A construction site fence
Patent Information
- Application Number
- CN202522085233.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-28
- Publication Date
- 2026-08-18
- Estimated Expiration
- 2035-09-28
AI Technical Summary
[0003]目前,大多数施工围栏上的警示标语普遍采用喷漆喷涂的方式呈现,这种方式是通过喷枪将油漆直接喷绘在围栏表面,形成固定的文字、图案或符号,由于喷漆形成的警示标语与围栏表面紧密固化,一旦施工场景发生变化,如施工阶段转换、安全警示重点调整,或是标语出现磨损、褪色等情况,就难以对标语内容进行快速更换,而且施工单位往往需要准备多套预先喷好不同标语的施工围栏,不仅增加了施工围栏的采购、仓储与运输成本,还造成资源的闲置与浪费,故此,我们推出一种新的建筑工程施工围栏
1、通过向上拉动拉杆,拉杆带着插杆向上移动,使弹簧受到压缩,使插杆脱离插槽,然后将封闭条向下翻折,使置入口打开,将警示标语牌从置入口放置进警示槽内,将封闭条向上翻折复位,松开拉杆,在弹簧的复位下使插杆插入封闭条上的插槽内,使置入口封闭,从而可以对警示标语进行更换,施工单位只需储备多种内容的标语牌,就能通过更换警示标语满足全周期施工需求,大幅减少围栏采购、仓储及运输成本;且拉杆、插杆与弹簧构成的联动系统形成稳定的锁定结构,即使遭遇强风、轻微碰撞等外力冲击,封闭条也不会轻易开启,防止警示标语牌脱落丢失,保障警示功能长效稳定;
Smart Images

Figure CN224648289U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building engineering technology, and in particular to a construction fence for building engineering. Background Technology
[0002] During the construction process, construction fences serve as important facilities to isolate the construction area from the external environment. Setting up warning signs on their surfaces is a key measure to ensure construction safety. These warning signs can effectively remind passersby to pay attention to construction risks and regulate their behavior, thereby reducing the probability of safety accidents.
[0003] Currently, most warning signs on construction fences are presented by spray painting. This method involves spraying paint directly onto the fence surface with a spray gun to form fixed text, patterns, or symbols. Because the warning signs formed by spray painting are tightly cured on the fence surface, it is difficult to quickly change the content of the signs once the construction scene changes, such as the construction stage changes, the focus of safety warnings is adjusted, or the signs become worn or faded. Moreover, construction units often need to prepare multiple sets of construction fences with different signs pre-painted, which not only increases the procurement, storage, and transportation costs of construction fences, but also causes idle and wasted resources. Therefore, we are introducing a new type of construction fence for building projects. Utility Model Content
[0004] The main purpose of this utility model is to provide a construction fence for building engineering, which can effectively solve the problems in the background art.
[0005] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A construction fence for building engineering includes a fence panel, an installation plate fixedly installed at the front end of the fence panel, a warning groove opened inside the installation plate, an observation port opened at the front end of the installation plate, an entrance opening at the right end of the installation plate, a closing mechanism jointly provided at the upper right part of the installation plate and inside the entrance opening, and a fixing rod fixedly installed at both the left and right ends of the fence panel, with a counterweight mechanism fixedly installed at the lower end of each of the two fixing rods.
[0006] Preferably, the sealing mechanism includes a top block and a sealing strip. The top block has a sliding groove inside. A pull rod is movably connected to the upper end of the top block. A plug rod is fixedly connected to the lower end of the pull rod. A spring is fixedly connected to the upper end of the plug rod. A slot is opened in the middle of the right end of the sealing strip. A pull block is fixedly connected to the lower right part of the sealing strip.
[0007] Preferably, the lower end of the top block is fixedly connected to the mounting plate, the left end of the sealing strip is movably connected to the lower groove wall of the placement inlet via a movable shaft, and the sliding groove is in communication with the interior of the placement inlet.
[0008] Preferably, the upper part of the insertion rod is slidably connected to the sliding groove, the upper end of the spring is fixedly connected to the upper wall of the sliding groove, and the spring is located outside the pull rod.
[0009] By adopting the above technical solution, the spring force allows the insert rod to be inserted into the slot, enabling the sealing strip to close the entrance and preventing the warning sign from slipping and being lost.
[0010] Preferably, the lower part of the insertion rod is inserted into the slot, and the diameter of the insertion rod is smaller than the diameter of the slot.
[0011] By adopting the above technical solution, the diameter of the insertion rod is smaller than the diameter of the slot, making it easier for the insertion rod to be inserted into the slot.
[0012] Preferably, the counterweight mechanism includes a counterweight base, an anti-slip plate is fixedly installed at the lower end of the counterweight base, a water inlet is fixedly connected to the rear part of the upper end of the counterweight base, a water inlet cover is provided at the upper end of the water inlet, a drain outlet is fixedly connected to the lower part of the front end of the counterweight base, and a drain cover is threadedly connected to the outer surface of the drain outlet.
[0013] Preferably, the upper middle part of the counterweight base is fixedly connected to the fixing rod, and the counterweight base has a hollow structure, with the lower inner wall of the counterweight base having an inclined slope that is lower in the front and higher in the back.
[0014] By adopting the above technical solution, water can be injected into the counterweight to increase its weight and the overall stability of the construction fence. After use, water can be quickly drained to reduce its weight, making the construction fence easier to recycle.
[0015] Compared with the prior art, the present invention has the following beneficial effects: 1. By pulling the lever upwards, the lever moves the insert rod upwards, compressing the spring and disengaging the insert rod from the slot. Then, the sealing strip is folded downwards to open the insertion port. The warning sign is placed into the warning slot through the insertion port. The sealing strip is then folded upwards to reset, and the lever is released. Under the reset of the spring, the insert rod is inserted into the slot on the sealing strip, closing the insertion port. This allows for the replacement of warning signs. Construction units only need to stock signs with various content to meet the needs of the entire construction cycle by changing the warning signs, significantly reducing the costs of fencing procurement, storage, and transportation. Furthermore, the linkage system consisting of the lever, insert rod, and spring forms a stable locking structure. Even in the event of strong winds or minor impacts, the sealing strip will not easily open, preventing the warning signs from falling off and being lost, ensuring the long-term stability of the warning function. 2. After the construction fence is transported to the usage site, water can be added to the counterweight by opening the water inlet cover and then closing the cover. This increases the weight of the counterweight, lowers the center of gravity of the fence, and enhances its wind and impact resistance, thereby improving the stability of the construction fence. When construction is completed or the construction fence needs to be moved, the water can be drained from the drain outlet by opening the drain cover. Because the bottom of the counterweight is sloping with a lower front and higher back, the drainage efficiency can be accelerated, and the weight of the counterweight is reduced after drainage, making the construction fence easier to move. Attached Figure Description
[0016] Figure 1 This is a schematic diagram of the overall structure of a construction fence for building engineering according to this utility model; Figure 2 This is a schematic diagram of the overall structure of the installation plate of a construction fence for building engineering according to this utility model; Figure 3 This is a schematic diagram of the overall structure of the enclosure mechanism of a construction fence for building engineering according to this utility model; Figure 4 This is a schematic diagram of the overall structure of the counterweight mechanism of a construction fence for building engineering according to this utility model.
[0017] In the diagram: 1. Fence panel; 2. Mounting plate; 3. Warning groove; 4. Observation port; 5. Insertion port; 6. Closing mechanism; 61. Top block; 62. Closing strip; 63. Sliding groove; 64. Pull rod; 65. Insert rod; 66. Spring; 67. Slot; 68. Pull block; 7. Fixing rod; 8. Counterweight mechanism; 81. Counterweight seat; 82. Anti-slip plate; 83. Water inlet; 84. Water inlet cover; 85. Drain outlet; 86. Drain cover. Detailed Implementation
[0018] To make the technical means, creative features, objectives and effects of this utility model easier to understand, the present utility model will be further described below in conjunction with specific embodiments.
[0019] In the description of this utility model, it should be noted that the terms "upper," "lower," "inner," "outer," "front end," "rear end," "both ends," "one end," and "the other end," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are used only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model. In addition, the terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance.
[0020] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed," "equipped with," and "connected," etc., should be interpreted broadly. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.
[0021] Please see Figure 1-4 This utility model provides a technical solution: A construction fence for building engineering includes a fence panel 1, an installation plate 2 fixedly installed at the front end of the fence panel 1, a warning groove 3 opened inside the installation plate 2, an observation port 4 opened at the front end of the installation plate 2, an entrance 5 opened at the right end of the installation plate 2, a closing mechanism 6 is provided together at the upper right part of the installation plate 2 and inside the entrance 5, and a fixing rod 7 is fixedly installed at the left and right ends of the fence panel 1, and a counterweight mechanism 8 is fixedly installed at the lower end of the two fixing rods 7.
[0022] In this embodiment, the sealing mechanism 6 includes a top block 61 and a sealing strip 62. The top block 61 has a sliding groove 63 inside. A pull rod 64 is movably connected to the upper end of the top block 61. A plug rod 65 is fixedly connected to the lower end of the pull rod 64. A spring 66 is fixedly connected to the upper end of the plug rod 65. A slot 67 is opened in the middle of the right end of the sealing strip 62. A pull block 68 is fixedly connected to the lower right end of the sealing strip 62. The lower end of the top block 61 is fixedly connected to the mounting plate 2. The left end of the sealing strip 62 is movably connected to the lower groove wall of the inlet 5 through a movable shaft. The sliding groove 63 communicates with the inside of the inlet 5. The upper part of the plug rod 65 is slidably connected to the sliding groove 63. The upper end of the spring 66 is fixedly connected to the upper groove wall of the sliding groove 63, and the spring 66 is located outside the pull rod 64. The lower part of the plug rod 65 is inserted into the slot 67, and the diameter of the plug rod 65 is smaller than the diameter of the slot 67.
[0023] The above method involves pulling the lever 64 upwards, causing the insert rod 65 to move upwards, compressing the spring 66, and disengaging the insert rod 65 from the slot 67. Then, the sealing strip 62 is folded downwards to open the insertion port 5, allowing the warning sign to be placed into the warning slot 3 through the insertion port 5. The sealing strip 62 is then folded upwards to reset, and the lever 64 is released. Under the reset of the spring 66, the insert rod 65 is inserted into the slot 67 on the sealing strip 62, closing the insertion port 5. This allows the warning sign to be replaced.
[0024] In this embodiment, the counterweight mechanism 8 includes a counterweight base 81, an anti-slip plate 82 fixedly installed at the lower end of the counterweight base 81, a water inlet 83 fixedly connected to the rear upper end of the counterweight base 81, a water inlet cover 84 provided at the upper end of the water inlet 83, a drain outlet 85 fixedly connected to the lower front end of the counterweight base 81, a drain cover 86 threadedly connected to the outer surface of the drain outlet 85, a fixed connection between the middle upper end of the counterweight base 81 and the fixing rod 7, and the counterweight base 81 is a hollow structure, with the lower inner wall of the counterweight base 81 having an inclined slope that is lower in the front and higher in the back.
[0025] The above solution involves opening the water inlet cover 84, adding water into the counterweight seat 81 through the water inlet 83, and then closing the water inlet cover 84. This increases the weight of the counterweight seat 81, lowers the center of gravity of the fence, enhances its wind and impact resistance, and improves the stability of the construction fence. When construction is completed or the construction fence needs to be moved, the water can be drained from the drain outlet 85 by opening the drain cover 86. Since the bottom of the counterweight seat 81 has a sloping design that is lower in the front and higher in the back, the drainage efficiency can be accelerated, and the weight of the counterweight seat 81 is reduced after drainage, making the construction fence easier to move.
[0026] It should be noted that this utility model is a construction fence for building engineering. During use, after the construction fence is transported to the location, the operator can open the water inlet cover 84 and inject water into the counterweight base 81 through the water inlet 83. After the water is injected, the water inlet cover 84 is closed. This method increases the weight of the counterweight base 81, lowers the center of gravity of the fence, and thus enhances its wind and impact resistance, improving the stability of the construction fence. When construction is completed or the construction fence needs to be moved, the operator can open the drain cover 86. At this time, the water in the counterweight base 81 will be discharged from the drain outlet 85. Because the bottom of the counterweight base 81 is designed with a slope that is lower in the front and higher in the back, this structure helps to speed up the drainage. After drainage, the weight of the counterweight base 81 is reduced, making the construction fence easier to move. When it is necessary to change the warning sign, the operator pulls the lever 64 upwards. The lever 64 will drive the insert rod 65 to move upwards simultaneously. During this process, the spring 66 is subjected to Upon compression, the insertion rod 65 disengages from the slot 67. Next, the sealing strip 62 is folded downwards to open the insertion port 5. The old warning sign is then removed, and the new warning sign is placed into the warning slot 3 through the insertion port 5. Afterwards, the sealing strip 62 is folded upwards to reset, and the pull rod 64 is released. Under the reset action of the spring 66, the insertion rod 65 inserts into the slot 67 on the sealing strip 62, thus closing the insertion port 5 and completing the replacement of the warning sign. Using this method, construction units only need to stock various signs with different content to meet the needs of the entire construction cycle by changing the warning signs, significantly reducing the procurement, storage, and transportation costs of the fence. Furthermore, the linkage system consisting of the pull rod 64, the insertion rod 65, and the spring 66 forms a stable locking structure. Even in the event of strong winds or minor collisions, the sealing strip 62 will not easily open, preventing the warning sign from falling off or being lost, ensuring the warning function can operate stably and effectively for a long time.
[0027] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely illustrative of the principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claims. The scope of protection of this utility model is defined by the appended claims and their equivalents.
Claims
1. A construction fence for building projects, comprising fence panels (1), characterized in that: The front end of the fence panel (1) is fixedly installed with an installation plate (2), the inside of the installation plate (2) is provided with a warning groove (3), the front end of the installation plate (2) is provided with an observation port (4), the right end of the installation plate (2) is provided with an inlet (5), the upper right part of the installation plate (2) and the inside of the inlet (5) are jointly provided with a closing mechanism (6), the left and right ends of the fence panel (1) are both fixedly installed with fixing rods (7), and the lower ends of the two fixing rods (7) are both fixedly installed with counterweight mechanisms (8); The closing mechanism (6) includes a top block (61) and a closing strip (62). The top block (61) has a sliding groove (63) inside. A pull rod (64) is movably connected to the upper end of the top block (61). A plug rod (65) is fixedly connected to the lower end of the pull rod (64). A spring (66) is fixedly connected to the upper end of the plug rod (65). A slot (67) is opened in the middle of the right end of the closing strip (62). A pull block (68) is fixedly connected to the lower right end of the closing strip (62).
2. The construction fence for building engineering according to claim 1, characterized in that: The lower end of the top block (61) is fixedly connected to the mounting plate (2), the left end of the sealing strip (62) is movably connected to the lower groove wall of the inlet (5) through a movable shaft, and the sliding groove (63) is connected to the inside of the inlet (5).
3. A construction fence for building engineering according to claim 1, characterized in that: The upper part of the insert rod (65) is slidably connected to the sliding groove (63), the upper end of the spring (66) is fixedly connected to the upper wall of the sliding groove (63), and the spring (66) is located outside the pull rod (64).
4. A construction fence for building engineering according to claim 1, characterized in that: The lower part of the insert (65) is inserted into the slot (67), and the diameter of the insert (65) is smaller than the diameter of the slot (67).
5. A construction fence for building engineering according to claim 1, characterized in that: The counterweight mechanism (8) includes a counterweight base (81), an anti-slip plate (82) is fixedly installed at the lower end of the counterweight base (81), a water inlet (83) is fixedly connected to the rear part of the upper end of the counterweight base (81), a water inlet cover (84) is provided at the upper end of the water inlet (83), a drain outlet (85) is fixedly connected to the lower part of the front end of the counterweight base (81), and a drain cover (86) is threadedly connected to the outer surface of the drain outlet (85).
6. A construction fence for building engineering according to claim 5, characterized in that: The upper middle part of the counterweight seat (81) is fixedly connected to the fixing rod (7), and the counterweight seat (81) is a hollow structure. The lower inner wall of the counterweight seat (81) has an inclined slope that is lower in the front and higher in the back.