A structure for adjusting the elevation of a cast-in-situ temporary support of a bridge

CN224692557UActive Publication Date: 2026-08-28CHINA RAILWAY MODERN SURVEY & DESIGN INST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522082312.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-28
Publication Date
2026-08-28
Estimated Expiration
2035-09-28

AI Technical Summary

Technical Problem

[0004]本实用新型的目的在于提供一种用于桥梁现浇临时支架调节标高的结构,以解决上述背景技术中提出现有的方法操作复杂且不变的问题

Benefits of technology

本实用新型中,桥梁现浇临时支架调节标高的结构,使用钢板和丝杆托板的组合,可实现支架标高的快速调节,大大缩短施工周期,减少人力投入,提高施工效率,结构可回收周转利用,减少一次性投入,可降低施工成本,,同时节省了大量异形钢板和异形木块,降低了材料的消耗,有益于保护环境,具有较大推广价值,社会效益良好,为桥梁现浇施工标高调节提供了便利。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224692557U_ABST
    Figure CN224692557U_ABST
Patent Text Reader

Abstract

The utility model relates to bridge pouring equipment technical field, concretely for a kind of structure for bridge cast-in-place temporary support elevation adjustment, including I-beam, the outer wall of I-beam and the inner bottom wall of supporting assembly movable abut, the inner wall of supporting assembly and the outer wall of anchoring assembly rotationally connected, the outer wall of anchoring assembly near bottom end and the inner wall of Bailey beam assembly are threadedly connected, bridge cast-in-place temporary support elevation adjustment structure, the combination of using steel sheet and screw rod supporting plate, the quick adjustment of support elevation can be realized, greatly shorten construction cycle, reduce manpower investment, improve construction efficiency, structure recyclable turnover utilization, reduce disposable investment, can reduce construction cost, save a large amount of special-shaped steel sheet and special-shaped wood block simultaneously, reduce the consumption of material, it is beneficial to protect environment, with greater popularization value, social benefit is good, provide convenience for bridge cast-in-place construction elevation adjustment.
Need to check novelty before this filing date? Find Prior Art