AI Technical Summary

Technical Problem

[0005]本实用新型的目的为了克服现在3-6米长的管道运输方式存在既花费大量时间,又占用大量塔式起重机吊,管道吊运时间经常不受控制的问题,提供一种利用施工电梯运输超长管道的装置,能将3-6米长管道不需要任何加工,即可应用本实用新型装置在施工电梯中完成管道垂直运输,确保整个运输过程方便高效

Benefits of technology

[0016] The construction elevator has a window on its outer door, which can only be opened from the inside. When transporting pipes, the window is opened, and the device is pushed into the construction elevator. The adjustable gantry frame faces inward, and the pipe is placed on the base through the window on the outer door. The top pipe fitting on the gantry frame is then adjusted to push against the top of the elevator car, and the locking device is tightened, thus fixing the device to the elevator car. The top pipe fitting on the gantry frame is then adjusted downward to push against the wall of the transported pipe, and the locking device is tightened, thus locking the pipe with the arc-shaped pipe support. The entire pipe and device are thus secured. Upon reaching the target floor, the inner door of the construction elevator is opened, and the traction rope installed on the floor is used to hook onto the traction lugs to secure the base, preventing it from sliding outward. The arc-shaped pipe support is released, and the pipes are transported one by one to the floor using a pipe transport trolley or forklift. The entire process requires no other mechanical assistance, utilizing manual labor for pipe transport and avoiding secondary processing of the pipes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224766785U_ABST
    Figure CN224766785U_ABST
Patent Text Reader

Abstract

The utility model relates to a device for transporting super-long pipeline by construction elevator, which comprises a base, wheels, limiting vertical rods, locking jacks, jacking pipes, a door-shaped frame, locking pieces, arc pipe supports and fixed channel steel claws. The utility model is characterized in that four wheels are installed at the lower part of the base, four limiting vertical rods are installed at the upper side of the base along the long side, a door-shaped frame is installed above the base, two locking pieces are installed on each of the three frames of the door-shaped frame, the locking jacks are fixed through the two locking pieces on the horizontal frame and the two locking pieces on the upper part of the two vertical frames, the fixed channel steel claws are fixed on the upper end of the locking jacks, the jacking pipes are fixed through the two locking pieces on the lower part of the two vertical frames, and the jacking pipes are evenly provided with a plurality of arc pipe supports. The utility model can be widely applied to the vertical transportation of all small-diameter pipelines in the construction elevator in electromechanical installation engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of electromechanical installation in building engineering, and relates to a device for transporting ultra-long pipelines using a construction elevator. Background Technology

[0002] With the rapid development of digital building technologies, building electromechanical installation engineering is also undergoing a revolutionary reform and upgrade. Vertical transportation of pipelines is an indispensable part of pipeline installation technology.

[0003] According to conventional construction techniques, pipes 3-6 meters long need to be transported to the installation point before installation. They are then hoisted using unloading platforms, construction shafts, or self-made hoisting cages, and this process is repeated to complete the installation of the long pipe section. This construction technique is time-consuming and consumes a significant amount of tower crane hoisting time, and the pipe hoisting time is often uncontrollable.

[0004] Therefore, there is an urgent need for an efficient and safe mode of transportation. Summary of the Invention

[0005] The purpose of this invention is to overcome the problems of current methods for transporting 3-6 meter long pipelines, which are time-consuming, require a large number of tower cranes, and often have uncontrollable lifting times. This invention provides a device for transporting ultra-long pipelines using a construction elevator. This device can transport 3-6 meter long pipelines vertically in the construction elevator without any processing, ensuring that the entire transportation process is convenient and efficient.

[0006] The present invention adopts the following technical solution: A device for transporting ultra-long pipes using a construction elevator includes a base, wheels, limiting uprights, locking top rods, jacking pipe components, a portal frame, locking components, arc-shaped pipe supports, and fixing slot steel claws. The device is characterized by: four wheels installed on the lower part of the base; four limiting uprights installed along the long side of the upper side of the base; a portal frame installed above the base; two locking components installed on each of the three side frames of the portal frame; the locking top rods are fixed by two locking components on the horizontal side frame and two locking components on the upper part of the two vertical side frames; and fixing slot steel claws are fixed to the upper end of the locking top rods. The jacking pipe components are fixed by two locking components on the lower part of the two vertical side frames, and several arc-shaped pipe supports are evenly fixed on the jacking pipe components.

[0007] This utility model also includes a lifting lug, which is fixed to the base.

[0008] The locking top rod consists of a U-shaped rod, two long rods, and two short rods. The two ends of the U-shaped rod are respectively inserted into the two locking parts on the upper part of the two vertical side frames of the portal frame and fixed. The two short rods are respectively connected to the two long rods to form a whole. The two long rods are respectively inserted into the two locking parts on the horizontal side frame of the portal frame and fixed to the U-shaped rod. A fixing groove steel claw is fixed to the upper end of each of the two long rods.

[0009] The jacking pipe component is another U-shaped rod, with both ends of the other U-shaped rod inserted into the two locking pieces at the bottom of the two vertical frames of the portal frame for fixation. Several arc-shaped pipe supports are evenly fixed on the horizontal bar of the jacking pipe component.

[0010] The arc-shaped pipe support is semi-circular and is fixed to the top pipe fitting by a connecting rod.

[0011] Both the base and the gantry frame are welded from channel steel. Several rollers are placed on the base to facilitate the transport of the pipeline.

[0012] The limiting pole is made of galvanized steel pipe.

[0013] The U-shaped rod, the two long rods, and the two short rods are all made of galvanized steel pipes.

[0014] The other U-shaped rod is made of galvanized steel pipe.

[0015] The arc-shaped pipe support and connecting rod are both made of galvanized steel pipe.

[0016] The construction elevator has a window on its outer door, which can only be opened from the inside. When transporting pipes, the window is opened, and the device is pushed into the construction elevator. The adjustable gantry frame faces inward, and the pipe is placed on the base through the window on the outer door. The top pipe fitting on the gantry frame is then adjusted to push against the top of the elevator car, and the locking device is tightened, thus fixing the device to the elevator car. The top pipe fitting on the gantry frame is then adjusted downward to push against the wall of the transported pipe, and the locking device is tightened, thus locking the pipe with the arc-shaped pipe support. The entire pipe and device are thus secured. Upon reaching the target floor, the inner door of the construction elevator is opened, and the traction rope installed on the floor is used to hook onto the traction lugs to secure the base, preventing it from sliding outward. The arc-shaped pipe support is released, and the pipes are transported one by one to the floor using a pipe transport trolley or forklift. The entire process requires no other mechanical assistance, utilizing manual labor for pipe transport and avoiding secondary processing of the pipes. Attached Figure Description

[0017] Figure 1 This is a schematic diagram of the structure of this utility model.

[0018] Figure 2 This is a schematic diagram of the loading pipeline during the application of this utility model. Detailed Implementation

[0019] The structural drawings further describe this utility model.

[0020] like Figure 1As shown, a device for transporting ultra-long pipes using a construction elevator includes a base 1, wheels 2, limiting uprights 3, locking top rods 4, pipe jacking components 5, a portal frame 6, locking components 7, an arc-shaped pipe support 8, a fixing slot steel claw 9, and lifting lugs 10. The device is characterized by: four wheels 2 installed at the lower part of the base 1; four limiting uprights 3 installed along the long side of the upper side of the base 1; a portal frame 6 installed above the base 1; two locking components 7 installed on each of the three side frames of the portal frame 6; and the locking top rods 4 consisting of a U-shaped rod, two long rods, and two short rods, with the U-shaped rod having ends... Two short rods are inserted into the two locking pieces 7 on the upper part of the two vertical side frames of the portal frame 6 and fixed. The two short rods are connected to the two long rods to form a whole. The two long rods are inserted into the two locking pieces 7 on the horizontal side frame of the portal frame 6 and fixed with the U-shaped rod. The two fixing slot steel claws 9 are fixed to the upper ends of the two long rods respectively. The top pipe component 5 is another U-shaped rod. The two ends of the other U-shaped rod are inserted into the two locking pieces 7 on the lower part of the two vertical side frames of the portal frame 6 and fixed. Five arc-shaped pipe supports are evenly fixed on the horizontal bar of the top pipe component through a connecting rod. The lifting lug 10 is fixed on the base 1.

[0021] The base and gantry frame are both welded from channel steel. Several rollers 11 are placed on the base 1 to facilitate the transport of the pipeline. The limiting upright, U-shaped rod, two long rods, two short rods, another U-shaped rod, and arc-shaped pipe support connecting rod are all made of galvanized steel pipe.

[0022] The pipeline support frame consists of a base 1, wheels 2, and limit poles 3; the pipeline fixing frame consists of locking top rods 4, top pipe fittings 5, gantry frame 6, locking parts 7, arc-shaped pipe supports 8, and fixing slot steel claws 9; the lifting lugs 10 are reserved with wire rope hanging points to fix the base.

[0023] When loading pipes, such as Figure 2 As shown.

[0024] The construction elevator has a window on its outer door. When transporting pipes, the window is opened. To use the elevator, the device is pushed inwards, the adjustable gantry frame is positioned facing the building interior, and the pipe is placed on the base through the opened window on the outer door. The jacking fitting on the gantry frame is then adjusted to push against the top of the elevator car, and the locking mechanism is tightened, securing the device to the elevator car. The jacking fitting on the gantry frame is then adjusted downwards to push against the wall of the transported pipe and tightened, thus locking the curved pipe support and securing the entire pipe and device. Upon reaching the target floor, the inner door of the construction elevator is opened, and the traction rope installed on the floor is used to attach to the traction lugs to secure the base, preventing it from sliding outwards. The curved pipe support is then released, and the pipes are transported one by one to the floor interior using a pipe transport trolley or forklift.

Claims

1. A device for transporting ultra-long pipes using a construction elevator, comprising a base, wheels, limiting uprights, locking top rods, pipe jacking components, a gantry frame, locking components, an arc-shaped pipe support, and fixing slot steel claws; characterized in that: Four wheels are installed at the bottom of the base, and four limiting uprights are installed along the long side of the upper side of the base. A portal frame is installed above the base, and two locking parts are installed on each of the three side frames of the portal frame. The locking top rod is fixed by two locking parts on the horizontal side frame and two locking parts on the upper part of the two vertical side frames. The fixing slot steel claw is fixed to the upper end of the locking top rod. The top pipe is fixed by two locking parts on the lower part of the two vertical side frames, and several arc-shaped pipe supports are evenly fixed on the top pipe.

2. The device for transporting ultra-long pipelines using a construction elevator according to claim 1, characterized in that: It also includes a lifting lug, which is fixed to the base.

3. A device for transporting ultra-long pipelines using a construction elevator according to claim 1 or 2, characterized in that: The locking top rod consists of a U-shaped rod, two long rods, and two short rods. The two ends of the U-shaped rod are respectively inserted into the two locking parts on the upper part of the two vertical side frames of the portal frame and fixed. The two short rods are respectively connected to the two long rods to form a whole. The two long rods are respectively inserted into the two locking parts on the horizontal side frame of the portal frame and fixed to the U-shaped rod. A fixing groove steel claw is fixed to the upper end of each of the two long rods.

4. A device for transporting ultra-long pipelines using a construction elevator according to claim 1 or 2, characterized in that: The jacking pipe component is another U-shaped rod, with both ends of the other U-shaped rod inserted into the two locking pieces at the bottom of the two vertical frames of the portal frame for fixation. Several arc-shaped pipe supports are evenly fixed on the horizontal bar of the jacking pipe component.

5. A device for transporting ultra-long pipelines using a construction elevator according to claim 1 or 2, characterized in that: The arc-shaped pipe support is semi-circular and is fixed to the top pipe fitting by a connecting rod.

6. The device for transporting ultra-long pipelines using a construction elevator according to claim 1, characterized in that: Both the base and the gantry frame are welded from channel steel, and several rollers are placed on the base.

7. The device for transporting ultra-long pipelines using a construction elevator according to claim 1, characterized in that: The limiting pole is made of galvanized steel pipe.

8. The device for transporting ultra-long pipelines using a construction elevator according to claim 3, characterized in that: The U-shaped rod, the two long rods, and the two short rods are all made of galvanized steel pipes.

9. The device for transporting ultra-long pipelines using a construction elevator according to claim 4, characterized in that: The other U-shaped rod is made of galvanized steel pipe.

10. The device for transporting ultra-long pipelines using a construction elevator according to claim 5, characterized in that: The arc-shaped pipe support and connecting rod are both made of galvanized steel pipe.