[0003]本实用新型旨在提供一种铁路声屏障安装专用检验工装,操作简单、测量精准,解决借助卷尺检测缝隙间距需要针对每条缝隙进行不少于两次的测量导致操作繁琐、数据误差可能性高的问题
[0010]本实用新型的有益效果:相比于需要借助卷尺检测缝隙间距需要针对每条缝隙进行不少于两次的测量,本申请采用铁路声屏障安装专用检验工装,按两点确定一条直线的定义,只需要将工装卡入相邻铁路声屏障对应侧立柱,就能实现对两条直线之间的间距测量,精准检测,不需要多次测量,一次就能实现针对相邻铁路声屏障对应侧立柱平行度及缝隙宽度的检测,操作简单,充分保障铁路声屏障安装符合标准,铁路声屏障安装过程中发现不合格就直接重新调整至符合要求,及时调整,避免后续再纠错更麻烦。
Smart Images

Figure CN224787886U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the technical field of railway ultra-high strength concrete sound barrier installation, specifically relating to a special inspection tool for railway sound barrier installation. Background Technology
[0002] When installing ultra-high strength concrete sound barriers for railways, it is necessary to ensure a verticality of 0.2% and that the gap between adjacent railway sound barriers is within 16mm. However, there is currently no tooling specifically designed for checking the gaps during railway sound barrier installation. The only option is to use a measuring tape to check the gap spacing. But because a single measurement is prone to inaccuracy, at least two measurements are required for each gap to determine whether the verticality of the railway sound barrier and the gap width meet the standards. This process is cumbersome and prone to human measurement errors. If an error is not corrected in time, the adjustment process after installation is troublesome. It is also possible that an error will lead to the same substandard installation of railway sound barriers in subsequent installations, resulting in poor noise reduction effect and far-reaching consequences. Utility Model Content
[0003] This utility model aims to provide a special inspection tool for railway sound barrier installation. It is simple to operate and accurate in measurement, solving the problem that using a measuring tape to check the gap spacing requires at least two measurements for each gap, which leads to cumbersome operation and a high possibility of data error.
[0004] Therefore, the technical solution adopted by this utility model is as follows: a special inspection fixture for railway sound barrier installation. The inspection fixture has a symmetrical structure in both the left and right sides and the front and back. The front and rear ends of the inspection fixture are provided with portal frames. The tops of the two portal frames are connected in the middle by a reinforcing connecting rod. The legs on the same side of the two portal frames are connected by crossbars to form a slot frame that clamps the corresponding side columns of the adjacent railway sound barrier.
[0005] As a preferred option of the above scheme, the inspection fixture is welded from 3cm x 3cm stainless steel, which is reasonable in material selection and has a stable structure.
[0006] A further preferred embodiment is that the dimensions of the portal frame are 193mm~196mm inner width × 9cm~10cm inner height, which is a reasonable size.
[0007] Further preferably, the length of the crossbar is 1m to 1.1m, which is a reasonable size, and the verticality of the railway sound barrier is checked at the same time as the gap width is checked.
[0008] Further preferably, the inspection fixture is equipped with a level and a plumb line, which is reasonably designed to ensure the accuracy of data measurement.
[0009] A further preferred embodiment is that the side columns of the railway sound barrier are 9cm wide, which is a reasonable size.
[0010] The beneficial effects of this utility model are as follows: Compared to methods that require measuring the gap spacing with a tape measure and taking at least two measurements for each gap, this application uses a special inspection tool for railway sound barrier installation. Based on the definition of a straight line determined by two points, the tool only needs to be inserted into the corresponding side column of the adjacent railway sound barrier to measure the distance between the two straight lines accurately. This eliminates the need for multiple measurements; a single measurement can detect the parallelism of the corresponding side columns and the gap width of adjacent railway sound barriers. The operation is simple, fully ensuring that the railway sound barrier installation meets standards. If any defects are found during the installation process, the barrier can be directly readjusted to meet the requirements, allowing for timely adjustments and avoiding more troublesome subsequent corrections.
[0011] This utility model has the advantages of simple one-time measurement operation, accurate detection, and full guarantee that the installation of railway sound barriers meets the standards. Attached Figure Description
[0012] Figure 1 This is a schematic diagram of the structure of this utility model. Detailed Implementation
[0013] The present invention will be further described below with reference to embodiments and accompanying drawings:
[0014] like Figure 1 As shown, a special inspection tool for railway sound barrier installation is provided. The inspection tool has a symmetrical structure on both the left and right sides and front and back. The front and rear ends of the inspection tool are equipped with gantry frames 1.
[0015] The tops of the two portal frames 1 are centered and connected by a reinforcing connecting rod 3.
[0016] The legs on the same side of the two portal frames 1 are connected by crossbars 2 to form a slot frame that locks the corresponding side columns of the adjacent railway sound barrier.
[0017] The inspection fixtures are preferably made of 3cm x 3cm stainless steel welded together.
[0018] The preferred dimensions for the gantry frame 1 are an inner width of 193mm to 196mm and an inner height of 9cm to 10cm.
[0019] The length of the crossbar 2 is preferably 1m to 1.1m.
[0020] The inspection equipment is equipped with a spirit level and a plumb line.
[0021] The width of the side columns of the railway sound barrier is preferably 9cm.
[0022] The width of the side columns of the railway ultra-high strength concrete sound barrier is generally 9cm, and the gap between adjacent railway sound barrier side columns is no more than 16mm. Therefore, the two columns plus the gap are no more than 196mm. The dimensions of the portal frame 1 are 196mm inner width × 9cm inner height.
[0023] Insert the inspection fixture into the side columns of the two adjacent railway sound barriers that have been installed, and use a level and plumb line to assist in the verification of the plumbness.
[0024] If the inspection tool can be inserted into the column, and the column's verticality meets the standard of 0.2% when combined with the level and plumb line, then the installation of the two railway sound barriers is qualified.
[0025] If it fails to meet the requirements, the installed railway sound barrier needs to be adjusted until it meets the requirements.
[0026] By defining a straight line by two points, the distance between two straight lines can be measured simply by inserting the tool into the corresponding side column of the adjacent railway sound barrier. The concept is ingenious and the design is novel.
Claims
1. A special inspection tool for the installation of ultra-high strength concrete sound barriers for railways, characterized in that: The inspection fixture has a symmetrical structure on both sides and front and back. The front and rear ends of the inspection fixture are equipped with portal frames (1). The tops of the two portal frames (1) are connected in the middle by a reinforcing connecting rod (3). The legs on the same side of the two portal frames (1) are connected by a crossbar (2) to form a slot frame that clamps the corresponding side column of the adjacent railway sound barrier.
2. The special inspection tool for the installation of ultra-high strength concrete sound barriers for railways according to claim 1, characterized in that: The inspection fixture is made of 3cm x 3cm stainless steel welded together.
3. The special inspection tool for the installation of ultra-high strength concrete sound barriers for railways according to claim 1, characterized in that: The dimensions of the gantry frame (1) are an inner width of 193mm to 196mm and an inner height of 9cm to 10cm.
4. The special inspection tool for the installation of ultra-high strength concrete sound barriers for railways according to claim 1, characterized in that: The length of the crossbar (2) is 1m to 1.1m.
5. The special inspection tool for the installation of ultra-high strength concrete sound barriers for railways according to claim 1, characterized in that: The inspection fixture is equipped with a spirit level and a plumb line.
6. The special inspection tool for the installation of ultra-high strength concrete sound barriers for railways according to claim 1, characterized in that: The side columns of the railway ultra-high strength concrete sound barrier are 9cm wide.