Waterproof base integrated with toilet

CN224723152UActive Publication Date: 2026-09-08BEIJING RUNXINTONG ENERGY SAVING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522176553.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-15
Publication Date
2026-09-08
Estimated Expiration
2035-10-15

AI Technical Summary

Technical Problem

防水底盘是装配式集成卫生间主要部件之一,现有技术防水底盘一般设计为干湿分离设计,干湿分离后,干区和湿区均会开设排水口,防水底盘内部需要开设多条排水通道以与多个排水口对应连接,导致增加了防水底盘内部结构的复杂程度,进而增加了防水底盘的制造难度,不利于集成卫生间的高效生产制造,另外,由于排水通道设置在防水底盘内部,发生堵塞后不方便进行疏通

Benefits of technology

[0012] 1. By utilizing the through-hole design of the first drainage groove, the second drainage groove, and the partition plate, the drainage channel inside the waterproof chassis is avoided, thereby reducing the complexity of the internal structure of the waterproof chassis.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224723152U_ABST
    Figure CN224723152U_ABST
Patent Text Reader

Abstract

The utility model discloses a waterproof chassis of integrated bathroom belongs to waterproof chassis technical field, including chassis body, the top surface of chassis body is established with the anti -overflowing water tank, is fixedly connected with the partition in the anti -overflowing water tank, the top surface of anti -overflowing water tank is divided into dry area and wet area by partition, the both sides of partition are equipped with first drain groove and second drain groove on the top surface of wet area and dry area respectively, and the through -hole that is evenly distributed along its length direction is equipped on the partition, and one end of through -hole is linked together with the groove bottom of first drain groove, and the other end of through -hole is linked together with the side wall of second drain groove, and the top of second drain groove is equipped with sealing assembly, and the side wall on chassis body is equipped with first drain pipe, and first drain pipe is linked together with one end of second drain groove. The utility model discloses a waterproof chassis of integrated bathroom with above -mentioned structure can reduce the complexity degree of waterproof chassis internal structure, and the drainage passage is dredged conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of waterproof chassis technology, and in particular relates to a waterproof chassis for an integrated bathroom. Background Technology

[0002] Prefabricated integrated bathroom components are prefabricated in the factory, requiring only assembly on-site for rapid construction. This solves the problem of excessive floor slab lowering or raising in building structures, avoids the space occupied by drainage pipes laid under the waterproof chassis, and reduces the risk of leakage. The waterproof chassis is one of the main components of prefabricated integrated bathrooms. Current technology typically designs waterproof chassis with dry and wet separation. After dry and wet separation, drainage outlets are opened in both dry and wet areas. The waterproof chassis needs to have multiple drainage channels to connect to multiple drainage outlets, which increases the complexity of the internal structure of the waterproof chassis and thus increases the manufacturing difficulty of the waterproof chassis, hindering the efficient production of integrated bathrooms. In addition, because the drainage channels are located inside the waterproof chassis, it is inconvenient to unclog them if blockage occurs.

[0003] To solve the above problems, a new type of waterproof base for integrated bathrooms is needed. Utility Model Content

[0004] The purpose of this invention is to provide a waterproof base for an integrated bathroom, which can reduce the complexity of the internal structure of the waterproof base and facilitate the unblocking of drainage channels.

[0005] To achieve the above objectives, this utility model provides a waterproof chassis for an integrated bathroom, including a chassis body. An overflow prevention groove is formed on the top surface of the chassis body. A partition plate is fixedly connected inside the overflow prevention groove, dividing the top surface of the overflow prevention groove into a dry area and a wet area. A first drainage groove located on the top surface of the wet area and a second drainage groove located on the top surface of the dry area are respectively provided on both sides of the partition plate. The partition plate has through holes evenly distributed along its length. One end of each through hole communicates with the bottom of the first drainage groove, and the other end communicates with a side wall of the second drainage groove. A sealing component is provided at the top of the second drainage groove. A first drainage pipe is provided on a side wall of the chassis body, and the first drainage pipe communicates with one end of the second drainage groove.

[0006] Preferably, the sealing assembly includes a receiving groove located on the side wall of the second drainage groove opposite to the through hole. The receiving groove is provided with a spring and a sealing cover from the inner end to the outer end. The two ends of the spring are fixedly connected to the groove wall of the receiving groove and the sealing cover, respectively. A plurality of magnets are fixedly connected to the end face of the sealing cover away from the spring. The partition plate is provided with magnetic metal blocks corresponding to the magnets. When the spring is in its natural state, the sealing cover retracts into the receiving groove.

[0007] Preferably, the top surface height of both the dry zone and the wet zone gradually increases from the end closest to the partition plate to the end furthest from the partition plate.

[0008] Preferably, a filter screen is detachably connected to one end of the through hole near the first drainage groove.

[0009] Preferably, the through hole is semi-cylindrical, and the bottom plane of the through hole is flush with the bottom of the first drainage groove.

[0010] Preferably, the top surfaces of both the dry area and the wet area are fixedly connected to a drain outlet, and each drain outlet is correspondingly connected to a second drain pipe located on the side wall of the chassis body.

[0011] Therefore, the waterproof base of the integrated bathroom with the above-described structure of this utility model has the following beneficial effects:

[0012] 1. By utilizing the through-hole design of the first drainage groove, the second drainage groove, and the partition plate, the drainage channel inside the waterproof chassis is avoided, thereby reducing the complexity of the internal structure of the waterproof chassis.

[0013] 2. The first drainage channel, the second drainage channel, and the through hole are all located on the outside of the waterproof chassis, making them easy to unclog and clean;

[0014] 3. The sealing components can prevent odors from the first drain pipe from directly escaping into the integrated bathroom through the second drain channel.

[0015] The technical solution of this utility model will be further described in detail below with reference to the accompanying drawings and embodiments. Attached Figure Description

[0016] Figure 1 This is a structural schematic diagram of an embodiment of the waterproof chassis for an integrated bathroom according to the present invention;

[0017] Figure 2 This is a structural schematic diagram of another embodiment of the waterproof chassis for an integrated bathroom according to this utility model;

[0018] Figure 3This is a structural schematic diagram of an embodiment of the sealing component in the waterproof chassis of an integrated bathroom according to the present invention.

[0019] In the diagram: 1. Chassis body; 2. Overflow trough; 3. Divider plate; 4. Dry area; 5. Wet area; 6. First drainage trough; 7. Second drainage trough; 8. Through hole; 9. Sealing assembly; 91. Spring; 92. Sealing cover; 93. Magnet; 94. Magnetic metal block; 10. First drainage pipe; 11. Drain outlet; 12. Second drainage pipe. Detailed Implementation

[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0021] To make the above-mentioned objectives, features and advantages of this utility model more apparent and understandable, the utility model will be further described in detail below with reference to the accompanying drawings and specific embodiments.

[0022] Example

[0023] Reference Figures 1-3 As shown, this embodiment provides a waterproof chassis for an integrated bathroom, including a chassis body 1. An overflow-proof groove 2 is provided on the top surface of the chassis body 1. A partition plate 3 is fixedly connected inside the overflow-proof groove 2, dividing the top surface of the overflow-proof groove 2 into a dry area 4 and a wet area 5. A first drainage groove 6 located on the top surface of the wet area 5 and a second drainage groove 7 located on the top surface of the dry area 4 are respectively provided on both sides of the partition plate 3. Through holes 8 are evenly distributed along the length of the partition plate 3. One end of the through hole 8 is connected to the bottom of the first drainage groove 6, and the other end of the through hole 8 is connected to one side wall of the second drainage groove 7. Water in the first drainage groove 6 can fall into the second drainage groove 7 through the through hole 8 under gravity. A sealing component 9 is provided on the top of the second drainage groove 7, and a first drainage pipe 10 is provided on one side wall of the chassis body 1, connected to one end of the second drainage groove 7.

[0024] In use, the overflow trough 2 has a certain water storage function to prevent water from overflowing from the integrated bathroom onto the floor outside the bathroom. The partition 3 enables the separation of wet and dry areas in the integrated bathroom, and simultaneously guides water from the wet area 5 through the first drain trough 6 and the through hole 8 into the second drain trough 7 of the dry area 4, and then discharges it through the first drain pipe 10. When the dry area 4 is not draining, the sealing component 9 closes to seal the second drain trough 7, preventing odors from the first drain pipe 10 from directly escaping into the integrated bathroom through the second drain trough 7; when the dry area 4 is draining, the sealing component 9 opens to open the second drain trough 7, allowing water from the dry area 4 to be discharged through the second drain trough 7 into the first drain pipe 10.

[0025] In a further preferred embodiment, the sealing assembly 9 includes a receiving groove located on the side wall of the second drainage groove 7, which is positioned opposite the through hole 8. A spring 91 and a sealing cap 92 are sequentially arranged from the inner end to the outer end of the receiving groove. The two ends of the spring 91 are fixedly connected to the groove wall of the receiving groove and the sealing cap 92, respectively. Several magnets 93 are fixedly connected to the end face of the sealing cap 92 away from the spring 91. Magnetic metal blocks 94, corresponding to the magnets 93, are provided on the partition plate 3. When the spring 91 is in its natural state, the sealing cap 92 retracts into the receiving groove.

[0026] In use, a rubber strip can be added to the sealing cover 92 to increase the sealing performance. A handle or latch can also be added to the top end of the sealing cover 92 for pushing and pulling. In this embodiment, a handle is added. Using the handle, the sealing cover 92 is pulled out of the storage groove, so that the magnet 93 and the magnetic metal block 94 are attached to achieve magnetic attraction and fixation. At this time, the spring 91 is in a stretched state, and the sealing cover 92 blocks the opening of the second drainage groove 7, thereby sealing the second drainage groove 7 and preventing the odor from the first drain pipe 10 from directly escaping into the integrated bathroom through the second drainage groove 7. Using the handle, the sealing cover 92 is pushed into the storage groove, so that the magnet 93 and the magnetic metal block 94 are separated. At this time, the sealing cover 92 can retract into the storage groove under the action of the spring 91.

[0027] Further optimization of the scheme: the top surface height of dry zone 4 and the top surface height of wet zone 5 both gradually increase from the end closer to the partition plate 3 to the end farther away from the partition plate 3.

[0028] When in use, the water in the wet zone 5 can automatically flow into the first drainage trough 6 under the action of gravity, and the water in the dry zone 4 can automatically flow into the second drainage trough 7 under the action of gravity.

[0029] In a further optimized design, a filter screen is detachably connected to one end of the through hole 8 near the first drainage groove 6.

[0030] When in use, the filter screen can intercept impurities in the water, preventing the through holes 8 from becoming clogged and difficult to clean.

[0031] In a further optimized design, the through hole 8 is semi-cylindrical, and the bottom plane of the through hole 8 is flush with the bottom of the first drainage groove 6.

[0032] When in use, the semi-cylindrical through-hole 8 provides a better aesthetic appearance and fewer hard-to-clean areas.

[0033] In a further optimized scheme, drain outlets 11 are fixedly connected to the top surfaces of both the dry area 4 and the wet area 5, and each drain outlet 11 is correspondingly connected to a second drain pipe 12 located on the side wall of the chassis body 1.

[0034] In use, the drain outlet 11 and the second drain pipe 12 are used to drain water from water-using appliances such as toilets, washing machines and washbasins.

[0035] Therefore, the waterproof base of an integrated bathroom with the above-mentioned structure can reduce the complexity of the internal structure of the waterproof base and facilitate the unblocking of drainage channels.

[0036] In the description of this utility model, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this utility model and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.

[0037] The embodiments described above are merely preferred embodiments of the present utility model and are not intended to limit the scope of the present utility model. Various modifications and improvements made to the technical solutions of the present utility model by those skilled in the art without departing from the spirit of the present utility model should fall within the protection scope defined by the claims of the present utility model.

Claims

1. A waterproof base for an integrated bathroom, characterized in that: The chassis body (1) is provided with an overflow trough (2) on its top surface. A partition plate (3) is fixedly connected inside the overflow trough (2). The partition plate (3) divides the top surface of the overflow trough (2) into a dry area (4) and a wet area (5). A first drainage trough (6) located on the top surface of the wet area (5) and a second drainage trough (7) located on the top surface of the dry area (4) are respectively provided on both sides of the partition plate (3). A through hole (8) is provided on the partition plate (3) evenly distributed along its length direction. One end of the through hole (8) is connected to the bottom of the first drainage trough (6), and the other end of the through hole (8) is connected to one side wall of the second drainage trough (7). A sealing component (9) is provided on the top of the second drainage trough (7). A first drainage pipe (10) is provided on one side wall of the chassis body (1). The first drainage pipe (10) is connected to one end of the second drainage trough (7). The sealing assembly (9) includes a storage groove located on the side wall of the second drainage groove (7) opposite to the through hole (8). The storage groove is provided with a spring (91) and a sealing cover (92) from the inner end to the outer end. The two ends of the spring (91) are fixedly connected to the groove wall of the storage groove and the sealing cover (92) respectively. Several magnets (93) are fixedly connected to the end face of the sealing cover (92) away from the spring (91). The partition plate (3) is provided with magnetic metal blocks (94) corresponding to the magnets (93). When the spring (91) is in its natural state, the sealing cover (92) retracts into the storage groove.

2. The waterproof base of the integrated bathroom according to claim 1, characterized in that: The top surface height of the dry area (4) and the top surface height of the wet area (5) both gradually increase from the end closest to the partition plate (3) to the end furthest from the partition plate (3).

3. The waterproof base of the integrated bathroom according to claim 1, characterized in that: A filter screen is detachably connected to one end of the through hole (8) near the first drainage groove (6).

4. The waterproof base of the integrated bathroom according to claim 1, characterized in that: The through hole (8) is semi-cylindrical, and the bottom plane of the through hole (8) is flush with the bottom of the first drainage groove (6).

5. The waterproof base of the integrated bathroom according to claim 1, characterized in that: The top surfaces of the dry area (4) and the wet area (5) are fixedly connected to drain outlets (11), and each drain outlet (11) is connected to a second drain pipe (12) located on the side wall of the chassis body (1).