Pre-cast concrete wall panel storage and transport integrated device
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- CHINA MCC22 GROUP CORP LTD
- Filing Date
- 2025-08-29
- Publication Date
- 2026-08-07
AI Technical Summary
预制混凝土墙板的存放一般采用一体式靠放架,运输一般采用单体斜靠放架,一体式靠放架灵活性较差,墙板在存放过程中容易出现磕碰导致表观缺陷,增加后期维修成本,且容易出现墙板歪斜或者倒塌情况,危害作业人员安全;墙板运输采用的单体斜靠放架则存在运输数量少,运输过程中容易出现安全隐患等缺点
[0003] In order to solve the problems existing in the prior art, the present invention provides an integrated device for storing and transporting precast concrete wall panels.
Smart Images

Figure CN224603679U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of precast concrete wall panels, and in particular to an integrated device for storing and transporting precast concrete wall panels. Background Technology
[0002] Precast concrete wall panels are manufactured in factories, and are used for building partition walls that are lightweight, have thermal insulation, and sound insulation properties. Storage of precast concrete wall panels typically uses integrated support frames, while transportation usually uses individual inclined support frames. Integrated support frames have poor flexibility, making the panels susceptible to damage during storage, leading to surface defects, increased maintenance costs, and a risk of panel tilting or collapse, endangering worker safety. Individual inclined support frames used for transportation have drawbacks, including limited transport capacity and potential safety hazards during transport. Therefore, there is an urgent need to develop an integrated storage and transportation device for precast concrete wall panels. Utility Model Content
[0003] In order to solve the problems existing in the prior art, the present invention provides an integrated device for storing and transporting precast concrete wall panels.
[0004] The present invention provides an integrated device for storing and transporting precast concrete wall panels, which adopts the following technical solution: An integrated device for storing and transporting precast concrete wall panels includes a rectangular fixed bracket. Two horizontally parallel tracks are installed on the top of the fixed bracket, with the length direction of the tracks being the same as that of the fixed bracket. Several sliding rods are slidably installed between the two tracks, and the sliding rods are detachably fixed to the tracks. The bottom of the fixed bracket is provided with anti-collision pads for vertical flexible support of the wall panels. Top supports for lateral flexible support of the wall panels are installed on the sliding rods or the fixed bracket.
[0005] By adopting the above technical solution, the integrated storage and transportation device for precast concrete wall panels of this utility model can store multiple precast concrete wall panels at the same time. By setting up top supports and anti-collision pads, it can effectively prevent the precast concrete wall panels from collapsing or being bumped during storage. The distance between two adjacent sliding rods can be adjusted to accommodate wall panels of different thicknesses. The device has high flexibility and can be placed on a semi-trailer for the transportation of precast concrete wall panels, ensuring the safety of the wall panels during transportation. It can also be neatly placed on an open ground for the storage of precast concrete wall panels.
[0006] Preferably, the fixed bracket includes a bottom crossbar, a vertical bar, a top crossbar, and a fixed bar that are assembled and fixed. The fixed bar is parallel to the sliding bar and is located outside the sliding bar. The track is fixed on the top crossbar, and a top support is installed on the fixed bar.
[0007] By adopting the above technical solution, the fixed bracket structure is reasonably designed and can effectively fix and install the track.
[0008] Preferably, the top crossbar has a long strip-shaped sliding hole along its length, and a fastening screw passes through the sliding hole, which is threaded to the end of the sliding bar.
[0009] By adopting the above technical solution, and using fastening screws in conjunction with the sliding rod, the sliding rod can be effectively fixed after it has moved into place.
[0010] Preferably, the top support includes a top support screw that passes through and is installed on the sliding rod or the fixed rod, and a top support pad is fixedly connected to the end of the top support screw.
[0011] By adopting the above technical solution, the position of the top support pad can be adjusted by turning the top support screw, so that the top support pad contacts and supports the wall panel. The top support component has a simple structure and is easy to operate.
[0012] Preferably, the left and right sides of the sliding rod are respectively provided with receiving grooves for accommodating the top support screw cap and the top support pad.
[0013] By adopting the above technical solution, the receiving trough protects the top support components during the hoisting of the wall panel.
[0014] Preferably, a number of pairs of top supports are evenly arranged on the sliding rod, and the two top support pads in each pair of top supports are located on different sides of the sliding rod.
[0015] By adopting the above technical solution, the two top support pads in each pair are located on different sides, which makes it convenient to operate the corresponding top support according to the position of the wall panel and to perform lateral positioning of the wall panel on that side.
[0016] Preferably, multiple anti-collision pads are evenly arranged along the width direction of the fixed bracket, and the length direction of the anti-collision pads is the same as the length direction of the fixed bracket.
[0017] By adopting the above technical solution, the anti-collision pads are evenly distributed, the force is uniform, and the coverage of the bottom of the wall panel is wide, effectively providing vertical flexible support for the wall panel. Attached Figure Description
[0018] Figure 1 This is a schematic diagram of the integrated storage and transportation device for precast concrete wall panels according to an embodiment of this utility model.
[0019] Figure 2 It is a sectional view made to show the relationship between the sliding rod, slide rail, top crossbar and fastening screw.
[0020] Figure 3 This is a sectional view created to show the structural components of the top support.
[0021] Explanation of reference numerals in the attached drawings: 1. Fixed bracket; 10. Bottom crossbar; 11. Upright pole; 12. Top crossbar; 13. Fixed rod; 2. Track; 3. Sliding rod; 30. Receiving groove; 4. Fastening screw; 5. Top support; 50. Top support screw; 51. Top support pad; 6. Anti-collision pad. Detailed Implementation
[0022] The following combination Figures 1-3 The present invention will be described in further detail below.
[0023] This utility model discloses an integrated device for storing and transporting precast concrete wall panels. (Refer to...) Figures 1-3 The integrated storage and transportation device for precast concrete wall panels includes a rectangular fixed support 1. The fixed support 1 includes a bottom horizontal bar 10 that is rectangularly spliced and supported on the ground. A vertical pole 11 is fixedly connected to the top of the intersection of the bottom horizontal bars 10. A top horizontal bar 12 is fixedly connected to the top of the two vertical poles 11 arranged along the length of the fixed support 1. A fixing rod 13 is fixedly connected to the top of the two vertical poles 11 arranged along the width of the fixed support 1.
[0024] Two top crossbars 12 are each fixedly connected to a track 2 along their length. Multiple sliding rods 3 are slidably installed between the two tracks 2. The sliding rods 3 are perpendicular to the top crossbars 12 and can move along the length of the track 2. The top crossbars 12 have elongated sliding holes along their length, and fastening screws 4 pass through the sliding holes. The fastening screws 4 are threaded to the ends of the sliding rods 3. When the sliding rods 3 move to the designated position, the sliding rods 3 can be fixed by tightening the fastening screws 4, so that the stability of the sliding rods 3 meets the usage requirements.
[0025] A top support 5 for abutting and supporting the wall panel is installed on the fixed rod 13 or the sliding rod 3. The top support 5 includes a top support screw 50 threaded to the fixed rod 13 or the sliding rod 3. A top support pad 51 is fixed to the end of the top support screw 50. The top support pad 51 can be a rubber pad. The top support pad 51 is used to contact and support the wall panel. A receiving groove 30 is provided on one side of the fixed rod 13 or on both sides of the sliding rod 3 to accommodate the top support screw 50 and the top support pad 51, so as to protect the top support 5. In other embodiments, the receiving groove 30 may not be provided according to the usage requirements, which is not limited here.
[0026] The overall length of the top support 5 is less than or equal to the width of the sliding rod 3. Two pairs of top support 5 are evenly installed on the sliding rod 3, with the two top support 5 in each pair arranged symmetrically at the center, that is, the two top support pads 51 are located on different sides of the sliding rod 3, so that the wall panel can be stored and supported on both the left and right sides of the sliding rod 3; two top support 5 can be evenly installed on the fixed rod 13, with the top support pad 51 of the top support 5 facing the wall panel. Three anti-collision pads 6 are evenly installed along the width direction at the bottom of the fixed bracket 1. The anti-collision pads 6 can be rubber pads, used for flexible support of the wall panel, and the extension direction of the anti-collision pads 6 is the same as the extension direction of the top crossbar 12.
[0027] The implementation principle of the integrated storage and transportation device for precast concrete wall panels in this embodiment of the utility model is as follows: the construction personnel hoist the precast concrete wall panel between the fixed rod 13 and the sliding rod 3 or between the two sliding rods 3, then adjust the position of the sliding rod 3 so that the sliding rod 3 is close to the wall panel but not in contact with the wall panel, and then fix the sliding rod 3 by tightening the fastening screw 4; tighten the top support screw 50 so that the top support pad 51 abuts against and supports the wall panel, completing the lateral fixation of the precast concrete, and the bottom of the wall panel is supported on the anti-collision pad 6, which protects the bottom of the wall panel. Finally, the crane wire rope is removed, and the wall panel is stored.
[0028] The integrated storage and transportation device for precast concrete wall panels of this utility model embodiment can store multiple precast concrete wall panels simultaneously. By setting top support pads 51 and anti-collision pads 6, the collapse and collision of precast concrete wall panels during storage can be effectively prevented. The distance between the fixed rod 13 and the sliding rod 3, and between two adjacent sliding rods 3, can be adjusted to accommodate wall panels of different thicknesses. The two top support pads 51 in each pair of top support members 5 act on the wall panels on different sides, and can be selected according to actual needs. The device has high flexibility and can be placed on a semi-trailer for the transportation of precast concrete wall panels to ensure the safety of the wall panels during transportation. It can also be neatly placed on an open ground for the storage of precast concrete wall panels.
[0029] The above are all preferred embodiments of this utility model, and are not intended to limit the scope of protection of this utility model. Therefore, all equivalent changes made to the structure, shape and principle of this utility model should be covered within the scope of protection of this utility model.
Claims
1. An integrated device for storing and transporting precast concrete wall panels, characterized in that: It includes a rectangular fixed bracket (1), with two horizontally parallel tracks (2) installed on the top of the fixed bracket (1). The length direction of the tracks (2) is the same as the length direction of the fixed bracket (1). Several sliding rods (3) are slidably installed between the two tracks (2). The sliding rods (3) are detachably fixed on the tracks (2). The bottom of the fixed bracket (1) is provided with anti-collision pads (6) for vertical flexible support wall panels. The sliding rods (3) or the fixed bracket (1) are provided with top supports (5) for lateral flexible support wall panels.
2. The integrated storage and transportation device for precast concrete wall panels according to claim 1, characterized in that: The fixed bracket (1) includes a bottom crossbar (10), a vertical bar (11), a top crossbar (12), and a fixed rod (13) that are assembled and fixed. The fixed rod (13) is parallel to the sliding rod (3) and is located outside the sliding rod (3). The track (2) is fixed on the top crossbar (12), and a top support (5) is installed on the fixed rod (13).
3. The integrated storage and transportation device for precast concrete wall panels according to claim 2, characterized in that: The top crossbar (12) has a long strip-shaped sliding hole along its length, and a fastening screw (4) is inserted into the sliding hole. The fastening screw (4) is threaded to the end of the sliding rod (3).
4. The integrated storage and transportation device for precast concrete wall panels according to claim 2, characterized in that: The top support (5) includes a top support screw (50) that is installed on the sliding rod (3) or the fixed rod (13), and a top support pad (51) is fixed to the end of the top support screw (50).
5. The integrated storage and transportation device for precast concrete wall panels according to claim 4, characterized in that: The sliding rod (3) has receiving grooves (30) on its left and right sides for accommodating the cap of the top support screw (50) and the top support pad (51).
6. The integrated storage and transportation device for precast concrete wall panels according to claim 4 or 5, characterized in that: Several pairs of top support members (5) are evenly arranged on the sliding rod (3), and the two top support pads (51) in each pair of top support members (5) are located on different sides of the sliding rod (3).
7. The integrated storage and transportation device for precast concrete wall panels according to claim 1, characterized in that: Multiple anti-collision pads (6) are evenly arranged along the width direction of the fixed bracket (1), and the length direction of the anti-collision pads (6) is the same as the length direction of the fixed bracket (1).