Technical Problem

[0004]本实用新型的目的在于提供一种装配式钢结构棚架,以解决上述背景技术中提出的现有钢结构棚架建造工期较长的问题

Benefits of technology

1、本实用新型中,通过设置的混凝土基座、支撑立柱、固定架、加固组件、支撑架、角铁梁和顶棚组件,在搭建钢结构棚架时,先安装混凝土和支撑立柱,之后分别安装加固组件、角铁梁和顶棚组件,即可完成钢结构棚架的搭建,这种设计使钢结构棚架的建造更加快速,钢结构棚架的多个构件采用预制分段、现场螺栓连接的方式,缩短了工期,提高了工作效率;

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224647838U_ABST
    Figure CN224647838U_ABST
Patent Text Reader

Abstract

The utility model relates to steel structure shed frame technical field especially is a kind of fabricated steel structure shed frame, including multiple concrete pedestals, the vertical support column of concrete pedestal top end installation is set, the fixed frame of being set up symmetrically is fixedly connected with the left and right sides of support column, support column is two as a group, the fixed frame outside of multiple groups support column is equipped with reinforcing component, in the utility model, by the concrete pedestal, support column, fixed frame, reinforcing component, support frame, angle iron beam and ceiling component being set, when building steel structure shed frame, first install concrete and support column, then respectively install reinforcing component, angle iron beam and ceiling component, can complete the building of steel structure shed frame, this design makes the construction of steel structure shed frame more quickly, the multiple components of steel structure shed frame adopt the mode of prefabricated segmentation, field bolt connection, shortens the construction period, improves work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of steel structure shed technology, specifically a prefabricated steel structure shed. Background Technology

[0002] Steel structure sheds are a type of building constructed with steel as the main supporting structure, forming a frame system through welding, bolting, and other methods, and combined with a variety of covering materials. Its core components include steel columns, steel beams, purlins, and support systems. Steel shed construction technology is widely used both domestically and internationally, with its core objective being to prioritize traffic flow and emphasize rapid construction.

[0003] Existing steel structure sheds are widely used, but during the construction of steel structure sheds, welding is required between multiple sets of steel columns and steel beams. On-site welding and high-altitude operations take a lot of time, resulting in a long construction period. Therefore, a prefabricated steel structure shed is proposed to address the above problems. Utility Model Content

[0004] The purpose of this utility model is to provide a prefabricated steel structure shed to solve the problem of long construction period of existing steel structure sheds mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: A prefabricated steel structure canopy includes multiple concrete bases. Vertically arranged support columns are installed at the top of the concrete bases. Fixed brackets are fixedly connected to both sides of the support columns and are arranged symmetrically. The support columns are arranged in pairs. Reinforcing components are installed on the outside of the fixed brackets on the multiple sets of support columns. A support frame is fixedly connected to the outside of the support column on one side of the fixed bracket. An angle iron beam is installed at the top of the support frame. A canopy component is installed at the top of every two sets of support columns.

[0006] Preferably, the reinforcement component includes a fixing frame disposed at the top of the fixing frame, and multiple fixing frames are fixedly connected to each other by connecting plates, with a reinforcement frame fixedly connected between the upper and lower connecting plates.

[0007] Preferably, the canopy assembly includes support canopies symmetrically installed on the top of the support columns, and multiple connecting rods are fixedly connected between the two support canopies.

[0008] Preferably, a horizontally arranged connecting beam is symmetrically installed between the two angle iron beams. A vertically arranged vertical rod is fixedly connected to the center of the top of the connecting beam. An inclined plate, symmetrically arranged and fixedly connected to the top of the connecting beam, is fixedly connected to the outside of the vertical rod. A horizontally arranged fixing plate is fixedly connected to the top of the inclined plate.

[0009] Preferably, the angle iron beam is installed on the top of the support frame with bolts and nuts, the fixing frame is installed on the top of the fixing frame with bolts and nuts, the support shed is installed on the top of the support column with bolts and nuts, and the left and right ends of the fixing plate are welded to the outside of the support shed.

[0010] Compared with the prior art, the beneficial effects of this utility model are: 1. In this utility model, by setting up a concrete base, supporting columns, fixing frame, reinforcing components, supporting frame, angle iron beam and roof components, when building a steel structure shed, the concrete and supporting columns are installed first, and then the reinforcing components, angle iron beam and roof components are installed respectively, so that the steel structure shed can be built. This design makes the construction of steel structure sheds faster. The multiple components of the steel structure shed adopt the method of prefabrication and segmentation and on-site bolt connection, which shortens the construction period and improves work efficiency. 2. In this utility model, by setting up connecting beams, vertical rods, inclined plates and fixing plates, the connecting beams are placed between two angle iron beams, and bolts and nuts are used to fix the connecting beams and angle iron beams. The connection between the fixing plate and the support canopy is welded, and the assembly of the steel structure canopy can be completed. This design can reinforce multiple sets of canopy components and connect multiple sets of canopy components into a whole, thereby increasing its stability. Attached Figure Description

[0011] Figure 1 This is a schematic diagram of the overall structure of this utility model; Figure 2 This is a schematic diagram of the connecting beam installation structure of this utility model; Figure 3 This is a schematic diagram of the installation structure of the roof component of this utility model; Figure 4 This is a schematic diagram of the roof component structure of this utility model; Figure 5 This is a schematic diagram of the angle iron beam installation structure of this utility model; Figure 6 This is a schematic diagram of the installation structure of the reinforcement component of this utility model.

[0012] In the diagram: 1. Concrete base; 2. Support column; 3. Fixing frame; 4. Reinforcing component; 41. Fixing frame; 42. Connecting plate; 43. Reinforcing frame; 5. Support frame; 6. Angle iron beam; 7. Canopy component; 71. Supporting canopy; 72. Connecting rod; 8. Connecting beam; 9. Vertical rod; 10. Inclined plate; 11. Fixing plate. Detailed Implementation

[0013] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0014] In the description of this utility model, it should be understood that the directional terms such as "front, back, up, down, left, right", "horizontal, vertical, horizontal" and "top, bottom" indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and simplifying the description. Unless otherwise stated, these directional terms do not indicate or imply that the device or element referred to must have a specific orientation or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation on the scope of protection of this utility model. The directional terms "inner" and "outer" refer to the inner and outer contours of each component itself.

[0015] Furthermore, it should be noted that the use of terms such as "first" and "second" to define components is merely for the purpose of distinguishing the corresponding components. Unless otherwise stated, the above terms have no special meaning and therefore cannot be construed as limiting the scope of protection of this utility model.

[0016] Please see Figure 1-6 This utility model provides a technical solution: A prefabricated steel structure canopy includes multiple concrete bases 1. Vertically positioned support columns 2 are installed at the top of each concrete base 1. Each support column 2 has a fixed frame 3 symmetrically arranged on both its left and right sides. Support columns 2 are arranged in pairs. Reinforcing components 4 are installed on the outer sides of the fixed frames 3 on each pair of support columns 2. A support frame 5 is fixedly connected to the outer side of each support column 2 on one side of each fixed frame 3. An angle iron beam 6 is installed at the top of each support frame 5. A canopy assembly 7 is installed at the top of every two pairs of support columns 2. The reinforcing component 4 includes a fixed frame 41 at the top of the fixed frame 3. Multiple fixed frames 41 are fixedly connected by connecting plates 42. A reinforcing frame 43 is fixedly connected between the upper and lower connecting plates 42. The canopy assembly 7 includes a support canopy 71 symmetrically installed at the top of each support column 2. Multiple connecting rods 72 are fixedly connected between the canopies 71. Angle iron beams 6 are installed on the top of the support frame 5 with bolts and nuts. Fixed frame 41 is installed on the top of the fixed frame 3 with bolts and nuts. Support canopies 71 are installed on the top of the support columns 2 with bolts and nuts. The left and right ends of the fixed plate 11 are welded to the outside of the support canopies 71. With the concrete base 1, support columns 2, fixed frames 3, reinforcement components 4, support frames 5, angle iron beams 6 and canopy components 7 set up, when building the steel structure canopy, the concrete and support columns 2 are installed first, and then the reinforcement components 4, angle iron beams 6 and canopy components 7 are installed respectively, and the steel structure canopy can be built. This design makes the construction of the steel structure canopy faster. The multiple components of the steel structure canopy adopt the method of prefabrication and segmentation and on-site bolt connection, which shortens the construction period and improves work efficiency.

[0017] A horizontally arranged connecting beam 8 is symmetrically installed between two angle iron beams 6. A vertically arranged vertical rod 9 is fixedly connected to the center of the top of the connecting beam 8. An inclined plate 10, which is symmetrically arranged and fixedly connected to the top of the connecting beam 8, is fixedly connected to the outside of the vertical rod 9. A horizontally arranged fixing plate 11 is fixedly connected to the top of the inclined plate 10. By using the connecting beam 8, vertical rod 9, inclined plate 10 and fixing plate 11, the connecting beam 8 is placed between the two angle iron beams 6 and fixed with bolts and nuts. The connection between the fixing plate 11 and the support canopy 71 is welded to complete the assembly of the steel structure canopy. This design can reinforce multiple sets of canopy components 7 and connect them into a whole, thereby increasing its stability.

[0018] Workflow: Components such as reinforcing assembly 4, angle iron beams 6, and canopy assembly 7 need to be prefabricated in the factory. When assembling the steel structure canopy, first install multiple concrete bases 1 and install the supporting columns 2 on top of the concrete bases 1. Then install the reinforcing assembly 4, placing the fixing frame 41 on the fixing bracket 3 outside the supporting column 2 and fixing it with bolts and nuts. The connecting plate 42 and the reinforcing frame 43 can connect two supporting columns 2, increasing the stability of the supporting columns 2. Next, install the angle iron beam 6, placing it on the support bracket 5 outside the supporting column 2 and fixing it with bolts and nuts. The angle iron beam 6 can connect the supporting columns 2 on the same side, forming a preliminary frame from multiple supporting columns 2. Finally, install the canopy assembly 7, placing the supporting brackets 71 at both ends of the connecting rod 72 on... Multiple supporting columns 2 are topped and secured with bolts and nuts. Finally, connecting beams 8 are installed, with the connecting beams 8 at the bottom of the inclined plate 10 placed between two angle iron beams 6. The fixing plates 11 at the top of the vertical rod 9 are then fitted together with the supporting canopy 71. Bolts and nuts are used to fix the connecting beams 8 and angle iron beams 6, and the connection between the fixing plates 11 and the supporting canopy 71 is welded. This completes the assembly of the steel structure canopy. The design of the connecting beams 8 and their connecting components can reinforce multiple sets of canopy components 7, connecting them into a whole, thereby increasing its stability. The design of the reinforcing components 4, canopy components 7, and their connecting components makes the construction of the steel structure canopy faster. The multiple components of the steel structure canopy are prefabricated in sections and connected on-site with bolts, which shortens the construction period and improves work efficiency.

[0019] Contents not described in detail in this specification are existing technologies known to those skilled in the art. Standard parts used in this invention can all be purchased commercially, and irregularly shaped parts can be custom-made according to the description and drawings. The specific connection methods for each part all employ conventional methods such as bolts, rivets, and welding, which are already mature technologies. The machinery, parts, and equipment all use conventional models from the prior art, and the circuit connections also employ conventional connection methods from the prior art, which will not be detailed here.

[0020] Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.

Claims

1. A prefabricated steel structure shed frame comprising a plurality of concrete bases (1), characterized in that: The concrete base (1) is equipped with a vertically arranged support column (2) at the top. The support column (2) is fixedly connected to a fixed frame (3) arranged symmetrically on both the left and right sides. The support column (2) is arranged in pairs. The fixed frames (3) on multiple sets of support columns (2) are equipped with reinforcement components (4) on the outside. The fixed frame (3) is provided with a support frame (5) fixedly connected to the outside of the support column (2) on one side. An angle iron beam (6) is installed at the top of the support frame (5). A canopy component (7) is installed at the top of every two sets of support columns (2).

2. The prefabricated steel structure shed frame according to claim 1, characterized in that: The reinforcement component (4) includes a fixing frame (41) disposed at the top of the fixing frame (3), and multiple fixing frames (41) are fixedly connected to each other by connecting plates (42), and a reinforcement frame (43) is fixedly connected between the upper and lower connecting plates (42).

3. The prefabricated steel structure shed frame according to claim 2, characterized in that: The canopy assembly (7) includes support canopies (71) symmetrically installed on the top of the support column (2), and multiple connecting rods (72) are fixedly connected between the two support canopies (71).

4. The prefabricated steel structure shed frame according to claim 3, characterized in that: A horizontally arranged connecting beam (8) is symmetrically installed between the two angle iron beams (6). A vertically arranged vertical rod (9) is fixedly connected to the center of the top of the connecting beam (8). An inclined plate (10) is symmetrically arranged and fixedly connected to the top of the connecting beam (8) on the outside of the vertical rod (9). A horizontally arranged fixing plate (11) is fixedly connected to the top of the inclined plate (10).

5. The prefabricated steel structure shed frame according to claim 4, characterized in that: The angle iron beam (6) is installed on the top of the support frame (5) by bolts and nuts. The fixed frame (41) is installed on the top of the fixed frame (3) by bolts and nuts. The support shed (71) is installed on the top of the support column (2) by bolts and nuts. The left and right ends of the fixed plate (11) are welded to the outside of the support shed (71).