A quick connector for an electric boiler
Patent Information
- Application Number
- CN202521019181.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-22
- Publication Date
- 2026-09-01
- Estimated Expiration
- 2035-05-22
AI Technical Summary
[0004]本实用新型提供一种电锅炉的快速接头,旨在解决电锅炉的快速接头,在使用过程中,无法变更输送水流的方向,不便于根据管道系统的走向进行适应性调节的问题
[0013]与现有技术相比,本实用新型的有益效果是:
Smart Images

Figure CN224706515U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of boiler connector technology, and particularly relates to a quick connector for an electric boiler. Background Technology
[0002] Electric boiler connectors are an important component of electric boiler systems. They are responsible for connecting the electric boiler to the heating pipes, ensuring the efficient and safe transmission of heat energy. Electric boiler connectors are key components that connect the electric boiler to the heating system, allowing the heat energy generated by the electric boiler to be transmitted through pipes to the space or equipment that needs to be heated.
[0003] In the prior art, patent CN214662649U discloses a novel water inlet connector for an electric heating boiler. This technical solution reinforces the locking block through the cooperation of various components, making it more resistant to slippage and easier to disassemble compared to traditional connectors where both ends are threaded to the water pipe. However, this quick connector cannot change the direction of the water flow during use, making it inconvenient to adapt to the direction of the pipeline system, thus increasing the installation difficulty of the pipeline system. Utility Model Content
[0004] This utility model provides a quick connector for an electric boiler, aiming to solve the problem that quick connectors for electric boilers cannot change the direction of the water flow during use and are not convenient for adaptive adjustment according to the direction of the pipeline system.
[0005] This utility model is implemented as follows: a quick connector for an electric boiler includes a mating connection sleeve, one end of which is detachably provided with a connection end for connecting to the electric boiler pipe.
[0006] The other end of the connecting sleeve is detachably provided with a second connecting plate. The surface of the second connecting plate is threaded with a number of second connecting bolts. The other end of the connecting sleeve is provided with a number of threaded holes that are adapted to the second connecting bolts. An internal threaded cylinder is fixedly connected inside the second connecting plate. The internal threaded cylinder is threaded with a threaded tube. The other end of the threaded tube is connected to a U-shaped tube. The other end of the U-shaped tube is connected to an external connecting tube. The surface of the external connecting tube is provided with a second engaging groove.
[0007] Preferably, a sealing ring is provided between the second connecting plate and the other end of the mating connecting sleeve.
[0008] Preferably, the other end of the connecting end is connected to a connecting pipe, and the surface of the connecting pipe is provided with a first engaging groove.
[0009] Preferably, a first connecting plate is fixedly connected to the side wall of the connecting end, and the first connecting plate is detachably connected to one end face of the mating connecting sleeve by a plurality of first connecting bolts.
[0010] Preferably, a temperature sensor is provided on the top of the mating connection sleeve, and the sensing end of the temperature sensor extends into the inner cavity of the mating connection sleeve.
[0011] Preferably, a lifting ring is fixedly connected to the top of the docking sleeve.
[0012] Beneficial effects
[0013] Compared with the prior art, the beneficial effects of this utility model are:
[0014] After the threaded pipe is connected to the internal threaded cylinder, and multiple second connecting bolts are connected to the threaded holes at different positions, the orientation of the external pipe can be adjusted. This facilitates adaptive adjustment according to the boiler's piping system, which is beneficial for the installation and operation of the boiler piping. The second locking groove improves the locking stability after the external pipe is connected to the external pipe, and the temperature sensor facilitates the detection of water temperature, which is beneficial for the operation of the boiler. Attached Figure Description
[0015] Figure 1 This is a three-dimensional structural diagram of the present invention;
[0016] Figure 2 This is a schematic diagram of the structure of the U-shaped tube and the outer tube in this utility model;
[0017] Figure 3 This is a schematic diagram of the structure of the second connecting disc and the sealing ring in this utility model.
[0018] In the diagram: 1. Connecting sleeve; 2. First connecting disc; 3. First connecting bolt; 4. Connecting end; 5. Connecting pipe; 6. First engaging groove; 7. Temperature sensor; 8. Lifting ring; 9. Second connecting disc; 10. Second connecting bolt; 11. U-shaped pipe; 12. Internally threaded cylinder; 13. Threaded pipe; 14. External connecting pipe; 15. Second engaging groove; 16. Sealing ring. Detailed Implementation
[0019] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the present utility model and are not intended to limit the present utility model.
[0020] Please see Figure 1-3 This utility model provides a technical solution: a quick connector for an electric boiler, including a butt-connecting sleeve 1, one end of which is detachably provided with a connecting end 4 for connecting to the electric boiler pipe, and the other end of which is detachably provided with a second connecting plate 9, and the surface of the second connecting plate 9 is threaded with a plurality of second connecting bolts 10.
[0021] The other end of the connecting sleeve 1 has several threaded holes that are compatible with the second connecting bolt 10. The inner threaded cylinder 12 is fixedly connected inside the second connecting disc 9. The inner threaded cylinder 12 is threadedly connected to the threaded tube 13. The other end of the threaded tube 13 is connected to the U-shaped tube 11.
[0022] The other end of the U-shaped tube 11 is connected to an outer tube 14. The surface of the outer tube 14 is provided with a second engaging groove 15. A temperature sensor 7 is provided on the top of the mating connection sleeve 1. The sensing end of the temperature sensor 7 extends into the inner cavity of the mating connection sleeve 1.
[0023] After the threaded pipe 13 is threadedly connected to the internal threaded cylinder 12, and multiple second connecting bolts 10 are connected to threaded holes at different positions, the orientation of the external pipe 14 can be adjusted, which facilitates adaptive adjustment according to the boiler's piping system, and is beneficial for the installation and operation of the boiler piping. The second locking slot 15 facilitates the locking stability after the external pipe is connected to the external pipe 14, and the temperature sensor 7 facilitates the detection of the water flow temperature, which is convenient for the operation and use of the boiler.
[0024] Furthermore, a sealing ring 16 is provided between the second connecting plate 9 and the other end of the docking connecting sleeve 1. The sealing ring 16 improves the sealing performance of the connection between the second connecting plate 9 and the docking connecting sleeve 1, reduces the possibility of leakage, and facilitates boiler use.
[0025] Furthermore, the other end of the connecting end 4 is connected to a connecting pipe 5, and the surface of the connecting pipe 5 is provided with a first engaging groove 6. The connecting pipe 5 and the first engaging groove 6 facilitate connection and engagement with the water inlet of the boiler.
[0026] Furthermore, a first connecting plate 2 is fixedly connected to the side wall of the connecting end 4. The first connecting plate 2 is detachably connected to one end face of the mating connecting sleeve 1 by a number of first connecting bolts 3. After removing the number of first connecting bolts 3 and the number of second connecting bolts 10, the mating connecting sleeve 1 can be removed, which is convenient for the temperature sensor 7 to be inspected and maintained.
[0027] Furthermore, a lifting ring 8 is fixedly connected to the top of the docking sleeve 1, which facilitates the installation of the docking sleeve 1.
[0028] The working principle and usage process of this utility model are as follows: After the utility model is installed, the threaded pipe 13 is threadedly connected to the inner threaded cylinder 12, and the multiple second connecting bolts 10 are connected to the threaded holes at different positions. This allows for adjustment of the orientation of the outer pipe 14, which is convenient for adaptive adjustment according to the boiler's piping system and facilitates the installation and operation of the boiler piping. The second locking groove 15 also helps to improve the locking stability after the external pipe is connected to the outer pipe 14, and the temperature sensor 7 facilitates the detection of the water flow temperature.
[0029] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A quick connector for an electric boiler, characterized in that: Includes a docking sleeve (1), one end of which is detachably provided with a connecting end (4) for connecting to an electric boiler pipe; The other end of the connecting sleeve (1) is detachably provided with a second connecting plate (9). The surface of the second connecting plate (9) is threaded with a number of second connecting bolts (10). The other end of the connecting sleeve (1) is provided with a number of threaded holes that are adapted to the second connecting bolts (10). The inside of the second connecting plate (9) is fixedly connected with an internal threaded cylinder (12). The inside of the internal threaded cylinder (12) is threaded with a threaded tube (13). The other end of the threaded tube (13) is connected to a U-shaped tube (11). The other end of the U-shaped tube (11) is connected to an external tube (14). The surface of the external tube (14) is provided with a second engaging groove (15).
2. The quick connector for an electric boiler as described in claim 1, characterized in that: A sealing ring (16) is provided between the second connecting plate (9) and the other end of the docking connecting sleeve (1).
3. The quick connector for an electric boiler as described in claim 1, characterized in that: The other end of the connecting end (4) is connected to a connecting pipe (5), and a first engaging groove (6) is provided on the surface of the connecting pipe (5).
4. The quick connector for an electric boiler as described in claim 1, characterized in that: The side wall of the connecting end (4) is fixedly connected to a first connecting plate (2), and the first connecting plate (2) is detachably connected to one end face of the mating connecting sleeve (1) by a number of first connecting bolts (3).
5. The quick connector for an electric boiler as described in claim 1, characterized in that: A temperature sensor (7) is provided on the top of the docking sleeve (1), and the sensing end of the temperature sensor (7) extends into the inner cavity of the docking sleeve (1).
6. The quick connector for an electric boiler as described in claim 1, characterized in that: The top of the docking sleeve (1) is fixedly connected with a lifting ring (8).