Spliced steel pull rod of flower basket frame and outer wall scaffold

The design of spliced ​​steel tie rods solves the problem of fixed length of existing cantilever scaffold steel tie rods, enabling efficient transportation and length adjustment on the construction site, adapting to complex building structures, and improving construction efficiency.

CN224579041UActive Publication Date: 2026-07-31SHANGHAI CIVIL ENG GRP CO LTD OF CREC +1
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
SHANGHAI CIVIL ENG GRP CO LTD OF CREC
Filing Date
2025-06-23
Publication Date
2026-07-31

AI Technical Summary

Technical Problem

The existing steel tie rods of cantilever scaffolding have fixed lengths, which cannot meet the needs of different building structures. This leads to the need for secondary processing on the construction site, affecting efficiency, occupying space, and increasing transportation difficulties.

Method used

A splicing steel tie rod for a flower basket frame is provided. It is spliced ​​on the construction site by means of an upper tie rod and a lower tie rod. The length of the steel tie rod can be flexibly adjusted by utilizing the correspondence between the first fixing hole and the second fixing hole to adapt to complex shapes and special requirements of the structure.

Benefits of technology

It enables convenient transportation and flexible length adjustment of steel tie rods, improves construction efficiency, reduces on-site processing requirements, and adapts to complex building structures.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224579041U_ABST
    Figure CN224579041U_ABST
Patent Text Reader

Abstract

This utility model discloses a splicing steel tie rod for a flower basket frame and an external wall scaffolding. The steel tie rod includes an upper tie rod with a first connecting end at the top, suitable for fixing to the building's external wall, and a first fixing end at the bottom, having at least one first fixing hole; a lower tie rod with a second fixing end at the top, having a second fixing hole, and a second connecting end at the bottom, suitable for fixing to a suspension beam; and a first fastener with the first fixing end and the second fixing end stacked, and the first fixing hole and the second fixing hole facing each other, the first fastener passing through the first fixing hole and the second fixing hole. The upper and lower tie rods can be spliced ​​and assembled on the construction site, facilitating the transportation of the steel tie rods. Furthermore, when multiple first and / or second fixing holes are implemented, the overall length of the steel tie rod can be flexibly adjusted by adjusting the correspondence between the first and second fixing holes, better adapting to flower basket frame structures with complex shapes and special requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of construction, and further to a splicing steel tie rod for a flower basket frame and an external wall scaffolding. Background Technology

[0002] In the construction industry, a basket frame refers to a cantilevered scaffolding support system, mainly used in the construction of the exterior walls of high-rise or super high-rise buildings to provide a support platform for the scaffolding.

[0003] Currently, the length of steel tie rods in existing cantilever scaffolding is usually fixed. However, different building structures have different requirements for the length of steel tie rods on the construction site. The existing fixed-length steel tie rods of cantilever scaffolding cannot meet the requirements and need to be processed on the construction site, which affects the construction efficiency and has a significant impact on the organization and arrangement of the construction site.

[0004] Longer steel tie rods occupy a large space on the construction site and are quite heavy, which will take up a lot of construction space, increase the difficulty of transportation, hinder on-site construction operations, and reduce the efficiency of construction operations. Utility Model Content

[0005] To address the aforementioned technical problems, the purpose of this utility model is to provide a splicing steel tie rod for a flower basket frame and an external wall scaffolding. The upper and lower tie rods can be spliced ​​and assembled on the construction site, facilitating the transportation of the steel tie rods. Furthermore, when multiple first and / or second fixing holes are implemented, the overall length of the steel tie rod can be flexibly adjusted by adjusting the correspondence between the first and second fixing holes, thus better adapting to flower basket frame structures with complex shapes and special requirements.

[0006] To achieve the above objectives, the purpose of this utility model is to provide a splicing steel tie rod for a flower basket frame, including...

[0007] The upper pull rod has a first connecting end at its top, which is adapted to be fixed to the exterior wall of the building, and a first fixing end at its bottom, which has at least one first fixing hole.

[0008] A pull rod, the top of which has a second fixed end with a second fixed hole, and the bottom of which has a second connecting end, the second connecting end being adapted to be fixed to a suspension beam extending outward from the building's exterior wall;

[0009] The first fastener has the first fixed end of the upper pull rod and the second fixed end of the lower pull rod stacked together, and the first fixed hole and the second fixed hole are opposite to each other. The first fastener passes through the first fixed hole and the second fixed hole to fix the first fixed end and the second fixed end together.

[0010] In some embodiments, the pull-down rod further includes a connecting plate, a connecting rod, and a first ear plate. One end of the connecting rod is connected to the connecting plate, and the other end is connected to the first ear plate. The end of the first ear plate away from the connecting rod is adapted to be connected to the suspension beam. A second fixing hole is formed in the connecting plate, and the end of the connecting plate away from the connecting rod is adapted to be connected to the second fixing end of the pull-up rod.

[0011] In some embodiments, a second lug is provided at a predetermined position of the suspension beam, and the first lug is rotatably connected to the second lug.

[0012] In some embodiments, the first ear plate has a first ear hole at a predetermined position, the second ear plate has a second ear hole at a predetermined position, the first ear plate and the second ear plate are stacked, and the first ear hole and the second ear hole correspond to each other;

[0013] The spliced ​​steel tie rod of the flower basket frame further includes a second fastener that passes through the first ear hole and the second ear hole to rotatably connect the first ear plate to the second ear plate.

[0014] In some embodiments, the first fixed end of the upper pull rod has a mounting groove, and the second fixed end of the lower pull rod is adapted to be mounted in the mounting groove.

[0015] In some embodiments, the first fixed end of the upper pull rod has an insertion groove that extends along the axial direction of the upper pull rod and communicates with the mounting groove;

[0016] The first fixed end also has a locking groove, which is connected to both the insertion groove and the mounting groove;

[0017] The second fixed end of the pull rod has a locking protrusion that extends outward in a direction perpendicular to the axial direction of the pull rod;

[0018] During the process of inserting the second fixed end of the pull rod into the mounting groove, the locking protrusion is adapted to move within the insertion groove. When the second fixed end is inserted into the preset position within the mounting groove, the first fixing hole and the second fixing hole are staggered.

[0019] When the upper pull rod and the lower pull rod are rotated relative to each other, such that when the locking protrusion moves from the insertion groove into the locking groove, at least one of the first fixing holes corresponds to at least one of the second fixing holes.

[0020] In some embodiments, the first connecting end of the upper pull rod is provided with a fixing plate, and the fixing plate has a plurality of screw holes at a preset position;

[0021] The spliced ​​steel tie rod of the flower basket frame further includes a plurality of third fasteners, which are adapted to pass through a plurality of screw holes to fix the fixing plate to the exterior wall of the building.

[0022] In some embodiments, the spliced ​​steel tie rod of the flower basket frame further includes a vertical tie rod, one end of which is connected to the lower tie rod or the upper tie rod, and the other end is connected to the suspension beam.

[0023] In some embodiments, the spliced ​​steel tie rod of the flower basket frame further includes a horizontal tie rod, one end of which is connected to the upper tie rod or the lower tie rod, and the other end is connected to the exterior wall of the building.

[0024] According to another aspect of this application, an external wall scaffolding is further provided, comprising:

[0025] The spliced ​​steel tie rod of the flower basket frame described in any of the above items;

[0026] The first connecting end of the upper tie rod is fixed to the exterior wall of the building;

[0027] A suspension beam extends outward from one side of the building's exterior wall, and the second connecting end of the pull rod is adapted to be fixed to the end of the suspension beam away from the building's exterior wall. Attached Figure Description

[0028] The preferred embodiments will be described below in a clear and easy-to-understand manner, in conjunction with the accompanying drawings, to further explain the above-mentioned characteristics, technical features, advantages and implementation methods of this utility model.

[0029] Figure 1 This is a three-dimensional structural diagram of the spliced ​​steel tie rod of the flower basket frame according to a preferred embodiment of the present invention, taken from one perspective.

[0030] Figure 2 This is a three-dimensional structural schematic diagram of the spliced ​​steel tie rod of the flower basket frame, which is a preferred embodiment of this utility model.

[0031] Figure 3 This is a side view of the spliced ​​steel tie rod of the flower basket frame according to a preferred embodiment of the present invention.

[0032] Figure 4 This is a side view of a modified embodiment of the spliced ​​steel tie rod of the flower basket frame according to a preferred embodiment of the present invention.

[0033] Figure 5 This is a schematic diagram of another modified embodiment of the spliced ​​steel tie rod of the flower basket frame, which is a preferred embodiment of this utility model.

[0034] Figure 6 yes Figure 5 A schematic diagram of the exploded structure shown;

[0035] Figure 7 This is a schematic diagram of another variation of the spliced ​​steel tie rod of the flower basket frame, which is a preferred embodiment of this utility model. Detailed Implementation

[0036] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the specific implementation methods of this utility model will be described below with reference to the accompanying drawings. Obviously, the drawings described below are merely some embodiments of this utility model. For those skilled in the art, other drawings and other implementation methods can be obtained based on these drawings without any creative effort.

[0037] To keep the drawings concise, each figure only schematically shows the parts relevant to the utility model, and these do not represent the actual structure of the product. Furthermore, for ease of understanding, in some figures, only one of the components with the same structure or function is schematically depicted, or only one is labeled. In this document, "one" not only means "only one," but can also mean "more than one."

[0038] It should also be further understood that the term “and / or” as used in this application specification and the appended claims means any combination of one or more of the associated listed items and all possible combinations, and includes such combinations.

[0039] In this document, it should be noted that, unless otherwise explicitly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to fixed connections, detachable connections, or integral connections; they can refer to mechanical connections or electrical connections; they can refer to direct connections or indirect connections through an intermediate medium; and they can refer to the internal connection between two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0040] Furthermore, in the description of this application, the terms "first," "second," etc., are used only to distinguish descriptions and should not be construed as indicating or implying relative importance.

[0041] refer to Figures 1 to 6 This application provides a spliced ​​steel tie rod 100 for a flower basket frame. The spliced ​​steel tie rod 100 includes an upper tie rod 10, a lower tie rod 20, and a first fastener (not shown in the figure). The upper tie rod 10 has a first connecting end 11 at its top, which is adapted to be fixed to a building exterior wall 200. The lower tie rod 10 has a first fixing end 12 at its bottom, which has at least one first fixing hole 120. The lower tie rod 20 has a second fixing end 22 at its top, which has a second fixing hole 220. The lower tie rod 20 has a second connecting end 21 at its bottom, which is adapted to be fixed to a suspension beam 300 extending outward from the building exterior wall 200. The first fixed end 12 of the upper pull rod 10 and the second fixed end 22 of the lower pull rod 20 are stacked, and the first fixed hole 120 and the second fixed hole 220 correspond to each other. The first fastener passes through the first fixed hole 120 and the second fixed hole 220 to fix the first fixed end 12 and the second fixed end 22 together.

[0042] In this application, the upper pull rod 10 and the lower pull rod 20 of the spliced ​​steel tie rod 100 of the flower basket frame can be spliced ​​and assembled on the construction site, which facilitates the transportation of the steel tie rod. When multiple first fixing holes 120 and / or second fixing holes 220 are implemented, the overall length of the steel tie rod can be flexibly adjusted by adjusting the correspondence between the first fixing holes 120 and the second fixing holes 220, which can better adapt to the flower basket frame structure with complex shapes and special requirements.

[0043] It is understood that in some embodiments, the number of both the first fixing hole 120 and the second fixing hole 220 is one. In some embodiments, the number of the first fixing holes 120 is multiple and arranged along the axial direction of the upper pull rod 10, and the number of the second fixing holes 220 is also multiple and arranged along the axial direction of the lower pull rod 20. In this case, the overall length of the steel pull rod can be adjusted by adjusting the correspondence between the first fixing holes 120 and the second fixing holes 220. Preferably, the first fastener includes a screw.

[0044] In some embodiments, when the number of the first fixing holes 120 and the second fixing holes 220 is multiple, at least two of the first fixing holes 120 and at least two of the second fixing holes 220 correspond to each other, and the number of the first fasteners is also two. The two first fasteners fix the upper pull rod 10 and the lower pull rod 20 at different positions, which can prevent the upper pull rod 10 and the lower pull rod 20 from rotating relative to each other. It should also be noted that the overlapping arrangement of at least a portion of the first fixing end 12 and at least a portion of the second fixing end 22 can also improve the structural strength in the direction perpendicular to the pull rod axis.

[0045] refer to Figure 1 and Figure 2 Furthermore, the pull-down rod 20 further includes a connecting plate 23, a connecting rod 24, and a first ear plate 25. One end of the connecting rod 24 is connected to the connecting plate 23, and the other end is connected to the first ear plate 25. The end of the first ear plate 25 away from the connecting rod 24 is adapted to be connected to the suspension beam 300. The second fixing hole 220 is formed in the connecting plate 23, and the end of the connecting plate 23 away from the connecting rod 24 is adapted to be connected to the second fixing end 22 of the pull-up rod 10.

[0046] Preferably, the two ends of the connecting rod 24 are connected to the connecting plate 23 and the first ear plate 25 by welding. In some modified embodiments, the connecting plate 23, the connecting rod 24, and the first ear plate 25 can also be integrally formed and connected.

[0047] refer to Figure 1 and Figure 2 Furthermore, a second ear plate 301 is provided at a predetermined position of the suspension beam 300, and the first ear plate 25 is rotatably connected to the second ear plate 301. Specifically, the predetermined position of the first ear plate 25 has a first ear hole 250, and the predetermined position of the second ear plate 301 has a second ear hole 3010. The first ear plate 25 and the second ear plate 301 are stacked, and the first ear hole 250 and the second ear hole 3010 correspond to each other. The spliced ​​steel tie rod of the flower basket frame further includes a second fastener (not shown in the figure), which passes through the first ear hole 250 and the second ear hole 3010 to rotatably connect the first ear plate 25 to the second ear plate 301. In some modified embodiments, the second connecting end 21 of the pull rod 20 can also be connected to the suspension beam 300 by welding.

[0048] Preferably, the connecting plate 23 of the pull-down rod 20 is made of steel plate with a thickness ranging from 10mm to 30mm, preferably 20mm, a width ranging from 50mm to 100mm, preferably 80mm, and a length ranging from 500mm to 1000mm, preferably 800mm. Preferably, the diameter of the second fixing hole 220 is ranging from 15mm to 30mm, preferably 22mm, and the distance between adjacent second fixing holes 220 is ranging from 50mm to 150mm, preferably 100mm. Preferably, the thickness of the first ear plate 25 is ranging from 10mm to 20mm, preferably 15mm. Preferably, the diameter of the connecting rod 24 is ranging from 10mm to 30mm, preferably 20mm. Preferably, both ends of the connecting rod 24 overlap with the connecting plate 23 and the first ear plate 25 when connected, and the overlap length is greater than 5cm, preferably 10cm. Preferably, the diameter of the first fixing hole 120 is ranging from 15mm to 30mm, preferably 22mm. Preferably, the diameter of the first fastener is in the range of 15mm to 30mm, and more preferably 22mm.

[0049] refer to Figure 7 In one embodiment, the upper pull rod 10 has a cylindrical structure and a third ear plate 13 is provided at the first fixed end 12. The first fixing hole 120 is provided at the third ear plate 13 and is connected to the second fixed end 22 of the lower pull rod 10 through the third ear plate 13.

[0050] refer to Figure 5 and Figure 6 In one modified embodiment, the first fixed end 12 of the upper pull rod 10 has a mounting groove 121, and the second fixed end 22 of the lower pull rod 20 is adapted to be installed in the mounting groove 121. In this modified embodiment, the second fixed end 22 can be inserted into the mounting groove 121 of the first fixed end 12, which facilitates the alignment of the upper pull rod 10 and the lower pull rod 20, and facilitates their assembly. On the other hand, at least a portion of the first fixed end 12 is sleeved on the outside of the second fixed end 22, which can improve the structural strength of the connection between the upper pull rod 10 and the lower pull rod 20.

[0051] refer to Figure 5 and Figure 6Furthermore, the first fixed end 12 of the upper pull rod 10 has an insertion groove 122, which extends along the axial direction of the upper pull rod 10 and communicates with the mounting groove 121. The first fixed end 12 also has a locking groove 123, which communicates with both the insertion groove 122 and the mounting groove 121. The second fixed end 22 of the lower pull rod 20 has a locking protrusion 221 extending outward in a direction perpendicular to the axial direction of the lower pull rod 20. During the process of inserting the second fixed end 22 of the pull rod 20 into the mounting groove 121, the locking protrusion 221 is adapted to move within the insertion groove 122. When the second fixed end 22 is inserted into the preset position within the mounting groove 121, the first fixing hole 120 and the second fixing hole 220 are offset from each other. When the pull rod 10 and the pull rod 20 are rotated relative to each other, such that when the locking protrusion 221 moves from the insertion groove 122 into the locking groove 123, at least one of the first fixing holes 120 corresponds to at least one of the second fixing holes 220. In this modified embodiment, during assembly, the locking protrusion 221 of the pull rod 20 is first aligned with the insertion groove 122 of the pull rod 10. During the process of installing the second fixed end 22 into the mounting groove 121, the locking protrusion 221 moves within the insertion groove 122. After the second fixed end 22 is inserted into the mounting groove 121 at a preset depth, the pull rod 10 and the pull rod 20 are rotated relative to each other, so that the locking protrusion 221 moves into the locking groove 123. The engagement between the locking groove 123 and the locking protrusion 221 can limit the pull rod 10 and the pull rod 20 in the axial direction, facilitating the passage of the first fastener through the first fixing hole 120 and the second fixing hole 220.

[0052] refer to Figure 1 , Figure 2 as well as Figure 3 Furthermore, the first connecting end 11 of the upper pull rod 10 is provided with a fixing plate 111, and the fixing plate 111 has a plurality of screw holes 110 at a preset position. The spliced ​​steel pull rod of the flower basket frame further includes a plurality of third fasteners (not shown in the figure), which are adapted to pass through the plurality of screw holes 110 to fix the fixing plate 111 to the building exterior wall 200.

[0053] refer to Figure 4In a modified embodiment, the spliced ​​steel tie rod of the flower basket frame further includes a vertical tie rod 30, one end of which is connected to the lower tie rod 20 or the upper tie rod 10, and the other end is connected to the suspension beam 300. The vertical tie rod 30 further improves the stability of the connection between the upper tie rod 10 or the lower tie rod 20 and the suspension beam 300, thereby further enhancing the structural strength.

[0054] The spliced ​​steel tie rod of the flower basket frame further includes a horizontal tie rod 40, one end of which is connected to the upper tie rod 10 or the lower tie rod 20, and the other end is connected to the building exterior wall 200. The horizontal tie rod 40 further improves the stability of the connection between the upper tie rod 10 or the lower tie rod 20 and the building exterior wall 200, thereby further enhancing the structural strength.

[0055] Preferably, the ends of the vertical tie rod 30 and the horizontal tie rod 40 that connect to the upper tie rod 10 or the lower tie rod 20 each have through holes. When it is necessary to connect the vertical tie rod 30 and the horizontal tie rod 40 to the upper tie rod 10 or the lower tie rod 20, the through holes are aligned with the first fixing hole 120 or the second fixing hole 220, and fixed with bolts. In some modified embodiments, the vertical tie rod 30 and the horizontal tie rod 40 can also be connected to the upper tie rod 10 or the lower tie rod 20 by welding.

[0056] Furthermore, the end of the vertical tie rod 30 near the suspension beam 300 is connected to the suspension beam 300 by welding or by using ear plates and bolts for fastening. The specific connection method should not constitute a limitation of this application. Correspondingly, ear plates are provided at predetermined positions on the building exterior wall 200, and ear plates are also provided at the end of the horizontal tie rod 40 connected to the building exterior wall 200. After aligning the positions of the two ear plates, they are fastened together using bolts.

[0057] According to another aspect of this application, this application further provides an exterior wall scaffolding, comprising: a spliced ​​steel tie rod 100 of the flower basket frame as described in any of the above embodiments, an exterior wall 200, and a suspension beam 300, wherein the first connecting end 11 of the upper tie rod 10 is fixed to the exterior wall 200; the suspension beam 300 extends outward from one side of the exterior wall 200, and the second connecting end 21 of the lower tie rod 20 is adapted to be fixed to the end of the suspension beam 300 away from the exterior wall 200.

[0058] Those skilled in the art should understand that the embodiments of the present invention described above and shown in the accompanying drawings are merely examples and do not limit the present invention. The advantages of the present invention have been fully and effectively realized. The functions and structural principles of the present invention have been shown and explained in the embodiments, and any modifications or variations may be made to the implementation of the present invention without departing from the stated principles.

Claims

1. A spliceable steel pull rod for a flower basket holder, characterized in that, include The upper pull rod has a first connecting end at its top, which is adapted to be fixed to the exterior wall of the building, and a first fixing end at its bottom, which has at least one first fixing hole. A pull rod, the top of which has a second fixed end with a second fixed hole, and the bottom of which has a second connecting end, the second connecting end being adapted to be fixed to a suspension beam extending outward from the building's exterior wall; The first fastener has the first fixed end of the upper pull rod and the second fixed end of the lower pull rod stacked together, and the first fixed hole and the second fixed hole are opposite to each other. The first fastener passes through the first fixed hole and the second fixed hole to fix the first fixed end and the second fixed end together.

2. The spliced steel pull rod for a flower basket holder according to claim 1, characterized by The pull-down rod further includes a connecting plate, a connecting rod, and a first ear plate. One end of the connecting rod is connected to the connecting plate, and the other end is connected to the first ear plate. The end of the first ear plate away from the connecting rod is adapted to be connected to the suspension beam. The second fixing hole is formed in the connecting plate, and the end of the connecting plate away from the connecting rod is adapted to be connected to the second fixing end of the pull-up rod.

3. The spliced steel pull rod for a flower basket holder according to claim 2, characterized by The suspension beam is provided with a second ear plate at a preset position, and the first ear plate is rotatably connected to the second ear plate.

4. The spliced steel pull rod for a flower basket holder according to claim 3, characterized by The first ear plate has a first ear hole at a predetermined position, and the second ear plate has a second ear hole at a predetermined position. The first ear plate and the second ear plate are stacked, and the first ear hole and the second ear hole correspond to each other. The spliced ​​steel tie rod of the flower basket frame further includes a second fastener that passes through the first ear hole and the second ear hole to rotatably connect the first ear plate to the second ear plate.

5. The spliced steel pull rod for a flower basket holder according to claim 1, characterized by The first fixed end of the upper pull rod has a mounting groove, and the second fixed end of the lower pull rod is adapted to be installed in the mounting groove.

6. The spliced steel pull rod for a flower basket holder according to claim 5, characterized by The first fixed end of the upper pull rod has an insertion groove that extends along the axial direction of the upper pull rod and communicates with the mounting groove. The first fixed end also has a locking groove, which is connected to both the insertion groove and the mounting groove; The second fixed end of the pull rod has a locking protrusion that extends outward in a direction perpendicular to the axial direction of the pull rod; During the process of inserting the second fixed end of the pull rod into the mounting groove, the locking protrusion is adapted to move within the insertion groove. When the second fixed end is inserted into the preset position within the mounting groove, the first fixing hole and the second fixing hole are staggered. When the upper pull rod and the lower pull rod are rotated relative to each other, such that when the locking protrusion moves from the insertion groove into the locking groove, at least one of the first fixing holes corresponds to at least one of the second fixing holes.

7. The spliced steel pull rod for a flower basket holder according to claim 6, characterized by The first connecting end of the upper pull rod is provided with a fixing plate, and the fixing plate has a plurality of screw holes at a preset position; The spliced ​​steel tie rod of the flower basket frame further includes a plurality of third fasteners, which are adapted to pass through a plurality of screw holes to fix the fixing plate to the exterior wall of the building.

8. The spliced ​​steel tie rod of the flower basket frame according to claim 7, characterized in that, The spliced ​​steel tie rod of the flower basket frame further includes a vertical tie rod, one end of which is connected to the lower tie rod or the upper tie rod, and the other end is connected to the suspension beam.

9. The spliced ​​steel tie rod of the flower basket frame according to claim 8, characterized in that, The spliced ​​steel tie rod of the flower basket frame further includes a horizontal tie rod, one end of which is connected to the upper tie rod or the lower tie rod, and the other end is connected to the building's exterior wall.

10. An external wall scaffolding system characterised in that, include: The spliced ​​steel tie rod of the flower basket frame according to any one of claims 1 to 9; The first connecting end of the upper tie rod is fixed to the exterior wall of the building; A suspension beam extends outward from one side of the building's exterior wall, and the second connecting end of the pull rod is adapted to be fixed to the end of the suspension beam away from the building's exterior wall.