Finished product stacking device for cement pole production
Patent Information
- Application Number
- CN202522208390.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-20
- Publication Date
- 2026-08-18
- Estimated Expiration
- 2035-10-20
AI Technical Summary
[0004]为了解决上述现有技术中存在水泥电杆的取用十分繁琐的问题,本实用新型提供一种水泥电杆生产用成品堆放装置,电杆都是独立存放的,操作人员可以根据需要将指定尺寸的电杆拿取、存放,能够一定程度上提升电杆的存取效率,其具体技术方案为:一种水泥电杆生产用成品堆放装置,包括:水泥电杆本体,所述水泥电杆本体的外部安装有可移动固定结构,所述可移动固定结构外部安装有存放架结构,所述存放架结构的前壁面安装有三组运输架结构;所述可移动固定结构包括:电杆支撑小车、两个电杆固定底座以及两个电杆固定上盖;两个所述电杆固定底座分别固定安装在电杆支撑小车的上壁面,所述水泥电杆本体安装在两个电杆固定底座的上壁面,两个所述电杆固定上盖分别通过螺栓固定安装在电杆固定底座的上壁面,且所述水泥电杆本体固定在两个电杆固定底座和两个电杆固定上盖之间
[0012]本实用新型的一种水泥电杆生产用成品堆放装置,与现有技术相比,有益效果为:该水泥电杆生产用成品堆放装置通过对水泥电杆进行独立存放,能够避免水泥电杆相互挤压,保证每个电杆的独立完整存放,并且将存放水泥电杆的支架,通过承重架进行太高,进而防止水泥电杆被水泡;由于各个电杆都是独立存放的,操作人员可以根据需要将指定尺寸的电杆拿取、存放,能够一定程度上提升电杆的存取效率。
Smart Images

Figure CN224645771U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of cement pole technology, specifically relating to a finished product stacking device for cement pole production. Background Technology
[0002] Cement poles are hollow, precast columnar components made with reinforced steel as the reinforcing skeleton and concrete as the main matrix material, manufactured through processes such as centrifugal molding and steam curing. Their core function is to serve as a supporting structure for overhead power, communication, railway, and municipal lighting lines, bearing the conductors, insulators, hardware, and external loads to ensure the safe and stable transmission of energy and information. They are classified by structure into prestressed and non-prestressed poles, and by shape into tapered and equal-diameter poles. They offer advantages such as high strength, durability, corrosion resistance, and low maintenance costs, but suffer from disadvantages such as being heavy and inconvenient to transport. They are backbone components of modern power grids and urban infrastructure.
[0003] When storing cement poles, they are usually simply stacked on the ground. This method not only easily leads to damage from impacts but also makes hoisting inconvenient. To address these issues, CN215515084U describes a finished product stacking device for cement pole production, which can neatly stack cement poles. However, this solution only allows for top-to-bottom retrieval of cement poles. When storing cement poles of different sizes, retrieving them becomes extremely cumbersome, requiring all the poles above the target pole to be removed before the required pole can be hoisted. Utility Model Content
[0004] To address the cumbersome handling of cement poles in existing technologies, this invention provides a finished product stacking device for cement pole production. The poles are stored independently, allowing operators to retrieve and store poles of specified sizes as needed, thus improving storage efficiency. The specific technical solution is as follows: A finished product stacking device for cement pole production includes: a cement pole body; a movable fixing structure is installed on the exterior of the cement pole body; a storage rack structure is installed on the exterior of the movable fixing structure; three sets of transport rack structures are installed on the front wall of the storage rack structure; the movable fixing structure includes: a pole support trolley, two pole fixing bases, and two pole fixing covers; the two pole fixing bases are respectively fixedly installed on the upper wall of the pole support trolley; the cement pole body is installed on the upper wall of the two pole fixing bases; the two pole fixing covers are respectively fixedly installed on the upper wall of the pole fixing bases by bolts; and the cement pole body is fixed between the two pole fixing bases and the two pole fixing covers.
[0005] Preferably, the storage rack structure includes: a storage rack body, a load-bearing base, several rear baffles, several protective slides, and several protective baffles; the load-bearing base is installed on the lower wall of the storage rack body, several rear baffles are respectively installed on the rear wall of the storage rack body, several protective slides are respectively installed on the front wall of the storage rack body, and several protective baffles are respectively movably installed inside the protective slides.
[0006] Preferably, the three sets of transport frame structures include: a transport loading and unloading plate and a transport trolley; the transport loading and unloading plate is installed on the upper wall of the transport trolley, and the transport loading and unloading plate is locked onto the front wall of the protective slide.
[0007] Preferably, the storage rack body is a three-layer storage rack, and each layer of the storage rack body is provided with a partition.
[0008] Preferably, the three sets of transport frame structures have different heights.
[0009] Preferably, an anti-slip rubber pad is provided between the two pole fixing bases and the cement pole body.
[0010] Preferably, an anti-slip rubber pad is provided between the two pole fixing covers and the cement pole body.
[0011] Preferably, the front wall of the pole support trolley is provided with a handle.
[0012] This utility model discloses a finished product stacking device for cement pole production. Compared with the prior art, the advantages of this device are as follows: By storing cement poles independently, it avoids mutual compression and ensures the independent and intact storage of each pole. Furthermore, the support for storing the cement poles is raised too high using a load-bearing frame, thus preventing the cement poles from being soaked in water. Since each pole is stored independently, operators can retrieve and store poles of specified sizes as needed, which can improve the efficiency of pole storage and retrieval to a certain extent. Attached Figure Description
[0013] Figure 1 A schematic diagram of the overall structure of the finished product stacking device for cement pole production provided by this utility model; Figure 2 A partial structural diagram of the finished product stacking device for cement pole production provided by this utility model; Figure 3 A partial structural diagram of the finished product stacking device for cement pole production provided by this utility model; Figure 4 An exploded view of the third part of the finished product stacking device for cement pole production provided by this utility model; in, Figures 1 to 4The attached diagram and components of the finished product stacking device for cement pole production are as follows: 1. Cement pole body; 2. Pole support trolley; 3. Pole fixing base; 4. Pole fixing cover; 5. Storage rack body; 6. Load-bearing base; 7. Rear baffle; 8. Protective slide; 9. Protective baffle; 10. Transport loading and unloading plate; 11. Transport trolley; 12. Anti-slip rubber mat; 13. Handle. Detailed Implementation
[0014] The following are specific implementation cases and appendices. Figures 1-4 This utility model will be further described below, but it is not limited to these embodiments. This utility model provides a technical solution: a finished product stacking device for cement pole production, comprising: a cement pole body 1, a movable fixing structure installed on the outside of the cement pole body 1, a storage rack structure installed on the outside of the movable fixing structure, and three sets of transport rack structures installed on the front wall of the storage rack structure; the movable fixing structure includes: a pole support trolley 2, two pole fixing bases 3, and two pole fixing covers 4; the two pole fixing bases 3 are respectively fixedly installed on the poles. The upper wall of the support trolley 2 is supported by a cement pole body 1, which is installed on the upper wall of two pole fixing bases 3. Two pole fixing covers 4 are respectively fixed to the upper wall of the pole fixing bases 3 by bolts. The cement pole body 1 is fixed between the two pole fixing bases 3 and the two pole fixing covers 4. The three sets of transport frame structures have different heights. Anti-slip rubber pads 12 are provided between the two pole fixing bases 3 and the cement pole body 1, and anti-slip rubber pads 12 are provided between the two pole fixing covers 4 and the cement pole body 1. A handle 13 is provided on the front wall of the pole support trolley 2.
[0015] As a preferred embodiment, the storage rack structure further includes: a storage rack body 5, a load-bearing base 6, several rear baffles 7, several protective slides 8, and several protective baffles 9; the load-bearing base 6 is installed on the lower wall of the storage rack body 5, several rear baffles 7 are respectively installed on the rear wall of the storage rack body 5, several protective slides 8 are respectively installed on the front wall of the storage rack body 5, and several protective baffles 9 are respectively movably installed inside the protective slides 8. The storage rack body 5 is a three-layer storage rack, and each layer of the storage rack body 5 is provided with a partition.
[0016] As a preferred option, the three sets of transport frame structures further include: a transport loading and unloading plate 10 and a transport mobile trolley 11; the transport loading and unloading plate 10 is installed on the upper wall of the transport mobile trolley 11, and the transport loading and unloading plate 10 is locked on the front wall of the protective slide 8.
[0017] Working principle: The storage rack body 5 has three storage racks, and each storage rack support has several vertical partitions, which allows the cement pole body 1 to be installed independently in the small partitions of the storage rack body 5, avoiding multiple cement pole bodies 1 from being squeezed against each other, and allowing the cement pole bodies 1 to be stored independently.
[0018] When storing the cement pole body 1, the operator first pulls the protective baffle 9 out of the protective slide rail 8. The operator then moves the transport loading and unloading plate 10 to the storage layer of the corresponding storage rack body 5 using the transport trolley 11, so that the transport loading and unloading plate 10 aligns with the protective slide rail 8 and is secured by the slot. Next, the operator pulls the pole support trolley 2 out of the storage rack body 5 using the handle 13, so that the pole support trolley 2 is positioned on the upper wall of the transport loading and unloading plate 10. Then, the operator uses the hoisting equipment to place the cement pole body 1 on the upper wall of the two pole fixing bases 3. The two pole fixing bases 3 and the pole support trolley 2 have gaps to facilitate the access of hoisting tools. The upper walls of the two pole fixing bases 3 are equipped with anti-slip rubber pads 12, allowing the cement pole body 1 to be stably placed on the upper walls of the two pole fixing bases 3. Next, the operator uses bolts to fix the two pole fixing covers 4 to the upper walls of the pole fixing bases 3, securing the cement pole body 1. The anti-slip rubber pads 12 between the pole fixing covers 4 and the cement pole body 1 ensure the cement pole body 1 is stably fixed on the pole support trolley 2. Then, the operator uses the handle 13 to push the pole support trolley 2 into the storage rack body 5, and then installs the protective baffle 9 back into the protective slide rail 8. At this point, the storage of the cement pole body 1 is complete.
[0019] When retrieving the cement pole body 1, the operator locates the cement pole body 1 to be retrieved from the storage rack body 5, and uses the appropriate transport trolley 11 to fix the transport loading and unloading plate 10 in the corresponding position through the corresponding storage rack body 5, so that the transport loading and unloading plate 10 is locked in the protective slide 8. Then, the protective baffle 9 is removed from the protective slide 8. The operator pulls the pole support trolley 2 with the handle 13, so that the pole support trolley 2 carrying the cement pole body 1 is on the transport loading and unloading plate 10. Then, the operator removes the two pole fixing covers 4 with tools. Then, the operator fixes the cement pole body 1 with hoisting tools, and then lifts the cement pole body 1 with hoisting equipment, thus completing the retrieval of the cement pole body 1.
[0020] In the description of this utility model, the term "multiple" refers to two or more. Unless otherwise explicitly defined, the terms "upper," "lower," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. The terms "connection," "installation," "fixing," etc., should be interpreted broadly. For example, "connection" can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection or an indirect connection through an intermediate medium. For those skilled in the art, the specific meaning of the above terms in this utility model can be understood according to the specific circumstances.
[0021] The above description is merely a preferred embodiment of this utility model and is not intended to limit the utility model. Various modifications and variations can be made to this utility model by those skilled in the art. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of this utility model should be included within the protection scope of this utility model.
Claims
1. A finished product stacking device for cement pole production, comprising: A cement pole body (1) is characterized in that a movable fixing structure is installed on the outside of the cement pole body (1), a storage rack structure is installed on the outside of the movable fixing structure, and three sets of transport rack structures are installed on the front wall of the storage rack structure; the movable fixing structure includes: a pole support trolley (2), two pole fixing bases (3) and two pole fixing covers (4); the two pole fixing bases (3) are respectively fixedly installed on the upper wall of the pole support trolley (2), the cement pole body (1) is installed on the upper wall of the two pole fixing bases (3), and the two pole fixing covers (4) are respectively fixedly installed on the upper wall of the pole fixing bases (3) by bolts, and the cement pole body (1) is fixed between the two pole fixing bases (3) and the two pole fixing covers (4).
2. The finished product stacking device for a cement pole production according to claim 1, characterized in that, The storage rack structure includes: a storage rack body (5), a load-bearing base (6), several rear baffles (7), several protective slides (8), and several protective baffles (9); the load-bearing base (6) is installed on the lower wall of the storage rack body (5), several rear baffles (7) are respectively installed on the rear wall of the storage rack body (5), several protective slides (8) are respectively installed on the front wall of the storage rack body (5), and several protective baffles (9) are respectively movably installed inside the protective slides (8).
3. The finished product stacking device for a cement pole production according to claim 1, characterized in that, The three sets of transport frame structures include: a transport loading and unloading plate (10) and a transport mobile trolley (11); the transport loading and unloading plate (10) is installed on the upper wall of the transport mobile trolley (11), and the transport loading and unloading plate (10) is locked on the front wall of the protective slide (8).
4. The finished product stacking device for cement pole production according to claim 2, characterized in that, The storage rack body (5) is a three-layer storage rack, and each layer of the storage rack body (5) is provided with a partition.
5. The finished product stacking device for a cement pole production according to claim 1, characterized in that, The three groups of transport racks have different structural heights.
6. The finished product stacking device for a cement pole production according to claim 1, characterized in that, An anti-slip rubber pad (12) is provided between the two pole fixing bases (3) and the cement pole body (1).
7. The finished product stacking device for a cement pole production according to claim 1, characterized in that, An anti-slip rubber pad (12) is provided between the two pole fixing covers (4) and the cement pole body (1).
8. The finished product stacking device for cement pole production according to claim 1, characterized in that, The front wall of the pole support trolley (2) is provided with a handle (13).
Citation Information
Patent Citations
Finished product stacking device for cement pole production
CN215515084U