A containerized tank skid with detachable unloading line
Patent Information
- Application Number
- CN202521946242.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-10
- Publication Date
- 2026-09-22
- Estimated Expiration
- 2035-09-10
AI Technical Summary
通过将卸车管路的一端移至集装箱一体撬外侧,并且卸车管路通过连接法兰与连接管路连通,可以实现卸车连接口的方向可以根据现场项目要求进行改变,可以实现左侧、右侧和前侧三个方向的设置,集装箱内部管路可以提前预制,实现批量化生产,减少项目交期。
Smart Images

Figure CN224786895U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to a container skid, specifically a container skid with detachable unloading pipelines. Background Technology
[0002] A containerized gas refueling station is a system that integrates gas refueling equipment into a container, typically used for refueling natural gas or liquefied petroleum gas (LPG). This equipment not only possesses the basic functions of a traditional gas refueling station but also offers advantages in terms of ease of transportation and deployment. Containerized gas refueling stations are widely used in urban transportation, industrial applications, and natural gas supply, and are particularly suitable for remote areas without fixed refueling stations or for temporary refueling needs.
[0003] With existing technology, the unloading pipeline is inside the integrated container skid. The orientation of the pipe opening needs to be designed according to the project requirements, and the connection method with the internal pipeline is fixed. The pipe opening direction is different for each project, which requires a long design and production time. Utility Model Content
[0004] The purpose of this invention is to provide a container skid with detachable unloading pipelines to solve the problems mentioned in the background art.
[0005] To achieve the above objectives, this utility model provides the following technical solution: A container skid with detachable unloading pipeline includes a pipeline assembly fixedly connected to the main body assembly. The pipeline assembly includes an unloading component and internal pipelines. The unloading component is inserted into the side plate and is detachably connected to the internal pipelines. A connecting component is fixedly connected to a submersible pump, an EAG vaporizer, a storage tank, and a booster. The unloading component includes an unloading pipeline, a connecting flange, an unloading safety vent pipeline, unloading instruments, an unloading connection port, and an unloading shut-off valve. One section of the unloading pipeline is inserted into the side plate and has a connecting flange.
[0006] As a further embodiment of this utility model: the main components include an A-frame, a C-frame, a B-frame, a storage tank, a booster, a basket, a submersible pump, a rear-end liquid dispenser pipeline, and an EAG vaporizer. The storage tank is provided with an A-frame and a B-frame at both ends, and the A-frame and B-frame are fixedly connected to the storage tank. A C-frame is provided between the A-frame and the B-frame, and the C-frame is fixedly connected to the A-frame and the B-frame. Inclined plates are provided on both sides of the bottom of the C-frame, and the inclined plates are integrally formed on the C-frame. A booster is provided on one side of the inclined plate, and the booster is fixedly connected to the outside of the bottom inclined plate of the C-frame. A rear-end liquid dispenser pipeline is provided on the outside of the other inclined plate, and the rear-end liquid dispenser pipeline is fixedly connected to the outside of the bottom inclined plate of the C-frame.
[0007] As a further embodiment of this utility model: A basket is provided at the bottom of frame A, and the basket is fixedly connected to frame A. A submersible pump is fixedly connected in the basket. An EAG vaporizer is provided at the top of frame A and is fixedly connected to the top of frame A. A side plate is provided on one side of frame A and is fixedly connected to frame A. A cofferdam is provided inside frame A and is fixedly connected to frame A.
[0008] As a further embodiment of this utility model: a connecting flange is fixedly connected to the unloading pipeline, the unloading pipeline is provided with an unloading safety vent pipeline, the unloading safety vent pipeline is fixedly connected to the unloading pipeline, the unloading pipeline is provided with an unloading instrument, the unloading instrument is fixedly connected to the unloading pipeline, one end of the unloading pipeline is provided with an unloading connection port, the unloading connection port is fixedly connected to the unloading pipeline, and the unloading pipeline is provided with an unloading shut-off valve, the unloading shut-off valve is fixedly connected to the unloading pipeline.
[0009] As a further embodiment of this utility model: the internal pipeline includes a pump pool return gas pipeline, a pump pool liquid inlet pipeline, an upper liquid inlet of the storage tank, a lower liquid inlet of the storage tank, a pressurization pipeline, and a safety venting pipeline. The pump pool return gas pipeline is fixedly connected to the submersible pump. The pump pool liquid inlet pipeline is located at the bottom of the pump pool return gas pipeline and is fixedly connected to the submersible pump. The storage tank is provided with an upper liquid inlet and a lower liquid inlet, which are fixedly connected to the storage tank and are on the same vertical plane. A pressurization pipeline is located on one side of the unloading pipeline, which connects the pressurizer, the unloading pipeline, and the storage tank. The safety venting pipeline connects the EAG vaporizer, the unloading pipeline, and the storage tank liquid inlet pipeline.
[0010] Compared with the prior art, the beneficial effects of this utility model are: By moving one end of the unloading pipeline to the outside of the integrated container skid and connecting the unloading pipeline to the connecting pipeline via a connecting flange, the direction of the unloading connection port can be changed according to the requirements of the site project. It can be set in three directions: left, right and front. The internal pipeline of the container can be prefabricated in advance to achieve mass production and reduce the project delivery time. Attached Figure Description
[0011] Figure 1 This is a schematic diagram of a container skid with detachable unloading pipeline.
[0012] Figure 2 This is a front view structural diagram of a container skid with detachable unloading pipelines.
[0013] Figure 3 This is a schematic diagram of the internal piping structure in a container skid with detachable unloading piping.
[0014] Figure 4This is a schematic diagram of the unloading pipeline in a container skid with a detachable unloading pipeline. Detailed Implementation
[0015] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0016] Please see Figures 1-4 In this embodiment of the present invention, a container skid with detachable unloading pipeline includes a main body component 100 and a pipeline component 200.
[0017] The main component 100 includes a pipeline component 200, which is fixedly connected to the main component 100.
[0018] The main component 100 includes an A-frame 101, a C-frame 102, a B-frame 103, a storage tank 104, a booster 105, a basket 106, a submersible pump 107, a rear-end liquid dispenser pipeline 108, and an EAG vaporizer 109. The storage tank 104 has an A-frame 101 and a B-frame 103 at its two ends, respectively, which are fixedly connected to the storage tank 104. A C-frame 102 is located between the A-frame 101 and the B-frame 103. 102 is fixedly connected to frame A 101 and frame B 103. Frame C 102 has inclined plates 121 on both sides of its bottom. The inclined plates 121 are integrally formed on frame C 102. A booster 105 is provided on one side of the inclined plate 121. The booster 105 is fixedly connected to the outside of the bottom inclined plate 121 of frame C 102. The other inclined plate 121 has a rear liquid dispenser pipeline 108 on its outside. The rear liquid dispenser pipeline 108 is fixedly connected to the outside of the bottom inclined plate 121 of frame C 102.
[0019] A suspended basket 106 is provided at the bottom of frame A101 and is fixedly connected to frame A101. A submersible pump 107 is fixedly connected in the suspended basket 106. An EAG vaporizer 109 is provided at the top of frame A101 and is fixedly connected to the top of frame A101. A side plate 112 is provided on one side of frame A101 and is fixedly connected to frame A101. A cofferdam 111 is provided inside frame A101 and is fixedly connected to frame A101.
[0020] The piping assembly 200 includes an unloading assembly and internal piping. The unloading assembly is inserted into the side plate 112 and is detachably connected to the internal piping. The connecting assembly is fixedly connected to the submersible pump 107, EAG vaporizer 109, storage tank 104 and booster 105.
[0021] The unloading assembly includes an unloading pipeline 211, a connecting flange 212, an unloading safety vent pipeline 213, an unloading instrument 214, an unloading connection port 215, and an unloading shut-off valve 216. One section of the unloading pipeline 211 is inserted into the side plate 112. The connecting flange 212 is fixedly connected to the unloading pipeline 211. The unloading pipeline 211 is equipped with an unloading safety vent pipeline 213. The venting pipeline 213 is fixedly connected to the unloading pipeline 211. The unloading pipeline 211 is equipped with an unloading instrument 214, which is fixedly connected to the unloading pipeline 211. One end of the unloading pipeline 211 is equipped with an unloading connection port 215, which is fixedly connected to the unloading pipeline 211. The unloading pipeline 211 is equipped with an unloading shut-off valve 216, which is fixedly connected to the unloading pipeline 211.
[0022] The internal piping includes a pump pool return air pipe 201, a pump pool inlet pipe 202, a storage tank upper inlet 203, a storage tank lower inlet 204, a pressurization pipe 205, and a safety vent pipe 206. The pump pool return air pipe 201 is fixedly connected to the submersible pump 107. The pump pool inlet pipe 202 is located at the bottom of the pump pool return air pipe 201 and is fixedly connected to the submersible pump 107. The storage tank 104 is equipped with a storage tank upper inlet 203 and a storage tank lower inlet 204. The liquid inlet 204, the upper liquid inlet 203 and the lower liquid inlet 204 of the storage tank are fixedly connected to the storage tank 104, and the upper liquid inlet 203 and the lower liquid inlet 204 of the storage tank are on the same vertical plane. A booster pipe 205 is provided on one side of the unloading pipe 211. The booster pipe 205 connects the booster 105, the unloading pipe 211 and the storage tank 104. The safety vent pipe 206 connects the EAG vaporizer 109, the unloading pipe 211 and the storage tank liquid inlet pipe.
[0023] The working principle of this utility model is as follows: During operation, by moving one end of the unloading pipeline 211 to the outside of the integrated container skid, and connecting the unloading pipeline 211 to the connecting pipeline via the connecting flange 212, the direction of the unloading connection port 215 can be changed according to the requirements of the site project. It can be set in three directions: left, right and front. The internal pipeline of the container can be prefabricated in advance to achieve mass production and reduce the project delivery time.
[0024] Although the present invention has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing embodiments or make equivalent substitutions for some of the technical features. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A container skid with detachable unloading piping, comprising a main body assembly (100) and a piping assembly (200), characterized in that, The main component (100) is provided with a pipeline assembly (200), which is fixedly connected to the main component (100). The pipeline assembly (200) includes an unloading assembly and internal pipelines. The unloading assembly is inserted into the side plate (112). The unloading assembly and the internal pipelines are detachably connected. The connecting assembly is fixedly connected to the submersible pump (107), EAG vaporizer (109), storage tank (104) and booster (105). The unloading assembly includes an unloading pipeline (211), a connecting flange (212), an unloading safety venting pipeline (213), an unloading instrument (214), an unloading connection port (215), and an unloading shut-off valve (216). One section of the unloading pipeline (211) is inserted into the side plate (112), and one section of the unloading pipeline (211) is provided with a connecting flange (212).
2. The container skid with detachable unloading pipeline according to claim 1, characterized in that, The main component (100) includes an A-frame (101), a C-frame (102), a B-frame (103), a storage tank (104), a booster (105), a basket (106), a submersible pump (107), a rear-end liquid dispenser pipeline (108), and an EAG vaporizer (109). The storage tank (104) has an A-frame (101) and a B-frame (103) at both ends, which are fixedly connected to the storage tank (104). A C-frame (102) is located between the A-frame (101) and the B-frame (103). The frame (102) is fixedly connected to the A frame (101) and the B frame (103). The bottom sides of the C frame (102) are provided with inclined plates (121), which are integrally formed on the C frame (102). A booster (105) is provided on one side of the inclined plate (121), and the booster (105) is fixedly connected to the outside of the bottom inclined plate (121) of the C frame (102). The other inclined plate (121) is provided with a rear liquid dispenser pipeline (108), which is fixedly connected to the outside of the bottom inclined plate (121) of the C frame (102).
3. A container skid with a detachable unloading pipeline according to claim 2, characterized in that, A basket (106) is provided at the bottom of frame A (101), and the basket (106) is fixedly connected to frame A (101). A submersible pump (107) is fixedly connected in the basket (106). An EAG vaporizer (109) is provided at the top of frame A (101), and the EAG vaporizer (109) is fixedly connected to the top of frame A (101). A side plate (112) is provided on one side of frame A (101), and the side plate (112) is fixedly connected to frame A (101). A cofferdam (111) is provided inside frame A (101), and the cofferdam (111) is fixedly connected in frame A (101).
4. A container skid with a detachable unloading pipeline according to claim 1, characterized in that, A connecting flange (212) is fixedly connected to the unloading pipeline (211). The unloading pipeline (211) is equipped with an unloading safety vent pipeline (213). The unloading safety vent pipeline (213) is fixedly connected to the unloading pipeline (211). The unloading pipeline (211) is equipped with an unloading instrument (214). The unloading instrument (214) is fixedly connected to the unloading pipeline (211). One end of the unloading pipeline (211) is equipped with an unloading connection port (215). The unloading connection port (215) is fixedly connected to the unloading pipeline (211). The unloading pipeline (211) is equipped with an unloading stop valve (216). The unloading stop valve (216) is fixedly connected to the unloading pipeline (211).
5. A container skid with a detachable unloading pipeline according to claim 1, characterized in that, The internal piping includes a pump pool return air pipe (201), a pump pool inlet pipe (202), a storage tank upper inlet (203), a storage tank lower inlet (204), a pressurization pipe (205), and a safety vent pipe (206). The pump pool return air pipe (201) is fixedly connected to the submersible pump (107). The pump pool return air pipe (201) has a pump pool inlet pipe (202) at its bottom. The pump pool inlet pipe (202) is fixedly connected to the submersible pump (107). The storage tank (104) has a storage tank upper inlet (203) and a storage tank lower inlet (204). The liquid inlet (204), the upper liquid inlet (203) and the lower liquid inlet (204) of the storage tank are fixedly connected to the storage tank (104), and the upper liquid inlet (203) and the lower liquid inlet (204) of the storage tank are on the same vertical plane. A booster pipe (205) is provided on one side of the unloading pipe (211). The booster pipe (205) connects the booster (105), the unloading pipe (211) and the storage tank (104). The safety venting pipe (206) connects the EAG vaporizer (109), the unloading pipe (211) and the storage tank liquid inlet pipe.