A bathtub with quick water storage and drainage function
Patent Information
- Application Number
- CN202521214473.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-13
- Publication Date
- 2026-09-08
- Estimated Expiration
- 2035-06-13
AI Technical Summary
目前市场上已有的浴缸结构,大多会因为毛发堵塞情况而造成排水不畅,而对其清理较为困难,当采用多个排水口进行放水时,需要将活塞一个个拔取出操作不便的问题
1、本实用新型中采用多个出水口结构,大大加快排水速率,滤腔对使用后的水进行过滤处理,避免杂质落入到连接口内造成管路堵塞。
Smart Images

Figure CN224723147U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of bathtubs, specifically to a bathtub with a rapid water storage and drainage function. Background Technology
[0002] Existing bathtub structures mainly consist of four categories: the bathtub body, the water inlet structure, the drainage structure, and auxiliary structures. Among these, the drainage structure is required to have the characteristics of fast drainage speed and resistance to clogging. Most bathtubs currently on the market suffer from poor drainage due to hair clogging, making them difficult to clean. When multiple drain outlets are used, the pistons need to be removed one by one, which is inconvenient. Utility Model Content
[0003] To solve the above-mentioned technical problems, this utility model provides a bathtub with rapid water storage and drainage function, including a bathtub body and a water storage chamber. The water storage chamber is installed on the outer end of the bathtub body, and a water inlet pipe is installed on the left end face of the water storage chamber. Water pumps are symmetrically arranged in the water storage chamber, and spray nozzles are installed on the inner end of the water pumps. Multiple water outlets are opened from front to back on the bottom of the bathtub body. A connection port is installed at the bottom of the water outlet, and a drain pipe is installed on the rear end face of the connection port. A filter chamber is installed on the inner end of the water outlet by a snap-fit method. A solenoid valve is installed on the inner wall of the water outlet. A control panel is installed on the front end face of the bathtub body, and the control panel is electrically connected to the solenoid valve.
[0004] Preferably, an adjusting rod is arranged inside the connection port, and multiple connecting brackets are installed on the outer wall of the adjusting rod from front to back. An annular sleeve is installed on the outer end of the connecting bracket, and the outer end of the annular sleeve has a sharp structure. A screw head is installed on the front end face of the adjusting rod, and the screw head is connected to the outer wall of the bathtub body by screwing. A sealing gasket is installed on the front end face of the screw head.
[0005] Preferably, a sealing washer is installed on the front end face of the screw head.
[0006] Preferably, a U-shaped frame is installed on the front end face of the bathtub body, and an end cap is rotatably installed on the front end face of the U-shaped frame via a pin.
[0007] Preferably, the adjusting rod is composed of multiple single rods connected by fixing bolts.
[0008] The technical effects and advantages of this utility model are as follows: 1. This utility model adopts a multiple water outlet structure, which greatly accelerates the drainage rate. The filter chamber filters the water after use, preventing impurities from falling into the connection port and causing pipe blockage.
[0009] 2. This utility model adopts an adjusting rod and annular sleeve structure. The annular sleeve scrapes and cleans the impurities on the inner wall of the connection port, thereby removing and cleaning the impurities and avoiding blockage of the connection port, which would slow down the drainage efficiency. Attached Figure Description
[0010] Figure 1 This is a front view of a bathtub structure with rapid water storage and drainage function provided in an embodiment of this application; Figure 2 This is a top view of the structure of a bathtub with rapid water storage and drainage function provided in an embodiment of this application; Figure 3 This is a first sectional front view of a bathtub with rapid water storage and drainage function provided in an embodiment of this application; Figure 4 This is a second sectional front view of a bathtub with rapid water storage and drainage function provided in an embodiment of this application; Figure 5 This is a left sectional view of a bathtub with rapid water storage and drainage function provided in an embodiment of this application; In the diagram: 1. Bathtub body; 2. Water storage chamber; 11. Water inlet pipe; 12. Shower head; 13. Water outlet; 14. Connection port; 15. Drain pipe; 16. Filter chamber; 17. Adjusting rod; 18. Connecting bracket; 19. Ring sleeve; 21. Screw head; 22. Sealing gasket; 23. Solenoid valve; 24. Control panel; 25. C-shaped frame; 26. End cap; 27. Fixing bolt; 28. Water pump. Detailed Implementation
[0011] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments. The embodiments of the present invention are given for illustrative and descriptive purposes only, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations will be apparent to those skilled in the art. The embodiments were chosen and described to better illustrate the principles and practical applications of the present invention, and to enable those skilled in the art to understand the present invention and design various embodiments with various modifications suitable for a particular purpose.
[0012] Please see Figures 1-5This embodiment provides a bathtub with rapid water storage and drainage function, including a bathtub body 1 and a water storage chamber 2. The water storage chamber 2 is installed on the outer end of the bathtub body 1. A water inlet pipe 11 is installed on the left end face of the water storage chamber 2. Water pumps 28 are symmetrically arranged inside the water storage chamber 2. A spray nozzle 12 is installed on the inner end of the water pump 28. Multiple water outlets 13 are opened from front to back on the bottom of the bathtub body 1. A connection port 14 is installed at the bottom of the water outlet 13. A drain pipe 15 is installed on the rear end face of the connection port 14. A filter chamber 16 is installed on the inner end of the water outlet 13 by snap-fit. A solenoid valve 23 is installed on the inner wall of the water outlet 13. A control panel 24 is installed on the front end face of the bathtub body 1. Electrically connected to solenoid valve 23, the control panel 24 contains a PLC program to control the operation of each device. During operation, the inlet pipe 11 is connected to the external water supply system, and water enters the storage chamber 2 for storage. The water pump 28 is turned on, and water enters the bathtub body 1 through the spray nozzle 12 for water filling. The solenoid valve 23 is turned on by the button on the control panel 24, and water enters the connection port 14 through the outlet 13. The drain pipe 15 is connected to the external sewage system to treat sewage. The filter chamber 16 filters the used water to prevent impurities from falling into the connection port 14 and causing pipe blockage. The multiple outlets 13 greatly accelerate the drainage rate.
[0013] An adjusting rod 17 is arranged inside the connection port 14. Multiple connecting brackets 18 are installed on the outer wall of the adjusting rod 17 from front to back. An annular sleeve 19 is installed on the outer end of the connecting bracket 18. The outer end of the annular sleeve 19 has a sharp structure. A screw head 21 is installed on the front end face of the adjusting rod 17. The screw head 21 is connected to the outer wall of the bathtub body 1 by screwing. During operation, after long-term use, a small amount of impurities fall into the connection port 14 and adhere to the inner wall of the connection port 14. Rotating the screw head 21 moves the annular sleeve 19 forward. The annular sleeve 19 scrapes and cleans the impurities on the inner wall of the connection port 14, thereby removing and cleaning the impurities and preventing the connection port 14 from becoming blocked, which would slow down the drainage efficiency.
[0014] A sealing washer 22 is installed on the front end face of the screw head 21. During operation, the sealing washer 22 provides waterproof protection for the connection of the screw head 21.
[0015] A U-shaped frame 25 is installed on the front end face of the bathtub body 1. An end cover 26 is rotatably installed on the front end face of the U-shaped frame 25 via a pin. During operation, the end cover 26 structure is used to provide waterproof protection for the control panel 24 and prevent damage to its internal structure.
[0016] The adjusting rod 17 is composed of multiple single rods connected by fixing bolts 27. During operation, after the adjusting rod 17 is moved forward and removed, the multiple single rods are disassembled in sections, thereby avoiding the difficulty of completely removing the adjusting rod 17 when the bathtub body 1 is located indoors, and reducing the requirement for indoor space.
[0017] In operation, the inlet pipe 11 is connected to the external water supply system, and water enters the storage chamber 2 for storage. The water pump 28 is turned on, and water enters the bathtub body 1 through the spray nozzle 12 for water filling. The solenoid valve 23 is opened by the button on the control panel 24, and water enters the connection port 14 through the outlet 13. The drain pipe 15 is connected to the external sewage system to treat the sewage. The filter chamber 16 filters the used water to prevent impurities from falling into the connection port 14 and causing pipe blockage. The multiple outlets 13 greatly accelerate the drainage rate.
[0018] Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. All other embodiments obtained by those skilled in the art and related fields based on the embodiments of this utility model without creative effort should fall within the protection scope of this utility model. Structures, devices, and operating methods not specifically described and explained in this utility model, unless otherwise specified or limited, shall be implemented according to conventional means in the art.
Claims
1. A bathtub with a rapid water storage and drainage function, comprising a bathtub body (1) and a water storage cavity (2), characterized in that, The bathtub body (1) is provided with a water storage cavity (2) at the outer side end, a water inlet pipe (11) is installed at the left side end face of the water storage cavity (2), water pumps (28) are symmetrically arranged in the water storage cavity (2), a shower head (12) is installed at the inner side end of the water pump (28), a plurality of water outlets (13) are formed in the inner bottom of the bathtub body (1) from front to back, a connecting port (14) is installed at the bottom of the water outlet (13), a drain pipe (15) is installed at the rear side end face of the connecting port (14), and a filter cavity (16) is installed at the inner side end of the water outlet (13) in a clamped manner.
2. The bathtub with the rapid water storage and discharge function according to claim 1, characterized in that An adjusting rod (17) is arranged in the connecting port (14), a plurality of connecting frames (18) are installed on the outer side wall of the adjusting rod (17) from front to back, an annular sleeve (19) is installed at the outer side end of the connecting frame (18), the outer side end of the annular sleeve (19) is in a sharp structure, a screw head (21) is installed at the front side end face of the adjusting rod (17), and the screw head (21) is connected to the outer side wall of the bathtub body (1) in a screwed manner.
3. The bathtub having the rapid water storage and discharge function according to claim 2, wherein, A sealing washer (22) is installed at the front side end face of the screw head (21).
4. The bathtub having the rapid water storage and discharge function according to claim 1, wherein, An electromagnetic valve (23) is installed on the inner side wall of the water outlet (13), a control panel (24) is installed at the front side end face of the bathtub body (1), and the control panel (24) is electrically connected to the electromagnetic valve (23).
5. The bathtub having the rapid water storage and discharge function according to claim 4, wherein, A U-shaped frame (25) is installed at the front side end face of the bathtub body (1), and an end cover (26) is rotatably installed at the front side end face of the U-shaped frame (25) through a pin shaft.
6. The bathtub having the rapid water storage and discharge function according to claim 2, wherein, The adjusting rod (17) is composed of a plurality of single rods which are connected in a screwed manner by fixing bolts (27).