High-pressure water heating PTC heater assembly
By installing a filter assembly and a lifting mechanism at the front end of the water inlet pipe, the problems of impurities entering the water tank and inconvenient maintenance in high-pressure water heating PTC heaters are solved. This achieves impurity filtration and convenient disassembly of the heater, extending its service life and improving maintenance efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- JIANGSU HUAZHI NEW ENERGY TECHNOLOGY CO LTD
- Filing Date
- 2025-07-15
- Publication Date
- 2026-08-04
AI Technical Summary
Existing high-pressure water heating PTC heaters suffer from the problem of impurities entering the water tank, leading to high maintenance frequency and inconvenience.
A filter assembly is installed at the front end of the water inlet pipe to filter impurities, and the heater body is easily disassembled through a lifting mechanism.
It effectively filters out impurities in the heating water, reduces maintenance frequency, extends service life, and simplifies the maintenance process of the heater body.
Smart Images

Figure CN224593424U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of PTC heater technology for water heating, specifically a high-pressure PTC heater assembly for water heating. Background Technology
[0002] CN222527965U discloses a brazed high-pressure water heating PTC heater assembly, relating to the field of water heating PTC heater technology. It includes a housing with a fixed cover on top, and a water heating heater body inside the housing. The water heating heater body includes a first water tank, a second water tank directly above the first water tank, and a third water tank directly below the first water tank. A first connecting pipe is fixedly installed at the top of the first water tank, with its top end fixedly connected to the second water tank. A second connecting pipe is fixedly installed at the bottom of the first water tank, with its bottom end fixedly connected to the third water tank. A first heating element is located between the first and second water tanks, and a second heating element is located between the first and third water tanks. This application can achieve rapid heating of the entire vehicle. In use, water is divided into three layers from a single flow channel, effectively reducing the resistance of the water flow and making the heat exchange rate faster, thus improving the heating speed of the water.
[0003] However, the PTC heater assembly in this patent still has some shortcomings:
[0004] 1. In this patent, the water to be heated enters each water tank directly through pipes. If there are impurities in the water, the impurities will enter each water tank together, which will result in a higher maintenance frequency for the pipes and water tanks, thus affecting the service life of the heater.
[0005] 2. In this patent, although the fixing cover on the top of the outer casing can be removed separately, the heater assembly cannot be taken out of the outer casing as a whole, which makes the maintenance of the heater assembly very inconvenient. Utility Model Content
[0006] In order to solve the above problems, the purpose of this utility model is to provide a high-pressure water heating PTC heater assembly.
[0007] To solve the above technical problems, the present invention adopts the following technical solution: a high-pressure water heating PTC heater assembly, comprising a shell, a fixed cover, a first pressure plate, a second pressure plate, and a heater body. The fixed cover is movably disposed at the opening end of the shell, the first pressure plate is fixedly disposed on the lower surface of the fixed cover, the second pressure plate is fixedly disposed on the bottom wall of the shell, and the heater body is movably disposed between the first pressure plate and the second pressure plate. The heater body includes an inlet pipe and an outlet pipe, which are disposed on one side of the shell. A lifting mechanism is provided between the shell and the fixed cover.
[0008] The lifting mechanism includes an L-shaped fixed frame, which is fixedly mounted on one side of the housing. A lifting frame is slidably mounted on the L-shaped fixed frame. One end of the lifting frame is detachably mounted on the fixed cover. A lead screw is rotatably mounted on the L-shaped fixed frame, and one end of the lead screw is threadedly connected to the other end of the lifting frame.
[0009] One end of the lower surface of the fixed cover is fixedly provided with a first insert plate and a second insert plate. One side of the outer shell is provided with a first slot and a second slot. The inner walls of the first insert plate and the first slot are movably connected. The outer wall of the water inlet pipe is movably contacted with one end of the first slot. The inner wall of the second insert plate and the second slot are movably connected. The outer wall of the water outlet pipe is movably contacted with one end of the second slot.
[0010] Preferably, a plug groove is provided on one side of the fixed cover, one end of the lifting frame is movably plugged into the inner wall of the plug groove, a plurality of fixing bolts are rotatably installed on the upper surface of the fixed cover, a plurality of No. 1 threaded holes are provided on one end of the lifting frame, and one end of the fixing bolts is rotatably connected to the inner wall of the No. 1 threaded hole.
[0011] Preferably, a hexagonal seat is fixedly provided at the other end of the lead screw.
[0012] Preferably, a guide rod is fixedly installed on the L-shaped fixing frame, and a sliding sleeve is slidably installed on the guide rod. The other end of the lifting frame is fixedly connected to the sliding sleeve.
[0013] Preferably, a No. 3 insert plate is fixedly provided at the other end of the lower surface of the fixed cover, and a No. 3 slot is provided on the other side of the outer shell. The No. 3 insert plate and the inner wall of the No. 3 slot are movably connected, and the length of the No. 3 insert plate is less than the depth of the No. 3 slot.
[0014] Preferably, a sealing gasket is fixedly provided on the lower surface of the fixed cover, and the lower surface of the sealing gasket is in movable contact with the opening end of the outer shell.
[0015] Preferably, a filter assembly is provided at one end of the water inlet pipe. The filter assembly includes a water inlet sleeve. One end of the water inlet sleeve is detachably installed on the water inlet pipe. A filter screen is fixedly provided on the inner wall of the water inlet sleeve. A sealing ring is fixedly provided at one end of the water inlet sleeve. The inner wall of the sealing ring is in movable contact with the outer wall of the water inlet pipe.
[0016] Preferably, one end of the water inlet sleeve is fixedly provided with several fixing ears, and a locking screw is rotatably installed on the fixing ears. The outer wall of the water inlet pipe is provided with several No. 2 threaded holes, and one end of the locking screw is rotatably connected to the inner wall of the No. 2 threaded hole.
[0017] Compared with the prior art, the beneficial effects of this utility model are as follows:
[0018] 1. In this utility model, by setting a filter assembly at the front end of the water inlet pipe, the filter screen in the filter assembly filters the incoming heating water, filters out impurities in the heating water, and prevents impurities from entering the first water tank, the second water tank and the third water tank through the water inlet pipe, thereby reducing the maintenance frequency of the heater body and increasing the service life of the heater body.
[0019] 2. In this utility model, the lifting mechanism is set up so that the lifting frame is driven to rise vertically by the screw in the lifting mechanism. The lifting frame makes the fixed cover, the first insertion plate and the second insertion plate rise vertically, so that the fixed cover, the first insertion plate and the second insertion plate are separated from the outer shell. The heater body can be taken out from the outer shell, thus realizing the disassembly of the heater body and effectively improving the convenience of heater body maintenance. Attached Figure Description
[0020] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0021] Figure 1 This is a schematic diagram of the overall structure of a high-pressure water heating PTC heater assembly according to this utility model.
[0022] Figure 2 This is another overall structural schematic diagram of a high-pressure water heating PTC heater assembly according to the present invention.
[0023] Figure 3 This is a schematic diagram of the internal structure of the outer shell and the main body of the heater of this utility model.
[0024] Figure 4 This is a schematic diagram of the separation structure of the fixed cover and the outer shell of this utility model.
[0025] Figure 5 This is a schematic diagram of the connection structure between the lifting mechanism and the fixed cover of this utility model.
[0026] Figure 6 This utility model Figure 5 Enlarged schematic diagram of part A in the diagram.
[0027] Figure 7 This is a schematic diagram of the separation structure of the lifting frame and the fixed cover of this utility model.
[0028] Figure 8 This is a schematic diagram of the separation structure of the filter component and the water inlet pipe of this utility model.
[0029] In the diagram: 1. Outer shell; 11. Fixing cover; 12. First pressure plate; 13. Second pressure plate; 2. Heater body; 21. Cover plate; 22. First water tank; 23. Second water tank; 24. Third water tank; 25. First heating element; 26. Second heating element; 27. Inlet pipe; 28. Outlet pipe; 3. Lifting mechanism; 31. L-shaped fixing frame; 32. Lifting frame; 33. Insertion slot; 34. Fixing bolt; 35. 1. Threaded hole No. 1; 36. Lead screw; 37. Hexagonal seat; 38. Guide rod; 39. Sliding sleeve; 4. Insert plate No. 1; 41. Insert plate No. 2; 42. Insert plate No. 3; 43. Sealing gasket; 51. Slot No. 1; 52. Slot No. 2; 53. Slot No. 3; 6. Filter assembly; 61. Inlet sleeve; 62. Filter screen; 63. Sealing ring; 64. Fixing ear; 65. Locking screw; 66. Threaded hole No. 2. Detailed Implementation
[0030] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0031] Example: Figure 1-8 As shown, this utility model provides a high-pressure water heating PTC heater assembly, including a housing 1, a fixing cover 11, a first pressure plate 12, a second pressure plate 13, and a heater body 2. The fixing cover 11 is movably disposed at the open end of the housing 1. The first pressure plate 12 is fixedly disposed on the lower surface of the fixing cover 11. The second pressure plate 13 is fixedly disposed on the bottom wall of the housing 1. The heater body 2 is movably disposed between the first pressure plate 12 and the second pressure plate 13. The heater body 2 includes a cover plate 21, a first water tank 22, a second water tank 23, a third water tank 24, a first heating element 25, a second heating element 26, an inlet pipe 27, and an outlet pipe 28. The first water tank 22, the second water tank 23, the third water tank 24, the first heating element 25, and the second heating element 26 are fixedly installed inside the cover plate 21. The first water tank 22 is connected to the inner cavity of the second water tank 23 and the third water tank 24 through pipes. The inlet pipe 27 and the outlet pipe 28 are connected to the inner cavity of the first water tank 22. The inlet pipe 27 and the outlet pipe 28 are located on one side of the outer shell 1. A lifting mechanism 3 is provided between the outer shell 1 and the fixed cover 11. By providing the lifting mechanism 3, the fixed cover 11 can be raised vertically, thereby separating the fixed cover 11 from the outer shell 1, so that the heater body 2 can be disassembled as a whole.
[0032] The lifting mechanism 3 includes an L-shaped fixing frame 31, which is fixedly mounted on one side of the outer casing 1. A lifting frame 32 is slidably mounted on the L-shaped fixing frame 31. One end of the lifting frame 32 is detachably mounted on the fixing cover 11. By driving the lifting frame 32 to rise and fall vertically, the lifting frame 32 can synchronously raise and lower the fixing cover 11, thereby allowing the fixing cover 11 to separate from or fit against the outer casing 1. A insertion groove 33 is provided on one side of the fixing cover 11. One end of the lifting frame 32 is movably inserted into the inner wall of the insertion groove 33. Several fixing bolts 34 are threadedly mounted on the upper surface of the fixing cover 11. Several threaded holes 35 are provided on one end of the lifting frame 32. One end of the fixing bolt 34 is threadedly connected to the inner wall of the threaded hole 35. By rotating the fixing bolt 34, the fixing bolt 34 can be moved to the inner wall of the outer casing 1. 4. Separating from the first threaded hole 35 allows the fixed cover 11 to separate from the lifting frame 32. A lead screw 36 is rotatably mounted on the L-shaped fixed frame 31. One end of the lead screw 36 is threadedly connected to the other end of the lifting frame 32. A hexagonal seat 37 is fixedly mounted on the other end of the lead screw 36. By manually rotating the hexagonal seat 37 (or by using a power tool), the hexagonal seat 37 can rotate the lead screw 36, which can drive the lifting frame 32 to rise and fall vertically. A guide rod 38 is fixedly mounted on the L-shaped fixed frame 31. A sliding sleeve 39 is slidably mounted on the guide rod 38. The other end of the lifting frame 32 is fixedly connected to the sliding sleeve 39. By setting the guide rod 38 and the sliding sleeve 39, the sliding sleeve 39 can slide vertically on the guide rod 38, thereby enabling the lifting frame 32 to maintain vertical rise and fall.
[0033] One end of the lower surface of the fixed cover 11 is fixedly provided with a first insert plate 4 and a second insert plate 41. One side of the outer shell 1 is provided with a first slot 51 and a second slot 52. The inner walls of the first insert plate 4 and the first slot 51 are movably connected. The outer wall of the water inlet pipe 27 is in movable contact with one end of the first slot 51. The inner walls of the second insert plate 41 and the second slot 52 are movably connected. The outer wall of the water outlet pipe 28 is in movable contact with one end of the second slot 52. When the fixed cover 11 rises vertically, the first insert plate 4 and the second insert plate 41 rise synchronously and separate from the first slot 51 and the second slot 52. When the heater body 2 is subsequently removed, the water inlet pipe 27 and the water outlet pipe 28 can be separated from the outer shell 1.
[0034] A third insert plate 42 is fixedly installed at the other end of the lower surface of the fixed cover 11, and a third slot 53 is provided on the other side of the outer shell 1. The inner walls of the third insert plate 42 and the third slot 53 are movably connected. The length of the third insert plate 42 is less than the depth of the third slot 53. By setting the third insert plate 42 and the third slot 53, when the fixed cover 11 rises vertically, the third insert plate 42 rises synchronously and disengages from the third slot 53. The setting of the third slot 53 allows for the power supply and signal line routing of the heater body 2.
[0035] A sealing gasket 43 is fixedly provided on the lower surface of the fixed cover 11. The lower surface of the sealing gasket 43 is in contact with the opening end of the outer shell 1. By providing the sealing gasket 43, the fixed cover 11 can be stably attached to the opening end of the outer shell 1.
[0036] A filter assembly 6 is provided at one end of the water inlet pipe 27. The filter assembly 6 includes a water inlet sleeve 61, one end of which is detachably installed on the water inlet pipe 27. A filter screen 62 is fixedly installed on the inner wall of the water inlet sleeve 61. By setting the water inlet sleeve 61 and the filter screen 62, heating water enters the water inlet pipe 27 through the water inlet sleeve 61 and the filter screen 62. The filter screen 62 can filter the heating water, filter out impurities in the water, and prevent impurities from entering the first water tank 22, the second water tank 23 and the third water tank 24, thereby reducing the maintenance frequency of the heater body 2 and increasing the service life of the heater body 2. A sealing ring 63 is fixedly installed at one end of the water inlet sleeve 61. The inner wall of the sealing ring 63 is in contact with the outer wall of the water inlet pipe 27. By setting the sealing ring 63, the sealing between the water inlet sleeve 61 and the water inlet pipe 27 can be improved, preventing the heating water from overflowing.
[0037] A number of fixing ears 64 are fixedly provided at one end of the water inlet sleeve 61. A locking screw 65 is rotatably installed on the fixing ears 64. A number of No. 2 threaded holes 66 are provided on the outer wall of the water inlet pipe 27. One end of the locking screw 65 is rotatably connected to the inner wall of the No. 2 threaded hole 66. By rotating the locking screw 65 into the No. 2 threaded hole 66, the water inlet sleeve 61 can be fixed on the water inlet pipe 27. At the same time, by rotating the locking screw 65 in the opposite direction, the water inlet sleeve 61 on the water inlet pipe 27 can be removed.
[0038] Working principle: Before the heater body 2 heats up, the operator first puts one end of the water inlet sleeve 61 onto the end of the water inlet pipe 27, and then rotates multiple locking screws 65 respectively, so that the threads of the ends of the multiple locking screws 65 enter the corresponding No. 2 threaded holes 66. At this time, the water inlet sleeve 61 and the filter screen 62 are fixed at the front end of the water inlet pipe 27.
[0039] When external heating water flows in through the inlet sleeve 61, the filter screen 62 filters the heating water, removing impurities and preventing them from entering the first water tank 22, the second water tank 23 and the third water tank 24 through the inlet pipe 27, thereby reducing the maintenance frequency of the heater body 2 and increasing its service life.
[0040] When maintenance is required on the heater body 2, the operator manually (or with a power tool) rotates the hexagonal base 37, which causes the lead screw 36 to rotate. The lead screw 36 drives the lifting frame 32 to rise vertically, which in turn causes the fixed cover 11 to rise vertically. The fixed cover 11 causes the first insertion plate 4 and the second insertion plate 41 to rise synchronously. Then, the heater body 2 can be removed from the outer casing 1, thus facilitating the disassembly of the heater body 2 and effectively improving the convenience of maintenance operations.
[0041] All standard parts used in this invention can be purchased from the market, and irregular parts can be customized according to the description and drawings. The specific connection methods of each part adopt conventional methods such as bolts, rivets, and welding that are mature in the prior art. The machinery, parts and equipment adopt conventional models in the prior art, and the circuit connection adopts conventional connection methods in the prior art, which will not be described in detail here.
[0042] Obviously, those skilled in the art can make various modifications and variations to this utility model without departing from its spirit and scope. Therefore, if these modifications and variations fall within the scope of the claims of this utility model and their equivalents, this utility model also intends to include these modifications and variations.
Claims
1. A high-pressure water heating PTC heater assembly, comprising a housing (1), a fixing cover (11), a first pressure plate (12), a second pressure plate (13), and a heater body (2), wherein the fixing cover (11) is movably disposed at the opening end of the housing (1), the first pressure plate (12) is fixedly disposed on the lower surface of the fixing cover (11), the second pressure plate (13) is fixedly disposed on the bottom wall of the housing (1), and the heater body (2) is movably disposed between the first pressure plate (12) and the second pressure plate (13), characterized in that: The heater body (2) includes an inlet pipe (27) and an outlet pipe (28). The inlet pipe (27) and the outlet pipe (28) are located on one side of the outer shell (1). A lifting mechanism (3) is provided between the outer shell (1) and the fixed cover (11). The lifting mechanism (3) includes an L-shaped fixing frame (31), which is fixedly installed on one side of the outer shell (1). A lifting frame (32) is slidably installed on the L-shaped fixing frame (31). One end of the lifting frame (32) is detachably installed on the fixing cover (11). A lead screw (36) is rotatably installed on the L-shaped fixing frame (31). One end of the lead screw (36) is threadedly connected to the other end of the lifting frame (32). One end of the lower surface of the fixed cover (11) is fixedly provided with a first insert plate (4) and a second insert plate (41). One side of the outer shell (1) is provided with a first slot (51) and a second slot (52). The inner walls of the first insert plate (4) and the first slot (51) are movably connected. The outer wall of the water inlet pipe (27) is in movable contact with one end of the first slot (51). The inner walls of the second insert plate (41) and the second slot (52) are movably connected. The outer wall of the water outlet pipe (28) is in movable contact with one end of the second slot (52).
2. A high pressure water heating PTC heater assembly as claimed in claim 1, wherein, The fixed cover (11) is provided with a plug groove (33) on one side. One end of the lifting frame (32) is movably plugged into the inner wall of the plug groove (33). Several fixing bolts (34) are threadedly installed on the upper surface of the fixed cover (11). Several first threaded holes (35) are provided on one end of the lifting frame (32). One end of the fixing bolt (34) is threadedly rotatably connected to the inner wall of the first threaded hole (35).
3. A high pressure water heating PTC heater assembly as claimed in claim 1, wherein, The other end of the lead screw (36) is fixedly provided with a hexagonal seat (37).
4. A high pressure water heating PTC heater assembly as claimed in claim 1, wherein, A guide rod (38) is fixedly installed on the L-shaped fixed frame (31), and a sliding sleeve (39) is slidably installed on the guide rod (38). The other end of the lifting frame (32) is fixedly connected to the sliding sleeve (39).
5. A high pressure water heating PTC heater assembly as claimed in claim 1, wherein, A third insert plate (42) is fixedly installed at the other end of the lower surface of the fixed cover (11), and a third slot (53) is provided on the other side of the outer shell (1). The inner walls of the third insert plate (42) and the third slot (53) are movably connected. The length of the third insert plate (42) is less than the depth of the third slot (53).
6. A high pressure water heating PTC heater assembly as claimed in claim 1, wherein, A sealing gasket (43) is fixedly provided on the lower surface of the fixed cover (11), and the lower surface of the sealing gasket (43) is in contact with the opening end of the outer shell (1).
7. A high pressure water heating PTC heater assembly as claimed in claim 1, wherein, A filter assembly (6) is provided at one end of the water inlet pipe (27). The filter assembly (6) includes a water inlet sleeve (61). One end of the water inlet sleeve (61) is detachably installed on the water inlet pipe (27). A filter screen (62) is fixedly provided on the inner wall of the water inlet sleeve (61). A sealing ring (63) is fixedly provided on one end of the water inlet sleeve (61). The inner wall of the sealing ring (63) is in contact with the outer wall of the water inlet pipe (27).
8. A high pressure water heating PTC heater assembly as claimed in claim 7, wherein, One end of the water inlet sleeve (61) is fixedly provided with a plurality of fixing ears (64), the fixing ears (64) are threadedly rotatably provided with locking screws (65), outer walls of the water inlet pipes (27) are provided with a plurality of second threaded holes (66), and one ends of the locking screws (65) are threadedly rotatably connected with inner walls of the second threaded holes (66).