3PE anti-corrosion equipment

CN224702581UActive Publication Date: 2026-09-01SHENZHEN YINXIU TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202521933184.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-09
Publication Date
2026-09-01
Estimated Expiration
2035-09-09

AI Technical Summary

Technical Problem

在生产线上依次布设两套挤出机构,两套挤出机构在工件输送方向上间隔排布,占用的空间大;两套挤出机构先后作业,喷涂的胶粘剂先接触工件表面,并通过压轮压紧,由于胶粘剂容易粘接在压轮上,需要定期对压轮进行清理,费时费力,且易影响缠绕质量;此外,挤出机构配套的压轮一般仅能够起到支撑作用,无法提供工件前进的动力,因此,需要依靠两套挤出机构的前后布置的两组输送轮输送工件,两套挤出机构的体积大,中间跨度大,使得两组输送轮之间的距离大,仅能够对较长的工件进行防腐作业,而一般的工件长度无法满足需求,需要将多个工件焊接起来,防腐作业完成后再切断,工序繁琐,费时费力,成本高

Benefits of technology

综上所述,本实施例提供的3PE防腐设备,由于将第一挤出机构的第一出料口和第二挤出机构的第二出料口设置为在预设平面内至少部分重叠,而预设平面与竖向方向垂直,也即,从上往下或者从下往上观察第一挤出机构和第二挤出机构,第一出料口和第二出料口至少部分重叠,减小了第一挤出机构和第二挤出机构在工件输送方向上的长度,缩短了二者前后跨度,能够满足长度较小的工件的防腐作业,无需将多根工件焊接在一起,也省去了防腐完成后切断多根工件的工序,省事省力,效率高,成本低。同时,第一出料口和第二出料口竖向上重叠,第一挤出机构和第二挤出机构可以同时启动,第一挤出机构挤出的粘接树脂薄膜接触工件后,第二挤出机构挤出的聚乙烯薄膜接触粘接树脂薄膜,此时,压轮与外层的聚乙烯薄膜接触,降低了压轮与粘接树脂薄膜接触的概率,降低了压轮粘胶风险,也减小了清理压轮上的胶粘层的劳动强度。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224702581U_ABST
    Figure CN224702581U_ABST
Patent Text Reader

Abstract

A 3PE anti-corrosion device, relating to the field of anti-corrosion technology, includes a conveying mechanism, a medium-frequency heating mechanism, a winding chamber, a first extrusion mechanism, a second extrusion mechanism, and a cooling mechanism. The conveying mechanism carries the workpiece and sequentially conveys it to the medium-frequency heating mechanism and the cooling mechanism. The medium-frequency heating mechanism heats the workpiece. The winding chamber is located between the medium-frequency heating mechanism and the cooling mechanism, through which the workpiece passes. The first discharge port of the first extrusion mechanism and the second discharge port of the second extrusion mechanism are both connected to the winding chamber. The orthographic projections of the first discharge port and the second discharge port in a preset plane at least partially overlap, and the preset plane is perpendicular to the vertical direction. The first extrusion mechanism extrudes adhesive resin onto the workpiece surface, and the second extrusion mechanism extrudes polyethylene onto the adhesive resin surface. The cooling mechanism receives the workpiece exiting the winding chamber and cools it. The device has a compact structure, small span, and can process workpieces of relatively short length.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of corrosion protection technology, and more specifically, to a 3PE corrosion protection device. Background Technology Currently, anti-corrosion steel pipes are widely used in critical applications, particularly in petroleum, chemical, natural gas, thermal energy, water conservancy, roads, bridges, and other water engineering fields. By coating the outer surface of the steel pipe with a three-layer composite anti-corrosion layer consisting of epoxy powder, adhesive, and polyethylene, resistance to chemical corrosion, cathodic disbondment, and mechanical damage is effectively improved, resulting in a wide range of applications. In existing technology, epoxy powder is first sprayed onto the outer surface of the steel pipe using a powder coating machine within a spray chamber. Then, an adhesive is extruded and adhered to the outside of the steel pipe using an extrusion machine. Finally, polyethylene is extruded and adhered to the adhesive layer using another extrusion machine. During the anti-corrosion process, the steel pipe relies on the rotation of a conveyor wheel for forward movement and rotation.

[0002] The inventors discovered through research that existing steel pipe corrosion protection equipment has at least the following drawbacks: Two extrusion mechanisms are sequentially arranged on the production line, spaced apart in the workpiece conveying direction, occupying a large space. The two extrusion mechanisms operate sequentially, with the sprayed adhesive first contacting the workpiece surface and being pressed by pressure rollers. Because the adhesive easily adheres to the pressure rollers, they need to be cleaned regularly, which is time-consuming, labor-intensive, and can affect the winding quality. In addition, the pressure rollers of the extrusion mechanism generally only provide support and cannot provide the power for the workpiece to move forward. Therefore, two sets of conveyor wheels arranged in front and behind the two extrusion mechanisms are needed to transport the workpiece. The two extrusion mechanisms are large in size and have a large span in the middle, resulting in a large distance between the two sets of conveyor wheels. This allows for anti-corrosion work only on longer workpieces, while the length of ordinary workpieces cannot meet the requirements. Multiple workpieces need to be welded together, and then cut after the anti-corrosion work is completed. This process is cumbersome, time-consuming, labor-intensive, and costly. Utility Model Content

[0003] The purpose of this utility model includes, for example, providing a 3PE anti-corrosion device that can improve structural compactness, perform anti-corrosion operations on short workpieces, save processes, reduce costs, and make it easy to clean the pressure rollers in the winding chamber as they are less prone to adhesive adhesion.

[0004] The embodiments of this utility model can be implemented as follows: In a first aspect, this utility model provides a 3PE anti-corrosion device, comprising: The system includes a conveying mechanism, a medium-frequency heating mechanism, a winding chamber, a first extrusion mechanism, a second extrusion mechanism, and a cooling mechanism. The conveying mechanism is used to carry the workpiece and can sequentially convey the workpiece to the medium-frequency heating mechanism and the cooling mechanism. The medium-frequency heating mechanism is used to heat the workpiece. The winding chamber is disposed between the medium-frequency heating mechanism and the cooling mechanism, and the workpiece passes through the winding chamber; the first discharge port of the first extrusion mechanism and the second discharge port of the second extrusion mechanism are both connected to the winding chamber, and the orthographic projections of the first discharge port and the second discharge port in a preset plane at least partially overlap, and the preset plane is perpendicular to the vertical direction; the first extrusion mechanism is used to extrude adhesive resin to the surface of the workpiece, and the second extrusion mechanism is used to extrude polyethylene to the surface of the adhesive resin; The cooling mechanism is used to receive and cool the workpieces exiting the winding chamber.

[0005] In an optional embodiment, the conveying mechanism includes a support and multiple sets of conveying wheels. The multiple sets of conveying wheels are all mounted on the support and arranged at intervals along a preset direction. Each set of conveying wheels includes two conveying rollers. Each conveying roller is rotatably connected to the support. The rotation axes of the two conveying rollers in the same set are set at an angle. Furthermore, the axis of each conveying roller is not perpendicular to the preset direction.

[0006] In an optional embodiment, the first extrusion mechanism includes a first moving platform and a first extrusion die, the first moving platform being mounted on the side of the winding chamber; the first discharge port is disposed on the first extrusion die, the first extrusion die being connected to the first moving platform, and the first moving platform being used to drive the first extrusion die to move relative to the winding chamber, so as to adjust the position of the first discharge port relative to the workpiece.

[0007] In an optional embodiment, the first moving platform is configured as a two-dimensional moving platform, the first extrusion die is mounted on the two-dimensional moving platform, and the two-dimensional moving platform is used to drive the first extrusion die to move relative to the winding chamber in a first direction and a second direction that are perpendicular to each other, the second direction being consistent with the conveying direction of the conveying mechanism.

[0008] In an optional embodiment, the two-dimensional mobile platform includes a first linear telescopic member, a first mounting member, a second linear telescopic member, and a second mounting member. The telescopic end of the first linear telescopic member is connected to the first mounting member and is used to drive the first mounting member to slide back and forth along a first direction. The second linear telescopic member is connected to the first mounting member, and the second mounting member is slidably connected to the first mounting member and connected to the telescopic end of the first linear telescopic member. The second linear telescopic member is used to drive the second mounting member to slide back and forth in a second direction. The first extrusion die is connected to the second mounting component.

[0009] In an optional embodiment, the second extrusion mechanism includes a second moving platform and a second extrusion die, the second moving platform being mounted on the side of the winding chamber; the second discharge port is disposed on the second extrusion die, the second extrusion die being connected to the second moving platform, and the second moving platform being used to drive the second extrusion die to move relative to the winding chamber, so as to adjust the position of the second discharge port relative to the workpiece; The orthographic projections of the first extrusion die and the second extrusion die in the preset plane at least partially overlap; the first moving platform and the second moving platform are arranged in the second direction.

[0010] In an optional embodiment, the 3PE anti-corrosion equipment further includes two intermediate conveyor wheels, which are installed between the medium-frequency heating mechanism and the winding chamber. The two intermediate conveyor wheels cooperate to carry and convey the workpiece.

[0011] In an optional embodiment, the 3PE anti-corrosion equipment further includes a powder spraying chamber, which is disposed between the medium-frequency heating mechanism and the winding chamber.

[0012] In an optional embodiment, the winding chamber is provided with a lifter and a pressure roller. The telescopic end of the lifter is connected to the pressure roller. The lifter is used to drive the pressure roller closer to or away from the workpiece. The pressure roller is used to carry the workpiece and can rotate under the drive of the workpiece to press the adhesive resin and polyethylene onto the surface of the workpiece.

[0013] In an optional embodiment, the cooling mechanism includes a spray pipe assembly for spraying coolant onto the workpiece.

[0014] The beneficial effects of this utility model embodiment include, for example: In summary, the 3PE anti-corrosion equipment provided in this embodiment, by setting the first discharge port of the first extrusion mechanism and the second discharge port of the second extrusion mechanism to at least partially overlap within a preset plane, and the preset plane being perpendicular to the vertical direction, means that when viewed from top to bottom or bottom to top, the first discharge port and the second discharge port at least partially overlap. This reduces the length of the first and second extrusion mechanisms in the workpiece conveying direction and shortens their front-to-back span, thus meeting the anti-corrosion requirements for workpieces with shorter lengths. It eliminates the need to weld multiple workpieces together and avoids the step of cutting multiple workpieces after anti-corrosion, saving time and effort, increasing efficiency, and reducing costs. Simultaneously, the vertical overlap of the first and second discharge ports allows the first and second extrusion mechanisms to start simultaneously. After the adhesive resin film extruded by the first extrusion mechanism contacts the workpiece, the polyethylene film extruded by the second extrusion mechanism contacts the adhesive resin film. At this time, the pressure roller contacts the outer polyethylene film, reducing the probability of the pressure roller contacting the adhesive resin film, lowering the risk of adhesive residue on the pressure roller, and reducing the labor intensity of cleaning the adhesive layer on the pressure roller. Attached Figure Description

[0015] To more clearly illustrate the technical solutions of the embodiments of this utility model, the drawings used in the embodiments will be briefly introduced below. It should be understood that the following drawings only show some embodiments of this utility model and should not be regarded as a limitation on the scope. For those skilled in the art, other related drawings can be obtained based on these drawings without creative effort.

[0016] Figure 1 This is a schematic diagram from a first-view perspective of the 3PE anti-corrosion equipment in this embodiment; Figure 2 This is a schematic diagram from a second perspective of the 3PE anti-corrosion equipment in this embodiment; Figure 3 This is a partial schematic diagram of the 3PE anti-corrosion equipment in this embodiment; Figure 4 This is a schematic diagram from a third-person perspective of the 3PE anti-corrosion equipment in this embodiment.

[0017] icon: 001-First direction; 002-Second direction; 003-Workpiece; 100-First conveying mechanism; 110-Bracket; 120-Conveying wheel set; 121-Conveying roller; 200-Medium frequency heating mechanism; 300-Winding chamber; 310-Pressure roller; 320-Lifter; 400-First extrusion mechanism; 410-First moving platform; 411-First linear telescoping device; 412-First mounting component; 413-Second linear telescoping device; 414-Second mounting component; 415-First guide rail; 420-First extrusion die; 421-First discharge port; 500-Second extrusion mechanism; 510-Second moving platform; 511-Third linear telescoping device; 512-Third mounting component; 513-Second guide rail; 520-Second extrusion die; 521-Second discharge port; 600-Cooling mechanism; 700-Powder spraying mechanism; 800-Second conveying mechanism; 900-Intermediate conveying wheel. Detailed Implementation

[0018] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. The components of the embodiments of this utility model described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.

[0019] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.

[0020] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.

[0021] In the description of this utility model, it should be noted that if terms such as "upper," "lower," "inner," or "outer" are used to indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, or the orientation or positional relationship in which the product is usually placed during use, they are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model.

[0022] Furthermore, the terms "first" and "second" are used only to distinguish descriptions and should not be interpreted as indicating or implying relative importance.

[0023] It should be noted that, where there is no conflict, the features in the embodiments of this utility model can be combined with each other.

[0024] Please refer to Figures 1-4 This embodiment provides a 3PE anti-corrosion device, including: The system includes a conveying mechanism, a medium-frequency heating mechanism 200, a winding chamber 300, a first extrusion mechanism 400, a second extrusion mechanism 500, and a cooling mechanism 600. The conveying mechanism is used to carry the workpiece 003 and can sequentially convey the workpiece 003 to the medium frequency heating mechanism 200 and the cooling mechanism 600. The medium frequency heating mechanism 200 is used to heat the workpiece 003. The winding chamber 300 is disposed between the medium-frequency heating mechanism 200 and the cooling mechanism 600, and the workpiece 003 passes through the winding chamber 300; the first discharge port 421 of the first extrusion mechanism 400 and the second discharge port 521 of the second extrusion mechanism 500 are both connected to the winding chamber 300, and the orthographic projections of the first discharge port 421 and the second discharge port 521 in a preset plane at least partially overlap, and the preset plane is perpendicular to the vertical direction; the first extrusion mechanism 400 is used to extrude adhesive resin to the surface of the workpiece 003, and the second extrusion mechanism 500 is used to extrude polyethylene to the surface of the adhesive resin; The cooling mechanism 600 is used to receive the workpiece 003 coming out of the winding chamber 300 and to cool the workpiece 003.

[0025] As described above, the working principle of the 3PE anti-corrosion equipment provided in this embodiment is as follows: This equipment is mainly used for corrosion protection of hollow steel pipes. The workpiece 003 is placed on a conveying mechanism, which drives the workpiece 003 to rotate while sliding along a preset direction. During the sliding process, the workpiece 003 first passes through a medium-frequency heating mechanism 200, which heats it to a set temperature. Then, the workpiece 003 undergoes epoxy base powder spraying through a powder spraying mechanism 700, and then enters the winding chamber 300. The first extrusion mechanism 400 and the second extrusion mechanism 500 operate simultaneously. The first extrusion mechanism 400 extrudes an adhesive resin film and attaches it to the epoxy coating surface of the workpiece 003. The second extrusion mechanism 500 extrudes a polyethylene film and adheres it to the outside of the adhesive resin film. As the workpiece 003 rotates, both the adhesive resin film and the polyethylene film can wrap around the outer circumference of the workpiece 003, achieving winding. Then, as the workpiece 003 continues to move forward, the entire outer circumference of the workpiece 003 can be wound. The part of the workpiece 003 that has been wound leaves the winding chamber 300 in time and enters the station of the cooling mechanism 600. The cooling mechanism 600 cools the workpiece 003, so that the outer polyethylene film surface cools down and crystallizes rapidly. This can achieve the best state of vertical overlap with the polyethylene film extruded from the second discharge port 521, and can also prevent the anti-corrosion coating from being crushed during roller conveying.

[0026] Since the first discharge port 421 of the first extrusion mechanism 400 and the second discharge port 521 of the second extrusion mechanism 500 overlap at least partially in the vertical direction, the length of the first extrusion mechanism 400 and the second extrusion mechanism 500 in the conveying direction of the workpiece 003 is reduced, and the front-to-back span between them is shortened. This can meet the anti-corrosion operation of workpieces 003 with smaller lengths, eliminating the need to weld multiple workpieces 003 together and saving the process of cutting multiple workpieces 003 after anti-corrosion. This saves time and effort, is highly efficient, and has low cost. At the same time, since the first discharge port 421 and the second discharge port 521 overlap vertically, the first extrusion mechanism 400 and the second extrusion mechanism 500 can be started simultaneously. After the adhesive resin film extruded by the first extrusion mechanism 400 contacts the workpiece 003, the polyethylene film extruded by the second extrusion mechanism 500 contacts the adhesive resin film. At this time, the pressure roller 310 contacts the outer polyethylene film, reducing the probability of the pressure roller 310 contacting the adhesive resin film, reducing the risk of the pressure roller 310 sticking to the adhesive, and also reducing the labor intensity of cleaning the adhesive layer on the pressure roller 310.

[0027] The following embodiments illustrate the details of the 3PE anti-corrosion equipment of this application by way of example.

[0028] Please refer to Figures 1-4In this embodiment, optionally, the 3PE anti-corrosion equipment includes a first conveying mechanism 100, a medium-frequency heating mechanism 200, a winding chamber 300, a first extrusion mechanism 400, a second extrusion mechanism 500, a cooling mechanism 600, a powder spraying mechanism 700, and a second conveying mechanism 800. The first conveying mechanism 100, the medium-frequency heating mechanism 200, the powder spraying mechanism 700, the winding chamber 300, and the second conveying mechanism 800 are arranged sequentially along a preset direction. The workpiece 003, such as a steel pipe, can pass sequentially through the medium-frequency heating mechanism 200, the powder spraying mechanism 700, and the winding chamber 300 along the preset direction with the cooperation of the first conveying mechanism 100 and the second conveying mechanism 800. The medium-frequency heating mechanism 200 is used to heat the workpiece 003, the powder spraying mechanism 700 is used to spray epoxy powder onto the workpiece 003, and the winding chamber 300 provides a winding area for the workpiece 003. The first extrusion mechanism 400 and the second extrusion mechanism 500 are both located on the same side of the winding chamber 300. The first extrusion mechanism 400 is used to extrude a thin film of adhesive resin, and the second extrusion mechanism 500 is used to extrude a thin film of polyethylene. The adhesive resin film first contacts the surface of the workpiece 003, and the polyethylene film adheres to the outside of the adhesive resin film. The adhesive resin film is used to fix the workpiece 003, and the adhesive resin film does not easily come into direct contact with the pressure roller 310 inside the winding chamber 300. The cooling mechanism 600 can cool down the workpiece 003 after winding.

[0029] In actual operation, the first conveying mechanism 100 conveys the workpiece 003 to the medium frequency heating mechanism 200, the powder spraying mechanism 700 and the winding chamber 300. As the workpiece 003 moves in the preset direction, the head end of the workpiece 003 enters the second conveying mechanism 800 and the tail end of the workpiece 003 leaves the first conveying mechanism 100. At this time, the second conveying mechanism 800 realizes the conveying of the workpiece 003, so that the workpiece 003 leaves the winding chamber 300.

[0030] Optionally, the structure and working principle of the first conveying mechanism 100 and the second conveying mechanism 800 can be set to be the same, and both can refer to the structure of the conveying steel pipe in the prior art. In this embodiment, in order to avoid repetition and redundancy, the structure of the first conveying mechanism 100 is used as an example for simple explanation. For example, the first conveying mechanism 100 includes a support 110 and multiple sets of conveying wheel groups 120. The multiple sets of conveying wheel groups 120 are all mounted on the support 110 and arranged at intervals along a preset direction. Each set of conveying wheel groups 120 includes two conveying rollers 121. Each conveying roller 121 is rotatably connected to the support 110. The rotation axes of the two conveying rollers 121 in the same set are set at an angle; and the axis of each conveying roller 121 is not perpendicular to the preset direction. The steel pipe is placed on the multiple sets of conveying wheel groups 120 and supported and limited by the paired two conveying rollers 121. The axis of the steel pipe is basically consistent with the preset direction. By adjusting the rotation speed and / or tilt angle of the conveying rollers 121, the conveying speed of the workpiece 003 and the rotation speed of the workpiece 003 can be adjusted. The first conveying mechanism 100 and the second conveying mechanism 800 can be adjusted independently without affecting each other. Under normal circumstances, the working parameters of the first conveying mechanism 100 and the second conveying mechanism 800 are kept consistent to ensure that the steel pipe can move at a uniform speed.

[0031] In addition, the support 110 of the first conveying mechanism 100 and the second conveying mechanism 800 can be configured as an integral structure.

[0032] In this embodiment, the intermediate frequency heating mechanism 200 can optionally refer to existing known structures and can be purchased directly; no specific limitations are imposed in this embodiment.

[0033] In this embodiment, optionally, the powder spraying mechanism 700 can refer to existing known structures and can be purchased directly; no specific limitation is made in this embodiment.

[0034] In this embodiment, optionally, in order to improve stability, two pairs of intermediate conveyor wheels 900 can be set between the intermediate frequency heating mechanism 200 and the powder spraying mechanism 700. After the workpiece 003 passes through the intermediate frequency heating mechanism 200, it can be carried by the intermediate conveyor wheels 900, which can provide forward power for the workpiece 003.

[0035] It should be noted that the dimensional and operational parameters of the intermediate conveyor wheel 900 can be consistent with those of the conveyor wheel group 120 of the first conveyor mechanism 100.

[0036] Please combine Figure 2 Furthermore, the front-to-back span of the first extrusion mechanism 400 and the second extrusion mechanism 500 can be understood as the distance L between the intermediate conveyor wheel 900 and the conveyor wheel of the second conveyor mechanism 800 closest to the winding chamber 300.

[0037] In this embodiment, optionally, a first window and a second window are provided on one side of the winding chamber 300. A pressure roller 310 is installed inside the winding chamber 300. The pressure roller 310 can support the workpiece 003 and rotate under the drive of the workpiece 003. Due to the gravity of the workpiece 003 acting on the pressure roller 310, the adhesive resin film and polyethylene film attached to the surface of the workpiece 003 can be pressed tightly onto the surface of the workpiece 003 during the rotation of the workpiece 003, thereby achieving anti-corrosion winding.

[0038] In this embodiment, optionally, the first extrusion mechanism 400 includes a first moving platform 410 and a first extrusion die 420. The first moving platform 410 is mounted on the side of the winding chamber 300. A first discharge port 421 is disposed on the first extrusion die 420. The first extrusion die 420 is connected to the first moving platform 410. The first moving platform 410 is used to drive the first extrusion die 420 to move relative to the winding chamber 300, so as to adjust the position of the first discharge port 421 relative to the workpiece 003. For example, the first moving platform 410 can be configured as a two-dimensional moving platform. The first extrusion die 420 is mounted on the two-dimensional moving platform. The two-dimensional moving platform is used to drive the first extrusion die 420 to move relative to the winding chamber 300 in a mutually perpendicular first direction 001 and a second direction 002. The plane formed by the straight lines of the first direction 001 and the second direction 002 is a horizontal plane. The second direction 002 is consistent with the conveying direction of the conveying mechanism, that is, the preset direction and the second direction 002 are parallel.

[0039] Specifically, the two-dimensional mobile platform can directly adopt existing structures and can be directly procured, reducing processing and manufacturing costs. In this embodiment, for ease of understanding, a structure of a two-dimensional mobile platform is shown. For example, the two-dimensional mobile platform includes a first linear telescoping device 411, a first mounting member 412, a second linear telescoping device 413, and a second mounting member 414. The telescoping end of the first linear telescoping device 411 is connected to the first mounting member 412, used to drive the first mounting member 412 to reciprocate along a first direction 001; the second linear telescoping device 413 is connected to the first mounting member 412, and the second mounting member 414 is slidably connected to the first mounting member 412 and connected to the telescoping end of the first linear telescoping device 411. The second linear telescoping device 413 is used to drive the second mounting member 414 to reciprocate along a second direction 002; a first extrusion die 420 is connected to the second mounting member 414. The first linear telescoping device 411 and / or the second linear telescoping device 413 can be configured as a cylinder, hydraulic cylinder, or electric push rod, etc. To improve the sliding stability of the first mounting component 412, a first guide rail 415 can be configured on the first mounting component 412, allowing the first mounting component 412 to travel on the first guide rail 415 via pulleys. The first guide rail 415 can be fixed to the ground or other structural components to provide support.

[0040] It is worth noting that when the first linear expansion joint 411 is activated, it can move the first extrusion die 420 closer to or further away from the winding chamber 300, thereby adjusting the distance between the first discharge port 421 and the workpiece 003. This allows it to adapt to winding operations of workpieces 003 of different sizes. When the second linear expansion joint 413 is activated, it can move the first extrusion die 420 back and forth along the conveying direction of the workpiece 003, so as to achieve the optimal vertical overlap of the polyethylene film extruded from the second discharge port 521.

[0041] In this embodiment, optionally, the second extrusion mechanism 500 includes a second moving platform 510 and a second extrusion die 520. The second moving platform 510 is mounted on the side of the winding chamber 300. A second discharge port 521 is disposed on the second extrusion die 520. The second extrusion die 520 is connected to the second moving platform 510. The second moving platform 510 is used to drive the second extrusion die 520 to move relative to the winding chamber 300, thereby adjusting the position of the second discharge port 521 relative to the workpiece 003. Specifically, the second moving platform 510 can drive the second extrusion die 520 to reciprocate along the first direction 001, thereby adjusting the distance between the second discharge port 521 and the workpiece 003.

[0042] Optionally, the second mobile platform 510 can be purchased directly to reduce costs. In this embodiment, for ease of understanding, the basic structure of the second mobile platform 510 is illustrated by example. The second mobile platform 510 may include a third linear telescopic device 511, a third mounting component 512, and a second guide rail 513. The telescopic end of the third linear telescopic device 511 is connected to the third mounting component 512. The third mounting component 512 is equipped with pulleys that can travel on the second guide rail 513. The second guide rail 513 can be fixed to the ground or other structural components to provide support.

[0043] It should be noted that after the first extrusion mechanism 400 and the second extrusion mechanism 500 are installed, the first extrusion die 420 extends into the winding chamber 300 from the first window, and the second extrusion die 520 extends into the winding chamber 300 from the second window. The orthographic projections of the second extrusion die 520 in the preset plane at least partially overlap; the first moving platform 410 and the second moving platform 510 are arranged in the second direction 002. Please refer to... Figure 1 and Figure 4The first moving platform 410 is located to the right of the second moving platform 510, and the first extrusion die 420 is located above the second extrusion die 520. The workpiece 003 is conveyed from right to left. From the perspective of the conveying direction of the workpiece 003, the workpiece 003 rotates clockwise. Therefore, when the first extrusion die 420 and the second extrusion die 520 are working, the adhesive resin film extruded by the first extrusion die 420 first contacts the surface of the workpiece 003. As the workpiece 003 rotates, the polyethylene film extruded by the second extrusion die 520 covers the adhesive resin film and contacts the pressure roller 310. Under the action of the pressure roller 310 and the gravity of the workpiece 003, the adhesive resin film and the polyethylene film are pressed together.

[0044] It should be understood that in some embodiments, the winding chamber 300 is also equipped with a lifter 320 and a pressure sensor. The telescopic end of the lifter 320 is connected to the pressure roller 310, which can rotate relative to the telescopic end. The pressure sensor can be mounted on the pressure roller 310. For example, the lifter 320 can be a cylinder or a hydraulic cylinder. During operation, the lifter 320 can adjust the height of the pressure roller 310, thereby adjusting the supporting force of the pressure roller 310 on the workpiece. This supporting force can be obtained through the pressure sensor. By adjusting the lifting force between the pressure roller 310 and the workpiece 003, the pressure roller 310 is prevented from lifting the workpiece 003.

[0045] In this embodiment, optionally, the cooling mechanism 600 includes a spray pipe assembly for spraying coolant onto the surface of the workpiece 003. Since the workpiece 003 and the polyethylene film and adhesive resin film wrapped around its surface are at high temperatures after winding, cooling is required. After the workpiece 003 leaves the winding chamber 300, the cooling mechanism 600 operates, spraying coolant onto the outermost polyethylene film surface, causing the polyethylene film surface to cool and crystallize rapidly, forming a protective layer like an eggshell around the soft egg white and yolk, preventing the anti-corrosion coating from being crushed during roller conveying.

[0046] It should be understood that the cooling mechanism 600 can refer to existing known structures, which can deliver coolant to the pipeline by a water pump and spray the coolant from the nozzle connected to the pipeline onto the surface of the workpiece 003.

[0047] The 3PE anti-corrosion equipment provided in this embodiment, due to the at least partial overlap of the first extrusion die 420 and the second extrusion die 520, and the fact that the first extrusion mechanism 400 and the second extrusion mechanism 500 are respectively set in an L-shaped left and right corner state, the width of the first extrusion mechanism 400 and the second extrusion mechanism 500 will not affect the width of the winding station. In addition, the reduction of one set of die operation stations greatly saves space. Therefore, the spraying area plus the die winding area can be controlled within 2.5 meters. Thus, the new 3PE anti-corrosion production line is fully capable of directly producing all standard lengths (6 meters, 9 meters, 12 meters) of 3PE anti-corrosion steel pipes in the industry. It not only reduces the work of spraying release agent but also reduces costs. Furthermore, by utilizing the design that the first extrusion mechanism 400 can move in the first direction 001 and the second direction 002, the overlapping gaps of the adhesive coating and the outer polyethylene coating can be effectively combined together, improving the winding quality.

[0048] The above description is merely a specific embodiment of this utility model, but the protection scope of this utility model is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in this utility model should be included within the protection scope of this utility model. Therefore, the protection scope of this utility model should be determined by the protection scope of the claims.

Claims

1. A 3PE anti-corrosion device, characterized in that, include: The system includes a conveying mechanism, a medium-frequency heating mechanism (200), a winding chamber (300), a first extrusion mechanism (400), a second extrusion mechanism (500), and a cooling mechanism (600). The conveying mechanism is used to carry the workpiece (003) and can sequentially convey the workpiece (003) to the medium frequency heating mechanism (200) and the cooling mechanism (600). The medium frequency heating mechanism (200) is used to heat the workpiece (003). The winding chamber (300) is disposed between the medium-frequency heating mechanism (200) and the cooling mechanism (600), and the winding chamber (300) allows the workpiece (003) to pass through; the first discharge port (421) of the first extrusion mechanism (400) and the second discharge port (521) of the second extrusion mechanism (500) are both connected to the winding chamber (300), and the orthographic projections of the first discharge port (421) and the second discharge port (521) in a preset plane at least partially overlap, and the preset plane is perpendicular to the vertical direction; the first extrusion mechanism (400) is used to extrude adhesive resin to the surface of the workpiece (003), and the second extrusion mechanism (500) is used to extrude polyethylene to the surface of the adhesive resin; The cooling mechanism (600) is used to receive the workpiece (003) coming out of the winding chamber (300) and is able to cool the workpiece (003).

2. The 3PE anti-corrosion equipment according to claim 1, characterized in that: The conveying mechanism includes a bracket (110) and multiple sets of conveying wheel sets (120). The multiple sets of conveying wheel sets (120) are all mounted on the bracket (110) and arranged at intervals along a preset direction. Each set of conveying wheel sets (120) includes two conveying rollers (121). Each conveying roller (121) is rotatably connected to the bracket (110). The rotation axes of the two conveying rollers (121) in the same set are set at an angle. The axis of each conveying roller (121) is not perpendicular to the preset direction.

3. The 3PE anti-corrosion equipment according to claim 1, characterized in that: The first extrusion mechanism (400) includes a first moving platform (410) and a first extrusion die (420). The first moving platform (410) is installed on the side of the winding chamber (300). The first discharge port (421) is disposed on the first extrusion die (420). The first extrusion die (420) is connected to the first moving platform (410). The first moving platform (410) is used to drive the first extrusion die (420) to move relative to the winding chamber (300) to adjust the position of the first discharge port (421) relative to the workpiece (003).

4. The 3PE anti-corrosion equipment according to claim 3, characterized in that: The first moving platform (410) is configured as a two-dimensional moving platform, and the first extrusion die (420) is mounted on the two-dimensional moving platform. The two-dimensional moving platform is used to drive the first extrusion die (420) to move relative to the winding chamber (300) in a first direction (001) and a second direction (002) that are perpendicular to each other. The second direction (002) is consistent with the conveying direction of the conveying mechanism.

5. The 3PE anti-corrosion equipment according to claim 4, characterized in that: The two-dimensional mobile platform includes a first linear telescopic member (411), a first mounting member (412), a second linear telescopic member (413), and a second mounting member (414). The telescopic end of the first linear telescopic member (411) is connected to the first mounting member (412) and is used to drive the first mounting member (412) to slide back and forth along a first direction (001). The second linear telescopic member (413) is connected to the first mounting member (412), and the second mounting member (414) is slidably connected to the first mounting member (412) and connected to the telescopic end of the first linear telescopic member (411). The second linear telescopic member (413) is used to drive the second mounting member (414) to slide back and forth in a second direction (002). The first extrusion die (420) is connected to the second mounting component (414).

6. The 3PE anti-corrosion equipment according to claim 3, characterized in that: The second extrusion mechanism (500) includes a second moving platform (510) and a second extrusion die (520). The second moving platform (510) is mounted on the side of the winding chamber (300). The second discharge port (521) is disposed on the second extrusion die (520). The second extrusion die (520) is connected to the second moving platform (510). The second moving platform (510) is used to drive the second extrusion die (520) to move relative to the winding chamber (300) to adjust the position of the second discharge port (521) relative to the workpiece (003). The orthographic projections of the first extrusion die (420) and the second extrusion die (520) in the preset plane at least partially overlap.

7. The 3PE anti-corrosion equipment according to any one of claims 1-6, characterized in that: The 3PE anti-corrosion equipment also includes two intermediate conveyor wheels (900), which are installed between the medium frequency heating mechanism (200) and the winding chamber (300). The two intermediate conveyor wheels (900) are used to carry and convey the workpiece (003).

8. The 3PE anti-corrosion equipment according to any one of claims 1-6, characterized in that: The 3PE anti-corrosion equipment also includes a powder spraying chamber, which is located between the medium-frequency heating mechanism (200) and the winding chamber (300).

9. The 3PE anti-corrosion equipment according to any one of claims 1-6, characterized in that: The winding chamber (300) is equipped with a lifter (320) and a pressure roller (310). The telescopic end of the lifter (320) is connected to the pressure roller (310). The lifter (320) is used to drive the pressure roller (310) to move closer to or away from the workpiece (003). The pressure roller (310) is used to carry the workpiece (003) and can rotate under the drive of the workpiece (003) to press the adhesive resin and polyethylene onto the surface of the workpiece (003).

10. The 3PE anti-corrosion equipment according to any one of claims 1-6, characterized in that: The cooling mechanism (600) includes a spray pipe assembly for spraying coolant onto the workpiece (003).