A manhole connection horizontal pipe alignment device
By using a hand-operated hoist and connecting structure together, the alignment problem when connecting the inspection well and the horizontal pipe was solved, achieving fast and tight pipe alignment, and improving construction efficiency and sealing performance.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- ANHUI DINGJI CONSTR ENG CO LTD
- Filing Date
- 2025-05-09
- Publication Date
- 2026-07-31
AI Technical Summary
In the construction of urban underground drainage systems and municipal pipe networks, the lack of effective auxiliary devices when connecting inspection wells to horizontal pipes leads to inaccurate pipe alignment, affecting sealing and overall performance, and consuming a lot of manpower and time.
By employing a rapid deployment of hand-operated hoists and related connecting structures, and through the combined use of fixing components, traction ropes, and blocking frames, precise alignment of adjacent pipe sections can be achieved.
It enables rapid and tight alignment of pipelines, reduces manpower consumption, and improves construction efficiency and sealing performance.
Smart Images

Figure CN224579909U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of pipeline construction technology, and in particular relates to a device for aligning transverse pipelines connected to inspection wells. Background Technology
[0002] In the construction of urban underground drainage systems, municipal pipe networks, and other infrastructure, the connection between inspection wells and horizontal pipes is a crucial link. The rational and efficient completion of the connection between pipes is of great significance for ensuring the normal operation of the entire pipe network system, improving drainage efficiency, and reducing later maintenance costs.
[0003] In pipeline connection construction, due to the large weight of the pipeline itself and the lack of effective auxiliary devices, construction personnel often need to spend a lot of manpower and time to adjust the position of the pipeline to ensure that the pipeline interface can be accurately aligned. It is difficult to guarantee the horizontal alignment accuracy of the pipeline during the operation, which can easily lead to gaps at the interface, affecting the sealing and overall performance of the pipeline. Therefore, it is necessary to provide a horizontal pipeline alignment device for manhole connection, which uses a method of quickly deploying hand-operated hoists and related connection structures to pull and push adjacent pipe sections, thereby achieving precise and tight alignment. Utility Model Content
[0004] The purpose of this invention is to provide a device for aligning transverse pipes in inspection wells. This device uses a method of quickly deploying hand-operated hoists and related connecting structures to pull and advance adjacent pipe sections, thereby achieving precise and tight alignment and solving the aforementioned technical problems.
[0005] The technical solution of this utility model to solve the above-mentioned technical problems is as follows: A manhole connection horizontal pipe alignment device includes a base located on the front and rear sides of a first pipe section; the two bases are arranged in a mirror image; a hand-operated hoist is fixedly installed on the side of the base away from the first pipe section; a fixing component is provided at the top and bottom between the two bases; a second pipe section is provided on the right side of the first pipe section; a blocking frame is provided on the right side of the second pipe section; two connecting holes are opened at the front and rear ends of the right side of the blocking frame; a traction rope is bolted into the inner cavity of the connecting hole; a hook is fixedly connected to the lifting end of the hand-operated hoist; and the hook is sleeved on the surface of the traction rope.
[0006] Preferably, the fixing assembly includes a fixing seat and a fixing plate respectively fixedly connected to the top and bottom of the base. The inner cavity of the fixing seat is rotatably connected to a chain, and the end of the chain away from the fixing seat is rotatably connected to a threaded post. The inner cavity of the fixing plate is rotatably connected to a threaded sleeve.
[0007] Preferably, the threaded sleeve is threaded onto the surface of the threaded post, the chain is wrapped around the surface of the first pipe section, and a hexagonal threaded sleeve is welded to the surface of the threaded sleeve.
[0008] Preferably, the front and rear sides of the top of the blocking frame are welded with hangers, and the hangers are hung on the right side of the top of the second pipe section.
[0009] Preferably, an anti-slip pad, which is a rubber pad, is bonded to the side of the base near the first pipe section.
[0010] The beneficial effects of this utility model are:
[0011] 1. This utility model uses a fixing component to fix two bases in place. Then, with the cooperation of a hand chain hoist, a traction rope, and a blocking frame, the first pipe section and the second pipe section can be connected. Then, with the cooperation of the hand chain hoist, the traction rope, and the blocking frame, the second pipe section can be pulled in, which can achieve the purpose of easy horizontal alignment and quick and labor-saving disassembly and assembly.
[0012] 2. This utility model, through the setting of the fixing components, wherein the use of the threaded column and the threaded sleeve together plays a role in tightening and fixing the chain, and at the same time, with the use of the base and the chain together, the base and the hand chain hoist can be stably and quickly installed on the surface of the first pipe section.
[0013] 3. The present invention, through the setting of the hanging rod, allows the blocking frame to be pre-hung on the right side of the top of the second pipe section, thereby facilitating the user to connect and wire the traction rope and hook. Attached Figure Description
[0014] in:
[0015] Figure 1 This is a front view schematic diagram of one embodiment of the present utility model;
[0016] Figure 2 This is a three-dimensional schematic diagram of the first pipe section, base, hand chain hoist and fixing components according to one embodiment of the present utility model;
[0017] Figure 3 This is a three-dimensional schematic diagram of the second pipe section and the blocking frame according to an embodiment of the present invention;
[0018] Figure 4 This is an exploded perspective view of the base and fixing components of one embodiment of the present invention.
[0019] The attached diagram lists the components represented by each number as follows:
[0020] 1. First pipe section, 2. Base, 3. Hand chain hoist, 4. Fixing component, 41. Fixing seat, 42. Chain, 43. Threaded column, 44. Fixing plate, 45. Threaded sleeve, 5. Second pipe section, 6. Blocking frame, 7. Hook, 8. Connecting hole, 9. Traction rope, 10. Lifting rod, 11. Anti-slip mat. Detailed Implementation
[0021] In the following description, an embodiment of the present invention for aligning a transverse pipe connecting a manhole will be described with reference to the accompanying drawings.
[0022] Figure 1-4 This invention illustrates an embodiment of a manhole connection horizontal pipe alignment device, comprising bases 2 located on the front and rear sides of a first pipe section 1. The two bases 2 are mirror images of each other. A hand-operated hoist 3 is fixedly installed on the side of each base 2 away from the first pipe section 1. Fixing components 4 are provided at the top and bottom of the two bases 2, each including a fixing seat 41 and a fixing plate 44 respectively fixedly connected to the top and bottom of the bases 2. A chain 42 is rotatably connected to the inner cavity of the fixing seat 41, and a threaded post 43 is rotatably connected to the end of the chain 42 away from the fixing seat 41. A threaded sleeve 45 is rotatably connected to the inner cavity of the fixing plate 44, and the threaded sleeve 45 is threaded onto the surface of the threaded post 43. The chain 42 wraps around the surface of the first pipe section 1, and a hexagonal threaded sleeve is welded to the surface of the threaded sleeve 45. Through the arrangement of the fixing components 4, the threaded post 43 and the threaded sleeve 45 work together to align the chain 42. 2 serves to tighten and fix the base. With the cooperation of the base 2 and the chain 42, the base 2 and the hand chain hoist 3 can be stably and quickly installed on the surface of the first pipe section 1. The second pipe section 5 is set on the right side of the first pipe section 1. The blocking frame 6 is set on the right side of the second pipe section 5. The front and rear sides of the top of the blocking frame 6 are welded with the hanging rod 10. The hanging rod 10 is hung on the right side of the top of the second pipe section 5. The anti-slip pad 11 is glued to the side of the base 2 near the first pipe section 1. The anti-slip pad 11 is a rubber pad. With the setting of the hanging rod 10, the blocking frame 6 can be pre-hung on the right side of the top of the second pipe section 5, so as to facilitate the user to connect and wire the traction rope 9 and the hook 7. The front and rear ends of the right side of the blocking frame 6 are opened with two connecting holes 8. The inner cavity of the connecting hole 8 is bolted with the traction rope 9. The lifting end of the hand chain hoist 3 is fixedly connected with the hook 7, and the hook 7 is sleeved on the surface of the traction rope 9.
[0023] Working Principle: In use, the user hoists the first pipe section 1 and the second pipe section 5 to the designated installation positions. Then, the user places the chain 42 onto the surface of the first pipe section 1, and inserts the threaded post 43 into the inner cavity of the threaded sleeve 45. Using a wrench, the threaded sleeve 45 is rotated. Through the interaction of the threads on the surface of the threaded post 43 and the threads on the inner wall of the threaded sleeve 45, the threaded post 43 enters the inner cavity of the threaded sleeve 45. The pulling action of the threaded post 43 tightens and secures the chain 42, thereby stably installing the two bases 2 on the front and rear sides of the first pipe section 1. Finally, the blocking bracket 6 is attached to the right side of the second pipe section 5. This allows the boom 10 to be hung on the right side of the top of the second pipe section 5, temporarily fixing the blocking frame 6. Then, the user places the hook 7 on the surface of the traction rope 9 and rotates the operating lever of the hand chain hoist 3 to tighten the hook 7, thereby pulling the traction rope 9. Under the linkage of the traction rope 9 and the blocking frame 6, the second pipe section 5 is pulled to the left, allowing the left end of the second pipe section 5 to be pushed into the inner cavity of the first pipe section 1 for alignment. In actual use, the user can change the length of the traction rope 9 to push the subsequently installed pipe section, thus avoiding the user from frequently disassembling and assembling the base 2 and the hand chain hoist 3.
[0024] In summary: This inspection well is connected to a horizontal pipe alignment device. The two bases 2 are fixedly installed by the fixing component 4. Then, with the cooperation of the hand chain hoist 3, the traction rope 9 and the blocking frame 6, the first pipe section 1 and the second pipe section 5 can be connected. Then, with the cooperation of the hand chain hoist 3, the traction rope 9 and the blocking frame 6, the second pipe section 5 can be pulled in, thus achieving the purpose of easy horizontal alignment and quick and labor-saving disassembly and assembly.
Claims
1. A device for aligning transverse pipes connecting inspection wells, characterized in that, The system includes bases (2) located on the front and rear sides of the first pipe section (1): the two bases (2) are arranged in a mirror image. A hand chain hoist (3) is fixedly installed on the side of the base (2) away from the first pipe section (1). Fixing components (4) are provided at the top and bottom between the two bases (2). A second pipe section (5) is provided on the right side of the first pipe section (1). A blocking frame (6) is provided on the right side of the second pipe section (5). Two connecting holes (8) are opened at the front and rear ends of the right side of the blocking frame (6). A traction rope (9) is plugged into the inner cavity of the connecting hole (8). A hook (7) is fixedly connected to the lifting end of the hand chain hoist (3). The hook (7) is sleeved on the surface of the traction rope (9).
2. The alignment device for connecting transverse pipes to a manhole according to claim 1, characterized in that, The fixing component (4) includes a fixing seat (41) and a fixing plate (44) fixedly connected to the top and bottom of the base (2) respectively. The inner cavity of the fixing seat (41) is rotatably connected to a chain (42), and the end of the chain (42) away from the fixing seat (41) is rotatably connected to a threaded column (43). The inner cavity of the fixing plate (44) is rotatably connected to a threaded sleeve (45).
3. The alignment device for connecting transverse pipes to a manhole according to claim 2, characterized in that, The threaded sleeve (45) is threaded onto the surface of the threaded post (43), the chain (42) is wrapped around the surface of the first pipe section (1), and the surface of the threaded sleeve (45) is welded with a hexagonal threaded sleeve.
4. The alignment device for connecting transverse pipes to a manhole according to claim 3, characterized in that, The front and rear sides of the top of the blocking frame (6) are welded with hanging rods (10), and the hanging rods (10) are hung on the right side of the top of the second pipe section (5).
5. The alignment device for connecting transverse pipes to a manhole according to claim 4, characterized in that, The base (2) has an anti-slip pad (11) bonded to the side near the first pipe section (1), and the anti-slip pad (11) is a rubber pad.