A device for installing railings on floating bridges

CN224633808UActive Publication Date: 2026-08-14SINOHYDRO BUREAU 6 CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-07-17
Publication Date
2026-08-14

AI Technical Summary

Technical Problem

[0004]为了解决飘桥栏杆安装过程中,现有方式存在搭设成本高,受地形影响大的问题,本实用新型提供了一种用于飘桥栏杆安装的装置

Benefits of technology

[0024]本实用新型的有益效果:本实用新型,通过设计主体台车、作业台车,作业台车采用钢绞线悬吊在主体台车的悬挑部位置,主体台车靠近飘桥的边缘,作业台车悬吊在水面上方,为施工人员提供一个作业平台,在安装作业的过程中,主体台车可沿着飘桥的边缘移动,为飘桥的边缘安装栏杆提供一个可移动的平台;并且在地面行走状态时,主体台车、作业台车均可以移动,利用辅助架将主体台车与作业台车固定为一体结构,便于主体台车、作业台车整体在地面上移动;其具有结构简单,设备成本低,而且不受地面地形的影响。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224633808U_ABST
    Figure CN224633808U_ABST
Patent Text Reader

Abstract

This utility model provides a device for installing railings on a floating bridge, belonging to the field of suspended construction technology. It includes a main trolley, a working trolley, steel strands, and an auxiliary frame. The main trolley and working trolley are designed such that the working trolley is suspended by steel strands at the cantilevered portion of the main trolley. The main trolley is located near the edge of the floating bridge, while the working trolley is suspended above the water surface, providing a working platform for construction workers. During installation, the main trolley can move along the edge of the floating bridge, providing a movable platform for installing the railings. Both the main trolley and working trolley can move on the ground. The auxiliary frame secures the main trolley and working trolley into a single structure, facilitating their overall movement on the ground. This device features a simple structure, low equipment cost, and is unaffected by ground terrain.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of suspended construction technology, specifically a device for installing railings on floating bridges. Background Technology

[0002] The railings of a floating bridge are an important component for protecting the safety of pedestrians and vehicles. Generally, the railings of a floating bridge are installed at the outermost edge of the bridge deck, with the installation position facing the water. They require suspended or elevated supports for assistance, and construction workers stand on the suspended or elevated work platform to complete the installation work.

[0003] In the existing technology, the installation of floating bridge railings mainly relies on the erection of temporary scaffolding, which poses safety hazards such as personnel falling and falling objects, and the erection cost is high. The use of traditional aerial work platforms is easily limited by the terrain under the bridge, making it impossible to operate stably in deep valleys or on water, and the cost is also high. The installation methods of railings vary for different floating bridge structures, and traditional installation devices cannot be flexibly adjusted, requiring frequent changes of auxiliary tools, which delays the construction period. Therefore, this utility model provides a device for the installation of floating bridge railings. Utility Model Content

[0004] To address the problems of high installation costs and susceptibility to terrain in existing methods for installing bridge railings, this invention provides a device for installing bridge railings.

[0005] To achieve the above objectives, the present invention adopts the following technical solution:

[0006] A device for installing railings on a floating bridge includes: a main trolley, a work trolley, and an auxiliary frame.

[0007] The main trolley has a cantilever section on one side.

[0008] The work trolley is suspended below the cantilever section by steel strands.

[0009] When in ground-walking mode, an auxiliary frame is installed between the main trolley and the work trolley.

[0010] As a further description of the above technical solution:

[0011] It also includes: a detachable straight ladder, the top of which is provided with a hook, which is hung on the cantilever part of the main trolley.

[0012] As a further description of the above technical solution:

[0013] The main trolley includes: a base frame, a top frame, a first column, and a railing.

[0014] The base frame is fixedly installed with a first traveling wheel, which has a braking function; the bottom end of the first column is fixedly connected to the top edge of the base frame, and multiple sets of the first column are provided; the top frame is fixedly connected to the top of the first column, and a railing is fixedly installed on the top of the top frame; one side of the top frame extends outward to form a cantilever, the railing extends above the cantilever, and an arc-shaped handrail is fixedly connected to the end of the cantilever.

[0015] As a further description of the above technical solution:

[0016] A second diagonal brace is fixedly connected between the first column and the base frame; a first diagonal brace is fixedly connected between the first column and the cantilever section.

[0017] As a further description of the above technical solution:

[0018] The base frame is equipped with counterweights.

[0019] As a further description of the above technical solution:

[0020] The work trolley includes: a platform, a frame fixedly installed on the top of the platform, and a second traveling wheel fixedly installed on the bottom of the platform.

[0021] The enclosure includes: several main frames distributed along the edge of the platform, with a perimeter frame fixedly connected between the main frames, and short frames fixedly connected to the platform support.

[0022] As a further description of the above technical solution:

[0023] The auxiliary frame includes a rod, both ends of which are fixedly connected to clamps, and the sides of the clamps are threaded with locking screws.

[0024] The beneficial effects of this utility model are as follows: This utility model, through the design of a main trolley and a working trolley, with the working trolley suspended by steel strands at the cantilevered part of the main trolley, and the main trolley close to the edge of the floating bridge, while the working trolley is suspended above the water surface, provides a working platform for construction personnel. During the installation process, the main trolley can move along the edge of the floating bridge, providing a movable platform for installing railings along the edge of the floating bridge. Furthermore, both the main trolley and the working trolley can move when walking on the ground. The auxiliary frame is used to fix the main trolley and the working trolley into an integrated structure, facilitating the overall movement of the main trolley and the working trolley on the ground. It has the advantages of simple structure, low equipment cost, and is not affected by the ground terrain. Attached Figure Description

[0025] The following figures are shown to more clearly illustrate a device for installing railings on floating bridges;

[0026] Figure 1 This is a schematic diagram illustrating the use of this utility model;

[0027] Figure 2 This is a three-dimensional schematic diagram of the present invention;

[0028] Figure 3 This is a schematic diagram of the present invention in a walking state on the ground;

[0029] Figure 4 This is a schematic diagram of the auxiliary frame of this utility model.

[0030] The labels in the attached diagram;

[0031] 1. Main trolley; 1a. Cantilever section; 101. Base frame; 102. First column; 103. First traveling wheel; 104. Top frame; 105. Guardrail; 106. Curved handrail; 107. First diagonal brace; 108. Second diagonal brace; 2. Counterweight; 3. Work trolley; 301. Platform; 302. Enclosure frame; 3021. Main frame; 3022. Enclosure frame; 3023. Short frame; 303. Second traveling wheel; 4. Auxiliary frame; 401. Pole; 402. Clamp; 403. Locking screw; 5. Steel strand; 6. Detachable straight ladder. Detailed Implementation

[0032] Please refer to the attached document. Figures 1-4 This application illustrates a device for installing a floating bridge railing, which provides a working platform for construction workers during the installation process. Specifically, it includes: a main trolley 1, a working trolley 3, steel strands 5, and an auxiliary frame 4.

[0033] like Figures 1-3 As shown, a cantilever section 1a is provided on one side of the main trolley 1. The cantilever section 1a is used to install the work trolley 3. Specifically, the work trolley 3 is suspended below the cantilever section 1a by steel strand 5.

[0034] like Figure 1 , Figure 2 In the usage state shown, the main trolley 1 moves to the edge of the floating bridge, so that the cantilever part 1a of the main trolley 1 is suspended above the water surface. At this time, the working trolley 3 is suspended above the water surface by the steel strand 5, thus providing a working platform for the construction personnel (the position on the working trolley 3 is the working platform). During the installation operation, the main trolley 1 can move along the edge of the floating bridge to provide a movable platform for installing the railings on the edge of the floating bridge.

[0035] like Figure 3 As shown, when in ground walking mode, an auxiliary frame 4 is installed between the main trolley 1 and the work trolley 3 to fix the main trolley 1 and the work trolley 3 into an integrated structure, which facilitates the overall movement of the main trolley 1 and the work trolley 3 on the ground.

[0036] This utility model, through the design of a main trolley 1 and a working trolley 3, with the working trolley 3 suspended from the cantilevered part 1a of the main trolley 1 by steel strand 5, provides a working platform for construction personnel by placing the main trolley 1 near the edge of the floating bridge and the working trolley 3 suspended above the water surface. During the installation process, the main trolley 1 can move along the edge of the floating bridge, providing a movable platform for installing railings on the edge of the floating bridge. Furthermore, both the main trolley 1 and the working trolley 3 can be moved when walking on the ground. The main trolley 1 and the working trolley 3 are fixed into an integrated structure by an auxiliary frame 4, facilitating the overall movement of the main trolley 1 and the working trolley 3 on the ground.

[0037] When arranging the device for installing a floating bridge railing according to this utility model, it will be as follows: Figure 3 The integrated structure shown is moved to the riverbank. The work platform 3 is temporarily lifted manually or with the help of a support frame. The work platform 3 is then moved above the river surface (the work platform 3 is suspended in the air, and is temporarily pulled by an auxiliary rope to maintain its stability). Then the auxiliary frame 4 is removed, and the work platform 3 is slowly lowered until the steel strand 5 is under tension. The work platform 3 is then suspended by the steel strand 5.

[0038] In one embodiment, a detachable ladder 6 is also designed to facilitate construction workers getting on and off the work platform 3.

[0039] The top of the detachable ladder 6 is equipped with a hook, which is hung at the cantilever part 1a of the main trolley 1. Personnel can go up and down the work trolley 3 via the detachable ladder 6.

[0040] In one embodiment, the main trolley 1 includes: a base frame 101, a first column 102, a top frame 104, a railing 105, and an arc-shaped handrail 106.

[0041] The bottom of the base frame 101 is fixedly equipped with first traveling wheels 103. The base frame 101 has a rectangular structure. Four sets of first traveling wheels 103 are provided. The first traveling wheels 103 have a braking function. The selection of first traveling wheels 103 with a braking function ensures stability of the main trolley 1 during actual use, preventing the main trolley 1 from shaking and affecting the construction personnel on the work trolley 3. The bottom end of the first upright column 102 is fixedly connected to the top edge of the base frame 101. Multiple sets of first upright columns 102 are provided, such as... Figure 2As shown, the first column 102 is provided with six sets, and the top frame 104 is fixedly connected to the top of the first column 102. The top of the top frame 104 is fixedly installed with a railing 105. The railing 105 is a two-sided railing structure. Multiple horizontal braces are fixedly connected between the first columns 102 at the end away from the cantilever 1a to form a ladder structure, so that construction workers can climb the top frame 104. One side of the top frame 104 extends outward to form the cantilever 1a. The railing 105 extends above the cantilever 1a, and the railing 105 is fixedly connected to the end of the cantilever 1a with an arc-shaped handrail 106. The arc-shaped handrail 106 is used for workers to hold on when climbing the detachable straight ladder 6.

[0042] Both the base frame 101 and the top frame 104 are formed by welding together several horizontally and vertically distributed skeletons to form a support frame, and anti-slip plates are fixedly installed on the top of the support frame.

[0043] In one embodiment, in order to increase the stability of the connection between the first column 102 and the base frame 101, a second diagonal brace 108 is fixedly connected between the first column 102 and the base frame 101.

[0044] In one embodiment, in order to increase the stability and structural strength between the first column 102 and the cantilever 1a, a first diagonal brace 107 is fixedly connected between the first column 102 and the cantilever 1a.

[0045] In one embodiment, a counterweight 2 is provided on the base frame 101. The counterweight 2 is fixedly installed in a placeable / detachable manner to increase the weight of the main trolley 1 and make it more stable.

[0046] In one embodiment, the work trolley 3 includes: a platform 301, a frame 302 fixedly installed on the top of the platform 301, and a second traveling wheel 303 fixedly installed on the bottom of the platform 301.

[0047] The second traveling wheel 303 enables the work trolley 3 to support itself on the ground and move, such as Figure 3 As shown, the main trolley 1 and the work trolley 3 are a whole, but they are still independently supported on the ground, so that they can move stably on the ground.

[0048] Specifically, the enclosure 302 includes: several main frames 3021 distributed on the edge of the platform 301, with enclosure 3022 fixedly connected between the main frames 3021, and short frames 3023 fixedly connected between the enclosure 3022 and the support of the platform 301. The short frames 3023, the main frames 3021 and the enclosure 3022 constitute an enclosure structure, which can prevent construction personnel from falling off the work trolley 3.

[0049] In one embodiment, the auxiliary frame 4 includes: a rod 401, both ends of which are fixedly connected to a clip 402, and the side of the clip 402 is threaded with a locking screw 403.

[0050] The clamp 402 is a horizontal U-shaped structure that can be clamped onto the frame of the main trolley 1 / work trolley 3. Then, the locking screw 403 is tightened to fix the clamp 402 to the main trolley 1 / work trolley 3.

[0051] Other embodiments of the present invention will readily occur to those skilled in the art upon consideration of the specification and practice of the disclosure herein. This application is intended to cover any variations, uses, or adaptations of the present invention that follow the general principles of the present invention and include common knowledge or customary techniques in the art not disclosed herein. The specification and examples are to be considered exemplary only, and the true scope and spirit of the present invention are indicated by the following claims.

[0052] It should be understood that relational terms such as "first" and "second" are used merely to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. This invention is not limited to the precise structures described above and shown in the accompanying drawings, and various modifications and changes can be made without departing from its scope. The scope of this invention is limited only by the appended claims.

Claims

1. A device for the installation of a balustrade for a floating bridge, characterised in that, include: The main trolley (1) has a cantilever (1a) on one side; The work trolley (3) is suspended below the cantilever section (1a) by steel strand (5); When in ground walking mode, an auxiliary frame (4) is installed between the main trolley (1) and the work trolley (3).

2. A device for the installation of a balustrade for a floating bridge according to claim 1, characterised in that, Also includes: A detachable straight ladder (6) is provided with a hook at the top of the detachable straight ladder (6), and the hook is hung at the cantilever part (1a) of the main trolley (1).

3. A device for installing a bridge railing according to claim 1, wherein The main trolley (1) includes: A base frame (101) is provided, and a first traveling wheel (103) is fixedly installed at the bottom of the base frame (101). The first traveling wheel (103) has a braking function. The first column (102) is fixedly connected at its bottom end to the top edge of the base frame (101), and multiple sets of the first column (102) are provided. A top frame (104) is fixedly connected to the top of the first column (102), and a fence (105) is fixedly installed on the top of the top frame (104); One side of the top frame (104) extends outward to form a cantilever (1a), and a railing (105) extends above the cantilever (1a), and an arc-shaped handrail (106) is fixedly connected to the end of the cantilever (1a) of the railing (105).

4. The device for installing railings on a floating bridge according to claim 3, characterized in that: A second diagonal brace (108) is fixedly connected between the first column (102) and the base frame (101); A first diagonal brace (107) is fixedly connected between the first column (102) and the cantilever (1a).

5. A device for installing a balustrade for a floating bridge according to claim 3, characterised in that: The base frame (101) is equipped with a counterweight (2).

6. A device for installing a bridge railing according to claim 1, wherein The work trolley (3) includes: a platform (301), a frame (302) fixedly installed on the top of the platform (301), and a second traveling wheel (303) fixedly installed on the bottom of the platform (301); The enclosure (302) includes: a plurality of main frames (3021) distributed on the edge of the platform (301), a perimeter frame (3022) fixedly connected between the main frames (3021), and a short frame (3023) fixedly connected between the perimeter frame (3022) and the platform (301) support.

7. A device for installing a bridge railing according to claim 1, wherein The auxiliary frame (4) includes: The rod (401) has a locking piece (402) fixedly connected to both ends, and a locking screw (403) is threadedly connected to the side of the locking piece (402).