Multistage split-flow percolation tank for capsule production

CN224821836UActive Publication Date: 2026-10-09SHANGHAI RONGSHEN BIOCHEM CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202521873425.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-09-01
Publication Date
2026-10-09
Estimated Expiration
2035-09-01

AI Technical Summary

Technical Problem

[0003]如申请号为215462148U的实用新型公开了胶囊生产用渗滤罐,类似于上述申请的渗滤罐结构目前还存在以下几点不足:虽然便于对中药进行渗滤,然而仅可进行单级渗滤,并不便于不同级中药的更换,长时间使用后最下级的中药处溶剂饱和不利于中药的充分利用

Benefits of technology

本实用新型设置有安装组件,安装舱和安置框板能够滑动安装于渗漏室中,该安装方式便于安装舱和安置框板的抽出换位,同时方便其内部渗滤药框内中药的清理更换,使用较为灵活,密封层的设置使得安装舱与渗漏室的前侧开口之间形成密封结构,安装舱左右两侧外部的耳板位于罐体的外侧壁并与其为螺栓连接便于安装舱的安装固定。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224821836U_ABST
    Figure CN224821836U_ABST
Patent Text Reader

Abstract

The utility model discloses a multistage shunt percolation tank for capsule production relates to capsule production technical field, including jar body, leakage chamber and installation component, the middle part of jar body is fixed with leakage chamber, the inside installation of leakage chamber has installation component, and installation component includes installation cabin, sealing layer, placement frame board and handle, the outside of installation cabin is provided with sealing layer, and the inside surface both sides of installation cabin are all fixed with placement frame board, and the surface of installation cabin is fixed with handle, the inside fixed of installation cabin, placement frame board has percolation component, and percolation component includes percolation medicine frame and pass medicine water hole. This multistage shunt percolation tank for capsule production, the liquid in jar body flows from top to bottom and carries out multistage percolation through percolation medicine frame, and installation cabin and placement frame board can be slidably installed in leakage chamber, this installation mode is convenient for the extraction transposition of installation cabin and placement frame board, and also is convenient for the cleaning replacement of traditional chinese medicine in the inside percolation medicine frame, and is more flexible to use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of capsule production technology, specifically to a multi-stage diversion percolation tank for capsule production. Background Technology

[0002] Capsules are a dosage form of medicine. In the capsule production process, multi-stage diversion permeation tanks are required. Multi-stage diversion permeation tanks in capsule production are devices used to extract the active ingredients of drugs. Their core is to improve extraction efficiency through multi-stage countercurrent permeation process.

[0003] For example, the utility model application with application number 215462148U discloses a percolation tank for capsule production. The percolation tank structure similar to the above application still has the following shortcomings: although it is convenient to percolate Chinese medicine, it can only perform single-stage percolation, which is not convenient for changing different grades of Chinese medicine. After long-term use, the solvent in the lowest grade of Chinese medicine becomes saturated, which is not conducive to the full utilization of Chinese medicine. Utility Model Content

[0004] The purpose of this invention is to provide a multi-stage diversion percolation tank for capsule production, in order to solve the problems mentioned in the background art.

[0005] To achieve the above objectives, this utility model provides the following technical solution: a multi-stage diversion percolation tank for capsule production, comprising a tank body, a percolation chamber, and an installation assembly. The percolation chamber is fixed in the middle of the tank body, and the installation assembly is installed inside the percolation chamber. The installation assembly includes an installation compartment, a sealing layer, a mounting frame, and a handle. The outer side of the installation compartment is provided with a sealing layer, and mounting frame is fixed on both sides of the inner surface of the installation compartment. A handle is fixed on the outer surface of the installation compartment. The percolation assembly is fixed inside the installation compartment and the mounting frame. The percolation assembly includes a percolation drug frame and a drug passage hole. The percolation drug frame has a cylindrical structure, and the outer wall of the percolation drug frame has a drug passage hole.

[0006] Furthermore, the leakage chamber has through grooves on both the upper and lower sides, and the front side of the leakage chamber has an open structure.

[0007] Furthermore, the installation assembly also includes a rotating handle and ear plates. The rotating handle is rotatably disposed in the middle of the outer surface of the installation chamber, and ear plates are fixed to the outer sides of the left and right sides of the installation chamber. The ear plates are bolted to the outer wall of the tank.

[0008] Furthermore, the percolation assembly also includes a rotating rod and a stirring blade. The rotating rod is rotatably arranged in the middle of the percolation frame, and the other end of the rotating rod is fixedly connected to a rotating handle. A stirring blade is fixed on the outside of the rotating rod, and the stirring blade has a hollow structure.

[0009] Furthermore, the percolation assembly also includes an opening and closing door and a fixing plate. The percolation drug frame is fixedly connected to the installation chamber, and the other side of the percolation drug frame is rotatably installed with an opening and closing door via a hinge. Fixing plates are fixed between the two sides of the percolation drug frame and the mounting frame plate.

[0010] Furthermore, a filter screen is fixed to the lower interior side of the tank, and the filter screen has an arc-shaped arched structure.

[0011] Furthermore, a sludge collection box is provided on the lower sides of both sides of the filter screen, and the sludge collection box penetrates the front wall of the tank and is slidably connected to the tank.

[0012] Furthermore, an inlet pipe is connected to the upper side of the tank, and an outlet pipe is connected to the lower side of the tank.

[0013] This utility model provides a multi-stage diversion percolation tank for capsule production, which has the following beneficial effects: This utility model is equipped with an installation assembly. The installation chamber and the mounting frame can be slidably installed in the leakage chamber. This installation method facilitates the removal and repositioning of the installation chamber and the mounting frame, and also facilitates the cleaning and replacement of the Chinese medicine in the internal percolation medicine frame. It is more flexible in use. The sealing layer creates a sealed structure between the installation chamber and the front opening of the leakage chamber. The ear plates on the left and right sides of the installation chamber are located on the outer wall of the tank and are bolted to it to facilitate the installation and fixing of the installation chamber.

[0014] This utility model is equipped with a percolation assembly. The flow channel formed between the frame plates corresponds to the through groove of the percolation chamber. The liquid in the tank flows from top to bottom through the percolation medicine frame for multi-stage percolation. By turning the handle and rotating the rod, it is easy to drive the rotation of the stirring blade. On the one hand, the rotation of the stirring blade can stir the Chinese medicine inside the percolation medicine frame to accelerate the dissolution of components and avoid incomplete percolation caused by the accumulation of Chinese medicine. On the other hand, the rotation of the stirring blade can prevent the Chinese medicine from clogging the medicine passage holes of the percolation medicine frame. Attached Figure Description

[0015] Figure 1 This is a half-sectional structural diagram of the multi-stage diversion percolation tank used in capsule production according to this utility model; Figure 2 This is a schematic diagram of the external structure of the multi-stage diversion percolation tank used in capsule production according to this utility model; Figure 3 This is a schematic diagram of the modular component structure of the multi-stage diversion percolation tank for capsule production according to this utility model. Figure 4 This is a side view of the percolation assembly of the multi-stage diversion percolation tank used in capsule production according to this utility model.

[0016] In the diagram: 1. Tank body; 2. Leakage chamber; 3. Through groove; 4. Installation assembly; 401. Installation compartment; 402. Sealing layer; 403. Mounting frame plate; 404. Handle; 405. Rotating handle; 406. Ear plate; 5. Percolation assembly; 501. Percolation chemical frame; 502. Chemical passage hole; 503. Rotating rod; 504. Stirring blade; 505. Opening and closing door; 506. Fixing plate; 6. Filter screen; 7. Sludge collection box; 8. Inlet pipe; 9. Outlet pipe. Detailed Implementation

[0017] The embodiments of this utility model will be described in further detail below with reference to the accompanying drawings and examples. The following examples are for illustrative purposes only and should not be construed as limiting the scope of this utility model.

[0018] like Figures 1-2 As shown, a multi-stage diversion percolation tank for capsule production includes a tank body 1, a percolation chamber 2, and an installation assembly 4. The percolation chamber 2 is fixed in the middle of the tank body 1. Through slots 3 are provided on both the upper and lower sides of the percolation chamber 2, and the front of the percolation chamber 2 is open. A filter screen 6 is fixed inside the lower side of the tank body 1, and the filter screen 6 has an arc-shaped arched structure. Sludge collection boxes 7 are provided on both lower sides of the filter screen 6, and the sludge collection boxes 7 penetrate the front wall of the tank body 1 and are slidably connected to the tank body 1. An inlet pipe is connected to the upper side of the tank body 1. 8. A water outlet pipe 9 is connected to the lower side of the tank body 1. The interior of the seepage chamber 2 is used to install the installation chamber 401. The filter screen 6 inside the tank body 1 facilitates the re-filtration of the seepage solution. The filter screen 6 has an arc-shaped arched structure, which allows the impurities filtered on its surface to settle into the sludge collection boxes 7 on both sides under the action of gravity and water flow impact. The sludge collection box 7 penetrates the front wall of the tank body 1 and is slidably connected to the tank body 1. At the same time, the connection between the two is sealed, so that the sludge collection box 7 can be slidably pulled out for cleaning.

[0019] like Figure 1 and Figure 3As shown, the interior of the leakage chamber 2 is equipped with an installation assembly 4, which includes an installation compartment 401, a sealing layer 402, a mounting frame plate 403, and a handle 404. The sealing layer 402 is provided on the outer side of the installation compartment 401, and mounting frame plates 403 are fixed to both sides of the inner surface of the installation compartment 401. A handle 404 is fixed to the outer surface of the installation compartment 401. The installation assembly 4 also includes a rotating handle 405 and ear plates 406. The rotating handle 405 is rotatably disposed in the middle of the outer surface of the installation compartment 401, and ear plates 406 are fixed to the outer sides of the left and right sides of the installation compartment 401. Furthermore, the ear plate 406 is bolted to the outer wall of the tank body 1; the installation compartment 401 and the mounting frame plate 403 can be slidably installed in the leakage chamber 2. This installation method facilitates the removal and repositioning of the installation compartment 401 and the mounting frame plate 403, and also facilitates the cleaning and replacement of the Chinese medicine in the internal permeation medicine frame 501. It is more flexible in use. The setting of the sealing layer 402 makes a sealing structure formed between the installation compartment 401 and the front opening of the leakage chamber 2. The ear plates 406 on the left and right sides of the installation compartment 401 are located on the outer wall of the tank body 1 and are bolted to it, which facilitates the installation and fixing of the installation compartment 401.

[0020] like Figures 2-4 As shown, a percolation assembly 5 is fixed inside the installation chamber 401 and the mounting frame plate 403. The percolation assembly 5 includes a percolation drug frame 501 and a percolation water passage hole 502. The percolation drug frame 501 has a cylindrical structure, and the outer wall of the percolation drug frame 501 has a percolation water passage hole 502. The percolation assembly 5 also includes a rotating rod 503 and a stirring blade 504. The rotating rod 503 is rotatably mounted in the middle of the percolation drug frame 501, and the other end of the rotating rod 503 is fixedly connected to a rotating handle 405. The stirring blade 504 is fixed to the outer side of the rotating rod 503, and the stirring blade 504 has a hollow structure. The percolation assembly 5 also includes an opening and closing door 505 and a fixing plate 506. The percolation drug frame 501 is fixedly connected to the installation chamber 401, and the other end of the percolation drug frame 501... A hinged door 505 is installed on one side, and fixing plates 506 are fixed between the two sides of the percolation frame 501 and the mounting frame plate 403. The flow channel formed between the mounting frame plates 403 corresponds to the through groove 3 of the percolation chamber 2. The liquid in the tank 1 flows from top to bottom through the percolation frame 501 for multi-stage percolation. The door 505 can be rotated to open for easy cleaning of the internal Chinese medicine. By rotating the handle 405 and the rotating rod 503, the stirring blade 504 can be rotated. On the one hand, the rotation of the stirring blade 504 can stir the Chinese medicine inside the percolation frame 501 to accelerate the dissolution of components and avoid incomplete percolation caused by the accumulation of Chinese medicine. On the other hand, the rotation of the stirring blade 504 can prevent the Chinese medicine from clogging the medicine passage hole 502 of the percolation frame 501.

[0021] In summary, as Figures 1-4As shown, this multi-stage diversion percolation tank for capsule production, in use, contains traditional Chinese medicine for capsule extraction inside the percolation frame 501. Water first enters through the inlet pipe 8, and then the flow channel formed between the frame plates 403 corresponds to the through groove 3 of the percolation chamber 2. The liquid in the tank 1 flows from top to bottom through the percolation frame 501 for multi-stage percolation. At this time, the stirring blade 504 can be rotated by turning the handle 405 and the rotating rod 503. On one hand, the rotation of the stirring blade 504 can stir the traditional Chinese medicine inside the percolation frame 501 to accelerate component dissolution and avoid incomplete percolation caused by the accumulation of traditional Chinese medicine. On the other hand, the rotation of the stirring blade 504 can prevent the traditional Chinese medicine from clogging the medicine passage holes 502 of the percolation frame 501. Finally, the filter screen 6 on the lower side inside the tank 1 further filters the percolated liquid. The filter screen 6 has an arc-shaped arched structure, allowing impurities filtered from its surface to be filtered out. Under the influence of gravity and water flow, the sludge can sink into the sludge collection boxes 7 on both sides. The sludge collection boxes 7 penetrate the front wall of the tank body 1 and slide to connect with the tank body 1. The connection between the two is sealed, allowing the sludge collection boxes 7 to be slidably pulled out for easy cleaning. During use, the installation chamber 401 and the mounting frame plate 403 can be slidably installed in the percolation chamber 2. This installation method facilitates the removal and repositioning of the installation chamber 401 and the mounting frame plate 403, and also facilitates the cleaning and replacement of the Chinese medicine in the internal percolation medicine frame 501. It is quite flexible in use. The sealing layer 402 forms a sealed structure between the installation chamber 401 and the front opening of the percolation chamber 2. The ear plates 406 on the left and right sides of the installation chamber 401 are located on the outer side wall of the tank body 1 and are bolted to it, which facilitates the installation and fixation of the installation chamber 401. This completes the use process of the multi-stage diversion percolation tank for capsule production.

[0022] The embodiments of this utility model are given for illustrative and descriptive purposes only, and are not intended to be exhaustive or to limit the utility model to the forms disclosed. Many modifications and variations will be apparent to those skilled in the art. The embodiments were chosen and described in order to better illustrate the principles and practical applications of this utility model, and to enable those skilled in the art to understand this utility model and design various embodiments with various modifications suitable for a particular purpose.

Claims

1. A multi-stage diversion percolation tank for capsule production, comprising a tank body (1), a percolation chamber (2), and an installation assembly (4), characterized in that, A leakage chamber (2) is fixed in the middle of the tank (1). An installation assembly (4) is installed inside the leakage chamber (2). The installation assembly (4) includes an installation compartment (401), a sealing layer (402), a mounting frame (403), and a handle (404). A sealing layer (402) is provided on the outside of the installation compartment (401). Mounting frames (403) are fixed on both sides of the inner surface of the installation compartment (401). A handle (404) is fixed on the outer surface of the installation compartment (401). A percolation assembly (5) is fixed inside the installation compartment (401) and the mounting frame (403). The percolation assembly (5) includes a percolation medicine frame (501) and a percolation water hole (502). The percolation medicine frame (501) is a cylindrical structure. A percolation water hole (502) is opened on the outer wall of the percolation medicine frame (501).

2. The multi-stage diversion percolation tank for capsule production according to claim 1, characterized in that, The leakage chamber (2) has through grooves (3) on both the upper and lower sides, and the front side of the leakage chamber (2) is an open structure.

3. The multi-stage diversion percolation tank for capsule production according to claim 1, characterized in that, The installation assembly (4) also includes a rotating handle (405) and a lug plate (406). The rotating handle (405) is rotatably disposed in the middle of the outer surface of the installation chamber (401), and the lug plate (406) is fixed on the left and right sides of the installation chamber (401). The lug plate (406) is bolted to the outer wall of the tank (1).

4. The multi-stage diversion percolation tank for capsule production according to claim 3, characterized in that, The percolation assembly (5) also includes a rotating rod (503) and a stirring blade (504). The rotating rod (503) is rotatably arranged in the middle of the percolation frame (501), and the other end of the rotating rod (503) is fixedly connected to the rotating handle (405). The stirring blade (504) is fixed on the outside of the rotating rod (503), and the stirring blade (504) has a hollow structure.

5. The multi-stage diversion percolation tank for capsule production according to claim 1, characterized in that, The percolation assembly (5) also includes an opening and closing door (505) and a fixing plate (506). The percolation drug frame (501) is fixedly connected to the installation chamber (401), and the opening and closing door (505) is rotatably installed on the other side of the percolation drug frame (501) via a hinge. The fixing plate (506) is fixed between the two sides of the percolation drug frame (501) and the mounting frame plate (403).

6. The multi-stage diversion percolation tank for capsule production according to claim 1, characterized in that, A filter screen (6) is fixed on the lower inside of the tank (1), and the filter screen (6) has an arc-shaped arched structure.

7. The multi-stage diversion percolation tank for capsule production according to claim 6, characterized in that, Both sides of the filter screen (6) are provided with a sludge collection box (7), and the sludge collection box (7) penetrates the front wall of the tank (1) and is slidably connected to the tank (1).

8. The multi-stage diversion percolation tank for capsule production according to claim 1, characterized in that, The upper side of the tank (1) is connected to a water inlet pipe (8), and the lower side of the tank (1) is connected to a water outlet pipe (9).

Citation Information

Patent Citations

  • Percolation tank for capsule production

    CN215462148U