforcement and waterproofing membranes pre-installed in the earlier phases are easily exposed, hindering subsequent construction and compromising construction quality. To address the protection issues of underground structural connection areas, this application designs a temporary sealing structure for basement construction area junctions. Utility Model Content
[0003] This utility model addresses the problems and shortcomings of existing technologies by providing a novel temporary sealing structure for the handover of basement work areas.
[0004] The present invention solves the above-mentioned technical problems through the following technical solution:
[0005] This utility model provides a temporary sealing structure for the junction of a basement work area, characterized in that: when there is an enclosure structure, a concrete retaining wall is set at a position perpendicular to the edge of the enclosure and the edge of the outer wall; when there is no enclosure structure, a concrete retaining wall is set at a position extending outward from the junction position by a first predetermined distance; a concrete baffle is erected on the top of the two opposing concrete retaining walls; the concrete baffle is a second predetermined distance away from the top of the basement structure; each concrete retaining wall is equipped with double-layer bidirectional steel bars; and the concrete baffle is equipped with double-layer bidirectional steel bars.
[0006] The positive and progressive effects of this utility model are as follows:
[0007] This invention effectively solves the quality problems of basement connection areas constructed in batches by adding temporary seals. These seals can be retained later to further enhance the waterproofing performance of the connection points. The seals can also be seen as a reinforcement measure for the basement, preventing disturbance to the basement connection points from the movement of construction vehicles.
[0008] This invention can effectively protect the waterproof membrane at the connection point; effectively protect the reserved reinforcing steel; effectively prevent backfill soil from falling, facilitate the protection of the on-site construction environment, and facilitate the cleaning of fallen soil; help enhance the waterproof performance of the basement connection point; and help reduce the risks (cracks, leaks, etc.) caused by the movement of construction vehicles. Attached Figure Description
[0009] Figure 1 This is a diagram of a temporary sealing structure for the handover of a basement work area, which is a preferred embodiment of this utility model.
[0010] Figure 2 This is a node diagram of the temporary sealing structure at the junction of the basement work area, which is a preferred embodiment of this utility model. Detailed Implementation
[0011] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, not all embodiments. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the protection scope of this utility model.
[0012] like Figure 1-2 As shown, this embodiment provides a temporary sealing structure for the junction of a basement work area, including: when there is an enclosure structure, a concrete retaining wall 1 is set at a position perpendicular to the edge of the enclosure and the edge of the outer wall; when there is no enclosure structure, a concrete retaining wall 1 is set at a position extending outward two meters perpendicular to the junction position; a concrete baffle 2 is erected on the top of the two opposing concrete retaining walls 1; the concrete baffle 2 is 300-500mm away from the top of the basement structure; each concrete retaining wall 1 is equipped with double-layer bidirectional C12@150 steel bars 3; and the concrete baffle 2 is equipped with double-layer bidirectional C12@150 steel bars 3.
[0013] The concrete retaining wall uses C30 concrete, and the concrete slab uses C30 concrete.
[0014] Note: This structure has been successfully applied in the Shanghai Jiao Tong University School of Medicine Pudong Campus Project (Section 2).
[0015] This invention effectively solves the quality problems of basement connection areas constructed in batches by adding temporary seals. These seals can be retained later to further enhance the waterproofing performance of the connection points. The seals can also be seen as a reinforcement measure for the basement, preventing disturbance to the basement connection points from the movement of construction vehicles.
[0016] This invention can effectively protect the waterproof membrane at the connection point; effectively protect the reserved reinforcing steel; effectively prevent backfill soil from falling, facilitate the protection of the on-site construction environment, and facilitate the cleaning of fallen soil; help enhance the waterproof performance of the basement connection point; and help reduce the risks (cracks, leaks, etc.) caused by the movement of construction vehicles.
[0017] While specific embodiments of this utility model have been described above, those skilled in the art should understand that these are merely illustrative examples, and the scope of protection of this utility model is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principles and essence of this utility model, but all such changes and modifications fall within the scope of protection of this utility model.
Claims
1. A temporary closure construction for a basement work area handover, characterized by, include: When there is an enclosure structure, a concrete retaining wall is set at a position perpendicular to the edge of the enclosure and the edge of the outer wall. When there is no enclosure structure, a concrete retaining wall is set at a position extending outward from the connection position by a first predetermined distance. A concrete baffle is erected on the top of the two concrete retaining walls that are set opposite each other. The concrete baffle is a second predetermined distance away from the top of the basement structure. Each concrete retaining wall is equipped with double-layer bidirectional steel bars, and the concrete baffle is equipped with double-layer bidirectional steel bars.
2. The temporary closure construction of a basement work area interface according to claim 1, wherein, A concrete retaining wall is installed two meters outward from the connection point.
3. The temporary closure construction of a basement work area interface according to claim 1, wherein, The concrete baffle is 300-500mm away from the top of the basement structure.
4. The temporary closure construction of a basement work area interface according to claim 1, wherein, The concrete retaining wall uses C30 concrete.
5. The temporary closure construction of a basement work area interface according to claim 1, wherein, The concrete used for the concrete baffle is C30 concrete.