Foldable temporary step board structure for building construction

CN224785329UActive Publication Date: 2026-09-22WUHAN UNIV OF SCI & TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202522353509.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-06
Publication Date
2026-09-22
Estimated Expiration
2035-11-06

AI Technical Summary

Benefits of technology

[0015]与现有技术相比,本实用新型的有益效果是:该可折叠式建筑施工临时踏步板结构:

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224785329U_ABST
    Figure CN224785329U_ABST
Patent Text Reader

Abstract

The utility model discloses a collapsible building construction temporary step board structure, including the step board A, the one side of step board A is hinged with the step board B, the other side of step board A is provided with two groups of hook assembly, the bottom of step board A is provided with reinforcing component, the hook assembly includes guide hole, guide rod, spring A and hook, two groups the guide hole is set up in the one side of step board A, and the inboard of two groups guide hole is equipped with the guide rod, the utility model discloses through the mutual cooperation between the storage groove, movable rod, spring B, support plate, screw hole and bolt, after the step board is unfolded, overturns support plate and is buckled in the bottom of step board A and step board B connecting place, can directly to the folding part formation rigid support, both avoid the deformation of connecting place because of stress and affect construction safety, further strengthen the overall structural strength of step board, make the step board more stable and reliable in the bearing process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction technology, specifically to a foldable temporary step board structure for building construction. Background Technology

[0002] In the construction process, temporary step boards are a key facility to ensure the safety of construction workers' vertical passage. They are widely used in scaffolding erection, floor transition, and foundation pit perimeter protection. However, traditional temporary step boards have long had many unresolved pain points in practical applications.

[0003] The existing patent with authorization announcement number "CN207314808U" discloses a foldable scaffolding board for construction, including a board body and a handle. The board body includes a single board, a pivot shaft, and a sliding groove. The single board has a first slot that matches the handle. An opening is provided on the side of the single board. A spring is fixedly installed on the sliding groove. A locking pin is installed on the other end of the spring. A wrench is provided on the side of the locking pin. The wrench matches the opening and the wrench and the opening are movably connected. The single boards are movably connected to each other through the pivot shaft. The handle has a second slot that matches the locking pin. The handle and the board body are movably connected through the pivot shaft. Hollow holes are provided on the single board. Anti-slip diagonal texture is provided on the surface of the single board. This solves the problems of low safety of existing scaffolding boards and inconvenience of carrying scaffolding boards on the market.

[0004] However, this device has the following shortcomings:

[0005] 1. When the treadmill is used in building construction, its strength performance is very important. Although the treadmill mentioned above can be folded, the strength of its folded part is relatively weak when the treadmill is unfolded and used, which makes it easy to deform when using it, thereby increasing the danger of using the treadmill.

[0006] 2. Due to the existence of certain dimensional errors during scaffolding erection, and the different dimensions of scaffolding erected in different locations, the aforementioned treads cannot adjust the hook length according to the scaffolding dimensions, resulting in a limited range of applicability for the device. Utility Model Content

[0007] The purpose of this invention is to provide a foldable temporary stair tread structure for building construction, in order to solve the existing problems mentioned in the background art.

[0008] To achieve the above objectives, this utility model provides the following technical solution: a foldable temporary step board structure for building construction, including a step A, a step B hinged to one side of the step A, two sets of hook assemblies provided on the other side of the step A, and a reinforcing assembly provided at the bottom of the step A;

[0009] The hook assembly includes guide holes, guide rods, spring A, and hooks. Two sets of guide holes are opened on one side of pedal A. Guide rods are sleeved on the inner side of the two sets of guide holes. Spring A is sleeved on the outer side of the two sets of guide rods, and spring A is located inside the guide holes. Hooks are provided on one side of the two sets of guide rods and at both ends of the pedal B side.

[0010] Preferably, the reinforcing component includes a storage groove, a movable rod, a spring B, a support plate, a threaded hole, and a bolt. The storage groove is located at the bottom of pedal A. The movable rod is fitted onto the top of the inner side of the storage groove. The spring B is fitted onto the outer side of the movable rod. A support plate is provided at the bottom of the movable rod. A threaded hole is provided on one side of the bottom of pedal B. A bolt that is threaded into the threaded hole is fitted onto the inner side of the support plate. This can improve the strength of the folded area of ​​pedal A and pedal B after they are unfolded and prevent deformation.

[0011] Preferably, the top of the pedal A has a movable hole, and the movable rod is sleeved inside the movable hole to provide space for the movable rod to move.

[0012] Preferably, a hidden hole is provided on the top inner side of the storage groove away from the movable rod to accommodate the bolt, thereby concealing the bolt.

[0013] Preferably, the tops of pedals A and B are uniformly provided with anti-slip protrusions, which can improve the anti-slip performance of pedals A and B and increase the stability of stepping.

[0014] Preferably, the two sets of hooks on the same side are provided with a pull rod at one end, which makes it convenient to adjust the length of the two sets of hooks on the left side by pulling the pull rod. At the same time, after pedal A and pedal B are folded, the device can be moved by pulling the pull rod.

[0015] Compared with the prior art, the beneficial effects of this utility model are: the structure of this foldable temporary construction step board:

[0016] 1. Through the cooperation between the storage slot, movable rod, spring B, support plate, threaded hole and bolt, after the pedal is unfolded, the support plate flips and snaps into the bottom of the connection between pedal A and pedal B, which can directly form rigid support for the folded part. This not only avoids the connection from deforming due to force and affecting construction safety, but also further strengthens the overall structural strength of the step plate, making the pedal more stable and reliable during the load-bearing process.

[0017] 2. Through the cooperation between the guide hole, guide rod, spring A and hook, the device can achieve adaptive extension and retraction adjustment by means of the elastic movement of the hook. It can accurately match the installation requirements of scaffolding with different spacing specifications without the need for additional adapter parts or complicated adjustment operations. This effectively broadens the applicable scenarios and adaptation range of the device and significantly improves its versatility and practicality in diverse construction scenarios. Attached Figure Description

[0018] Figure 1 This is a perspective view of the present utility model;

[0019] Figure 2 This is a front sectional view of the present invention;

[0020] Figure 3 This is a top sectional view of pedal A of this utility model;

[0021] Figure 4 For the present utility model Figure 2 An enlarged schematic diagram of the structure at point A.

[0022] In the diagram: 1. Pedal A; 2. Pedal B; 3. Hook assembly; 31. Guide hole; 32. Guide rod; 33. Spring A; 34. Hook; 4. Reinforcing assembly; 41. Storage slot; 42. Movable rod; 43. Spring B; 44. Support plate; 45. Threaded hole; 46. Bolt. Detailed Implementation

[0023] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0024] Please see Figure 1-4 The present invention provides an embodiment of a foldable temporary step board structure for building construction, including a step A1, a step B2 hinged to one side of the step A1, anti-slip ridges evenly provided on the top of the step A1 and the step B2, which can improve the anti-slip performance of the step A1 and the step B2 and increase the stability of stepping, two sets of hook assemblies 3 are provided on the other side of the step A1, and a reinforcement assembly 4 is provided at the bottom of the step A1.

[0025] The hook assembly 3 includes guide holes 31, guide rods 32, springs A33, and hooks 34. Two sets of guide holes 31 are opened on one side of pedal A1. Guide rods 32 are sleeved on the inner side of the two sets of guide holes 31, and springs A33 are sleeved on the outer side of the two sets of guide rods 32. Springs A33 are located inside the guide holes 31. Hooks 34 are provided on one side of the two sets of guide rods 32 and at both ends of the pedal B2. A pull rod is provided at one end of the two sets of hooks 34 on the same side, which makes it convenient to adjust the length of the two sets of hooks 34 on the left side by pulling the pull rod. At the same time, after pedal A1 and pedal B2 are folded, the device can be moved by pulling the pull rod.

[0026] The reinforcing component 4 includes a storage groove 41, a movable rod 42, a spring B43, a support plate 44, a threaded hole 45, and a bolt 46. The storage groove 41 is located at the bottom of the pedal A1. The movable rod 42 is fitted on the top of the inner side of the storage groove 41. The top of the pedal A1 has a movable hole. The movable rod 42 is fitted inside the movable hole to provide space for the movable rod 42 to move. The spring B43 is fitted on the outer side of the movable rod 42. The support plate 44 is provided at the bottom of the movable rod 42.

[0027] A threaded hole 45 is provided on one side of the bottom of pedal B2. A bolt 46 that is threaded into the threaded hole 45 is fitted on the inner side of the support plate 44. A hidden hole that mates with the bolt 46 is provided on the top side of the inner side of the storage groove 41 away from the movable rod 42. This is used to hide the bolt 46. When pedal A1 and pedal B2 are folded, the bolt 46 can be inserted into the hidden hole. The reinforcing component 4 can improve the strength of the folded part of pedal A1 and pedal B2 after they are unfolded and prevent deformation.

[0028] Working principle: During temporary construction, the pedal can be set up on the scaffold for construction workers to step on. When in use, first flip pedal A1 and pedal B2 to the same level, and then set up the device on the scaffold through the hooks 34 on both sides. According to the difference in the spacing of the scaffold, the length of the hooks 34 can be adjusted by pulling the two sets of hooks 34 on the left side through the pull rod, so that the device can be used for scaffolds with different spacing.

[0029] After the device is installed, the support plate 44 can be removed from the storage slot 41 to overcome the elastic force of the spring B43. Then, after being rotated 180 degrees, the bolt 46 can be screwed into the threaded hole 45 for fixation. The support plate 44 can strengthen the connection between pedal A1 and pedal B2, preventing the device from deforming and being damaged at the connection.

[0030] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

[0031] In the description of this utility model, unless otherwise stated, "a plurality of" means two or more; the terms "upper," "lower," "left," "right," "inner," "outer," "front end," "rear end," "head," "tail," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. In addition, the terms "first," "second," "third," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0032] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "connected" and "linked" should be interpreted broadly. For example, they can refer to a fixed connection or a detachable connection; a mechanical connection or an electrical connection; a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

Claims

1. A foldable temporary construction step structure, comprising a tread A (1), characterized in that: One side of the pedal A (1) is hinged to a pedal B (2), and the other side of the pedal A (1) is provided with two sets of hook assemblies (3). The bottom of the pedal A (1) is provided with a reinforcing assembly (4). The hook assembly (3) includes a guide hole (31), a guide rod (32), a spring A (33), and a hook (34). Two sets of guide holes (31) are opened on one side of the pedal A (1). The guide rod (32) is sleeved on the inner side of the two sets of guide holes (31). The spring A (33) is sleeved on the outer side of the two sets of guide rods (32). The spring A (33) is located inside the guide hole (31). Hooks (34) are provided on one side of the two sets of guide rods (32) and at both ends of the pedal B (2).

2. The foldable temporary construction step structure according to claim 1, characterized in that: The reinforcement component (4) includes a storage groove (41), a movable rod (42), a spring B (43), a support plate (44), a threaded hole (45), and a bolt (46). The storage groove (41) is located at the bottom of the pedal A (1). The movable rod (42) is fitted on the top of the inner side of the storage groove (41). The spring B (43) is fitted on the outer side of the movable rod (42). The support plate (44) is located at the bottom of the movable rod (42). The threaded hole (45) is located on one side of the bottom of the pedal B (2). The bolt (46) that is threaded into the threaded hole (45) is fitted on the inner side of the support plate (44).

3. The foldable temporary construction step structure according to claim 2, characterized in that: The top of the pedal A (1) has a movable hole, and the movable rod (42) is sleeved inside the movable hole.

4. The foldable temporary construction step structure according to claim 2, characterized in that: The storage slot (41) has a hidden hole on the top side of its inner side away from the movable rod (42) that is matched with the bolt (46).

5. The foldable temporary construction step structure according to claim 1, characterized in that: The tops of pedals A (1) and B (2) are uniformly provided with anti-slip ridges.

6. The foldable temporary construction step structure according to claim 1, characterized in that: The two sets of hooks (34) on the same side are provided with a pull rod at one end.

Citation Information

Patent Citations

  • But foldable foot hand rack footboard for building

    CN207314808U