A type of medium-water arch clamp
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-18
- Publication Date
- 2026-08-11
AI Technical Summary
虽然,海缆管道解决了海缆之间的碰撞、摩擦、缠绕等问题,但是,海缆管道一体成型,运输不易,海缆装设于海缆管道时极为困难、效率不高、成本高昂
[0012]本申请的有益效果是:本申请提供的该中水拱夹具有结构简单、装配简便的优点,鉴于该中水拱夹设置有第一拱夹单元和第二拱夹单元,第一拱夹单元的第一夹持通道和第二拱夹单元的第二夹持通道合围成海缆夹持通道,安装海缆时,第一拱夹单元的第一夹持通道将海缆的一部分包裹住,第二拱夹单元的第二夹持通道将海缆的另一部分包裹住,第二拱夹单元和第一拱夹单元安装在一起,以此可以很轻松的将海缆固定在该中水拱夹上。相比于现有技术,本申请的该中水拱夹安装和拆卸极其简便,多个中水拱夹可以将预设长度的海缆一段一段包裹起来,工作效率高。
Smart Images

Figure CN224626278U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of wind power equipment, specifically to a medium-water arch clamp. Background Technology
[0002] A floating arch at sea generally refers to a device consisting of a float, skirt, and counterweight, sometimes appearing as an arch or a continuous strip. Submarine cables are mounted within the floating arch, with one end connected to offshore wind power generation equipment and the other end connected to energy storage equipment. However, in existing technologies, submarine cables are frequently affected by wind, ocean currents, and tides, leading to collisions, friction, and entanglement. Prolonged collisions and friction can damage the cables, affecting power generation. Furthermore, repairing submarine cables is extremely difficult, time-consuming, and labor-intensive.
[0003] Later, someone invented the submarine cable conduit, which allows single or multiple submarine cables to be installed inside. Although the submarine cable conduit solved the problems of collision, friction, and entanglement between submarine cables, it is a one-piece molded conduit, making transportation difficult. Installing submarine cables into the conduit is extremely difficult, inefficient, and costly. Summary of the Invention
[0004] The purpose of this utility model is to address the shortcomings of existing technologies by proposing a water-cooled arch clamp.
[0005] To achieve the above objectives, this utility model adopts the following technical solution: a water-cooled arch clamp, comprising: A predetermined number of first arch clamp units, each first arch clamp unit having a first clamping channel, the first arch clamp unit including a first arch clamp cylinder, the first clamping channel being formed by bending the first arch clamp cylinder; A predetermined number of second arch clamp units, each second arch clamp unit having a second clamping channel, the second arch clamp unit including a second arch clamp cylinder, the second clamping channel being formed by bending the second arch clamp cylinder; When the first arch clamp unit and the second arch clamp unit are detachably installed together, the first arch clamp cylinder and the second arch clamp cylinder are connected, and the first clamping channel and the second clamping channel surround to form a submarine cable clamping channel.
[0006] Preferably, the first arch clamping unit has a predetermined number of first bolt through holes on its first arch clamping cylinder, and the first bolt through holes penetrate the first arch clamping cylinder; the second arch clamping unit has a predetermined number of second bolt through holes on its second arch clamping cylinder, and the second bolt through holes penetrate the second arch clamping cylinder; when the first arch clamping cylinder and the second arch clamping cylinder are joined together, bolts are screwed into the first bolt through holes and the second bolt through holes, thereby enabling the first arch clamping unit and the second arch clamping unit to be detachably installed together.
[0007] Preferably, the first arch clamp unit further includes a first docking plate, a second docking plate, a third docking plate, and a fourth docking plate, all of which are fixedly connected to a preset position on the first arch clamp cylinder. The second arch clamp unit further includes a fifth docking plate, a sixth docking plate, a seventh docking plate, and an eighth docking plate, all of which are fixedly connected to a preset position on the second arch clamp cylinder. When the first arch clamp unit and the second arch clamp unit are installed together, the first docking plate docks with the fifth docking plate, and the fourth docking plate docks with the eighth docking plate.
[0008] Preferably, the first mating plate has a first notch, and the fifth mating plate has a second notch. When the first arch clamp unit and the second arch clamp unit are installed together, the first notch and the second notch align with the first elongated through hole. The second mating plate and the sixth mating plate have a preset distance, thereby forming a second elongated through hole between them. The third mating plate and the seventh mating plate have a preset distance, thereby forming a third elongated through hole between them. The fourth mating plate and the eighth mating plate have a preset distance, thereby forming a fourth elongated through hole between them. The first elongated through hole, the second elongated through hole, the third elongated through hole, and the fourth elongated through hole are aligned.
[0009] Preferably, the first mating plate is provided with a first through hole, which penetrates the first mating plate; the second mating plate is provided with a second through hole, which penetrates the second mating plate; the third mating plate is provided with a third through hole, which penetrates the third mating plate; the fourth mating plate is provided with a fourth through hole, which penetrates the fourth mating plate; the first through hole, the second through hole, the third through hole, and the fourth through hole are aligned.
[0010] Preferably, the fifth mating plate is provided with a fifth through hole, which penetrates the fifth mating plate; the sixth mating plate is provided with a sixth through hole, which penetrates the sixth mating plate; the seventh mating plate is provided with a seventh through hole, which penetrates the seventh mating plate; the eighth mating plate is provided with an eighth through hole, which penetrates the eighth mating plate; and the fifth through hole, the sixth through hole, the seventh through hole, and the eighth through hole are aligned.
[0011] Preferably, a predetermined number of pads are provided on the inner wall of the first clamping channel of the first arch clamping unit; the pads are also provided on the inner wall of the second clamping channel of the second arch clamping unit.
[0012] The beneficial effects of this application are as follows: The underwater arch clamp provided by this application has the advantages of simple structure and easy assembly. Given that the underwater arch clamp is provided with a first arch clamp unit and a second arch clamp unit, the first clamping channel of the first arch clamp unit and the second clamping channel of the second arch clamp unit together form a submarine cable clamping channel. When installing the submarine cable, the first clamping channel of the first arch clamp unit wraps around a portion of the submarine cable, and the second clamping channel of the second arch clamp unit wraps around the other portion of the submarine cable. The second arch clamp unit and the first arch clamp unit are installed together, thus easily fixing the submarine cable to the underwater arch clamp. Compared with the prior art, the underwater arch clamp of this application is extremely easy to install and disassemble. Multiple underwater arch clamps can wrap submarine cables of a preset length segment by segment, resulting in high work efficiency. Attached Figure Description
[0013] Figure 1 This is a structural schematic diagram of a water-cooled arch clamp provided by this utility model.
[0014] Figure 2 for Figure 1 A magnified view of a type of water-cooled arch clamp is shown. Detailed Implementation
[0015] The present application will now be described in further detail with reference to the accompanying drawings and specific embodiments. Similar elements in different embodiments are referred to by related similar element reference numerals. In the following embodiments, many details are described to facilitate a better understanding of the present application. However, those skilled in the art will readily recognize that some features may be omitted in different situations, or may be replaced by other elements, materials, or methods. In some cases, certain operations related to the present application are not shown or described in the specification. This is to avoid obscuring the core parts of the present application with excessive description. For those skilled in the art, detailed description of these related operations is not necessary; they can fully understand the related operations based on the description in the specification and general technical knowledge in the art.
[0016] Furthermore, the features, operations, or characteristics described in the specification can be combined in any suitable manner to form various embodiments, and the operational steps involved in each embodiment can also be rearranged or adjusted in a manner that is obvious to those skilled in the art. Therefore, the specification and drawings are only for clearly describing a particular embodiment and do not imply that they represent the necessary components and / or order.
[0017] The serial numbers assigned to components in this document, such as "first" and "second," are used only to distinguish the described objects and have no sequential or technical meaning. The terms "connection" and "linkage" used in this application, unless otherwise specified, include both direct and indirect connections (linkages).
[0018] Please refer to Figure 1-2 This application provides a mid-water arch clamp, which is an important component of a marine floating arch and is detachably assembled to insert submarine cables into the mid-water arch clamp. The mid-water arch clamp includes: A preset number of first arch clamp units 1, each first arch clamp unit 1 having a first clamping channel 10, each first arch clamp unit 1 including a first arch clamping cylinder 11, the first clamping channel 10 being formed by bending the first arch clamping cylinder 11; A preset number of second arch clamp units 2, each second arch clamp unit 2 having a second clamping channel 20, the second arch clamp unit 2 including a second arch clamping cylinder 21, the second clamping channel 20 being formed by bending the second arch clamping cylinder; When the first arch clamp unit 1 and the second arch clamp unit 2 are detachably installed together, the first arch clamp cylinder 11 and the second arch clamp cylinder 21 are connected, and the first clamping channel 10 and the second clamping channel 20 together form the submarine cable clamping channel 3. Thus, before the submarine cable is installed in the mid-water arch clamp, the submarine cable is pre-equipped, and the first arch clamp unit 1 and the second arch clamp unit 2 are not yet installed together. The first arch clamp cylinder 11 of the first arch clamp unit 1 wraps around a portion of the submarine cable. At this time, a portion of the submarine cable is located in the first clamping channel 10 of the first arch clamp cylinder 11. Then, the second arch clamp cylinder 21 of the second arch clamp unit 2 wraps around the other portion of the submarine cable, so that the submarine cable is completely contained in the submarine cable clamping channel 3. Finally, the first arch clamp unit 1 and the second arch clamp unit 2 are installed together.
[0019] Please refer to some embodiments of this application. Figure 1-2The first arch clamping unit 1 has a first arch clamping cylinder 11 with a predetermined number of first bolt through holes 110, which penetrate the first arch clamping cylinder 11; the second arch clamping unit 2 has a second arch clamping cylinder 21 with a predetermined number of second bolt through holes 210, which penetrate the second arch clamping cylinder 21; when the first arch clamping cylinder 11 and the second arch clamping cylinder 21 are joined together, the bolt 4 is screwed into the first bolt through holes 110 and the second bolt through holes 210, thereby enabling the first arch clamping unit 1 and the second arch clamping unit 2 to be detachably installed together.
[0020] Please refer to some embodiments of this application. Figure 1-2 The first arch clamp unit 1 further includes a first docking plate 12, a second docking plate 13, a third docking plate 14, and a fourth docking plate 15, all of which are fixedly connected to a preset position on the first arch clamp cylinder 11. The second arch clamp unit 2 further includes a fifth docking plate 22, a sixth docking plate 23, a seventh docking plate 24, and an eighth docking plate 25, all of which are fixedly connected to a preset position on the second arch clamp cylinder 21. When the first arch clamp unit 1 and the second arch clamp unit 2 are installed together, the first docking plate 12 docks with the fifth docking plate 22, and the fourth docking plate 15 docks with the eighth docking plate 25. In this application, the first mating plate 12, the second mating plate 13, the third mating plate 14, and the fourth mating plate 15 are all fixedly connected to the first arch clamping cylinder 11 by welding, and the fifth mating plate 22, the sixth mating plate 23, the seventh mating plate 24, and the eighth mating plate 25 are also fixedly connected to the second arch clamping cylinder 21 by welding.
[0021] Please refer to some embodiments of this application. Figure 1-2The first docking plate 12 has a first notch 120, and the fifth docking plate 22 has a second notch 220. When the first arch clamp unit 1 and the second arch clamp unit 2 are installed together, the first notch 120 and the second notch 220 align with the first elongated through hole 100. The second docking plate 13 and the sixth docking plate 23 have a preset distance, thereby forming a second elongated through hole 200 between the second docking plate 13 and the sixth docking plate 23. The third docking plate 14 and the seventh docking plate 24 have a preset distance, thereby forming a third elongated through hole 300 between the third docking plate 14 and the seventh docking plate 24. The fourth docking plate 15 and the eighth docking plate 25 have a preset distance, thereby forming a fourth elongated through hole 400 between the fourth docking plate 15 and the eighth docking plate 25. The first elongated through hole 100, the second elongated through hole 200, the third elongated through hole 300, and the fourth elongated through hole 400 are aligned.
[0022] Please refer to some embodiments of this application. Figure 1-2 The first docking plate 12 is provided with a first through hole 121, which passes through the first docking plate 12; the second docking plate 13 is provided with a second through hole 131, which passes through the second docking plate 13; the third docking plate 14 is provided with a third through hole 141, which passes through the third docking plate 14; the fourth docking plate 15 is provided with a fourth through hole 151, which passes through the fourth docking plate 15; the first through hole 121, the second through hole 131, the third through hole 141, and the fourth through hole 151 are aligned.
[0023] Please refer to some embodiments of this application. Figure 1-2 The fifth docking plate 22 is provided with a fifth through hole 221, which penetrates the fifth docking plate 22; the sixth docking plate 23 is provided with a sixth through hole 131, which penetrates the sixth docking plate 23; the seventh docking plate 24 is provided with a seventh through hole 241, which penetrates the seventh docking plate 24; the eighth docking plate 25 is provided with an eighth through hole 251, which penetrates the eighth docking plate 25; the fifth through hole 221, the sixth through hole 231, the seventh through hole 241, and the eighth through hole 251 are aligned.
[0024] Please refer to some embodiments of this application. Figure 1-2A predetermined number of pads 4 are provided on the inner wall of the first clamping channel 10 of the first arch clamping unit 1; the pads 4 are also provided on the inner wall of the second clamping channel 20 of the second arch clamping unit 2. In this application, in order to avoid the submarine cable from contacting the inner wall of the clamping channel of the arch clamping unit, thereby preventing the clamping channel of the arch clamping unit from potentially causing wear to the submarine cable, pads 4 are provided on the inner wall of the clamping channel.
[0025] The submarine cable arch clamp provided in this application has the advantages of simple structure and easy assembly. Since the submarine cable arch clamp is provided with a first arch clamp unit and a second arch clamp unit, the first clamping channel of the first arch clamp unit and the second clamping channel of the second arch clamp unit together form a submarine cable clamping channel. When installing the submarine cable, the first clamping channel of the first arch clamp unit wraps around a portion of the submarine cable, and the second clamping channel of the second arch clamp unit wraps around the other portion of the submarine cable. The second arch clamp unit and the first arch clamp unit are installed together, thus easily fixing the submarine cable to the submarine cable arch clamp. Compared with the prior art, the submarine cable arch clamp of this application is extremely easy to install and disassemble. Multiple submarine cable arch clamps can wrap the submarine cable of a preset length segment by segment, resulting in high work efficiency.
[0026] The above embodiments are only for illustrating the technical concept and features of this utility model, and are intended to enable those skilled in the art to understand the content of this utility model and implement it accordingly. They should not be construed as limiting the scope of protection of this utility model. All equivalent changes or modifications made in accordance with the spirit and essence of this utility model should be included within the scope of protection of this utility model.
Claims
1. A mid-water arching clamp characterized in that, include: A predetermined number of first arch clamp units, each first arch clamp unit having a first clamping channel, the first arch clamp unit including a first arch clamp cylinder, the first clamping channel being formed by bending the first arch clamp cylinder; A predetermined number of second arch clamp units, each second arch clamp unit having a second clamping channel, the second arch clamp unit including a second arch clamp cylinder, the second clamping channel being formed by bending the second arch clamp cylinder; When the first arch clamp unit and the second arch clamp unit are detachably installed together, the first arch clamp cylinder and the second arch clamp cylinder are connected, and the first clamping channel and the second clamping channel surround to form a submarine cable clamping channel.
2. The reclaimed water arch clamp of claim 1, wherein, The first arch clamping unit has a first arch clamping cylinder with a predetermined number of first bolt through holes, which penetrate the first arch clamping cylinder; the second arch clamping unit has a second arch clamping cylinder with a predetermined number of second bolt through holes, which penetrate the second arch clamping cylinder; when the first arch clamping cylinder and the second arch clamping cylinder are joined together, bolts are screwed into the first bolt through holes and the second bolt through holes, thereby enabling the first arch clamping unit and the second arch clamping unit to be detachably installed together.
3. The reclaimed water arch clamp of claim 1, wherein, The first arch clamp unit further includes a first docking plate, a second docking plate, a third docking plate, and a fourth docking plate, all of which are fixedly connected to a preset position on the first arch clamp cylinder. The second arch clamp unit further includes a fifth docking plate, a sixth docking plate, a seventh docking plate, and an eighth docking plate, all of which are fixedly connected to a preset position on the second arch clamp cylinder. When the first arch clamp unit and the second arch clamp unit are installed together, the first docking plate docks with the fifth docking plate, and the fourth docking plate docks with the eighth docking plate.
4. The water arch clamp of claim 3, wherein, The first mating plate has a first notch, and the fifth mating plate has a second notch. When the first arch clamp unit and the second arch clamp unit are installed together, the first notch and the second notch align with a first elongated through hole. The second mating plate and the sixth mating plate have a preset distance, thereby forming a second elongated through hole between them. The third mating plate and the seventh mating plate have a preset distance, thereby forming a third elongated through hole between them. The fourth mating plate and the eighth mating plate have a preset distance, thereby forming a fourth elongated through hole between them. The first elongated through hole, the second elongated through hole, the third elongated through hole, and the fourth elongated through hole are aligned.
5. The reclaimed water arch clamp of claim 3, wherein, The first mating plate is provided with a first through hole, which passes through the first mating plate; the second mating plate is provided with a second through hole, which passes through the second mating plate; the third mating plate is provided with a third through hole, which passes through the third mating plate; the fourth mating plate is provided with a fourth through hole, which passes through the fourth mating plate; the first through hole, the second through hole, the third through hole, and the fourth through hole are aligned.
6. The reclaimed water arch clamp of claim 3, wherein, The fifth mating plate is provided with a fifth through hole, which penetrates the fifth mating plate; the sixth mating plate is provided with a sixth through hole, which penetrates the sixth mating plate; the seventh mating plate is provided with a seventh through hole, which penetrates the seventh mating plate; the eighth mating plate is provided with an eighth through hole, which penetrates the eighth mating plate; the fifth through hole, the sixth through hole, the seventh through hole, and the eighth through hole are aligned.
7. The water arch clamp of claim 1, wherein, A preset number of pads are provided on the inner wall of the first clamping channel of the first arch clamping unit; the pads are also provided on the inner wall of the second clamping channel of the second arch clamping unit.