Technical Problem

[0003]针对上述情况,为克服现有技术之缺陷,本实用新型之目的就是提供一种硐室内提升装置,以解决了成本高、灵活性差的问题

Benefits of technology

[0009]本实用新型较传统设备有以下益处:1)结构紧凑,适应性强,专为硐室空间优化设计,占地面积小;2)安装便捷,成本低廉,省去了地面大型井塔的建设,主要利用硐室现有空间,大大降低了土建和总体成本;3)罐笼和吊具相结合,巧妙提升物料,操作灵活,功能齐全,安全稳定。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224831765U_ABST
    Figure CN224831765U_ABST
Patent Text Reader

Abstract

The chamber lifting device solves the problems of high cost and poor flexibility, and comprises a chamber, a shaft and a load flatcar, a support platform and a beam frame are fixed in the chamber, tracks are arranged in the chamber and on the beam frame, a load portal frame is fixed above the shaft, a pulley frame is fixed at the top of the load portal frame, a first winch and a second winch are installed on the support platform, the first winch is wound with a first steel wire rope, a first pulley block, a second pulley block and a third pulley block are installed on the pulley frame, a cage and a lifting tool are arranged below the load portal frame, the first steel wire rope is fixedly connected with the top end of the cage through the first pulley block, the second winch is wound with a second steel wire rope and a third steel wire rope, a fifth pulley block and a sixth pulley block are installed on the upper end of the lifting tool, the second steel wire rope passes through the second pulley block and the fifth pulley block in sequence, the third steel wire rope passes through the third pulley block and the sixth pulley block in sequence, and the right end of the second steel wire rope and the right end of the third steel wire rope are fixed on the pulley frame.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of lifting equipment manufacturing technology, and in particular relates to a lifting device for a tunnel. Background Technology

[0002] Shaft hoisting devices are large-scale, fixed mechanical equipment used for hoisting coal, ore, gangue, lowering equipment and materials, and transporting personnel along vertical or inclined shafts. Traditional surface-mounted hoisting systems require the construction of tall shafts on the ground, occupying a large area, incurring high civil engineering costs, and significantly impacting the surface landscape and environment. Conventional underground hoisting systems have limitations: many underground hoisting devices are not specifically designed for confined chamber spaces and cannot perform material hoisting and transportation tasks like those on the surface, resulting in problems such as large size, complex installation, and poor flexibility. Utility Model Content

[0003] In view of the above situation and to overcome the shortcomings of the existing technology, the purpose of this utility model is to provide a lifting device for a tunnel, so as to solve the problems of high cost and poor flexibility.

[0004] The technical solution to the technical problem is as follows: It includes a chamber containing a vertical shaft, a cargo flatcar within the chamber, and a fixed support platform located on the left side of the shaft. The cargo flatcar runs below the support platform. A beam frame is fixed inside the shaft, and tracks are provided both inside the chamber and on the beam frame. The cargo flatcar runs left and right on the tracks. A load-bearing gantry is fixed above the shaft, and a pulley frame is fixed at the top of the load-bearing gantry. A first winch and a second winch are installed on the support platform. The first winch is wound with a first steel wire rope. A first pulley block, a second pulley block, and a third pulley block are installed on the pulley frame. The three pulley blocks are symmetrical about the first pulley block. A cage and a lifting device are located below the load-bearing gantry. The cage is located above the lifting device. The first wire rope is fixedly connected to the top of the cage via the first pulley block. The second winch winds the second and third wire ropes. The fifth and sixth pulley blocks are installed at the upper end of the lifting device. The second wire rope passes through the second and fifth pulley blocks in sequence, and the right end of the second wire rope is fixed to the pulley frame. The third wire rope passes through the third and sixth pulley blocks in sequence, and the right end of the third wire rope is fixed to the pulley frame.

[0005] Preferably, a plurality of first sleeves corresponding to the second wire rope are evenly fixed on the cage, and the second wire rope passes through the first sleeve from top to bottom. A plurality of second sleeves corresponding to the third wire rope are evenly fixed on the cage, and the third wire rope passes through the second sleeve from top to bottom.

[0006] Preferably, the flatbed cart is an electric flatbed cart, and protective railings are fixed on the flatbed cart.

[0007] Preferably, a control box is installed inside the chamber.

[0008] Preferably, a crane is installed inside the chamber, and the crane is located on the left side of the support platform.

[0009] This utility model has the following advantages over traditional equipment: 1) It has a compact structure, strong adaptability, and is specially designed for the optimized space of the chamber, with a small footprint; 2) It is easy to install and has low cost, eliminating the need for the construction of a large ground well tower, and mainly utilizing the existing space of the chamber, which greatly reduces the civil engineering and overall costs; 3) The combination of cage and lifting device cleverly lifts materials, is flexible in operation, has complete functions, and is safe and stable. Attached Figure Description

[0010] Figure 1 This is a schematic diagram of the front view of this utility model; Figure 2 This is a schematic diagram of the top view of this utility model; Figure 3 yes Figure 1 A schematic diagram of the AA section view; Figure 4 This is a schematic diagram of the three-dimensional structure of this utility model; Figure 5 This is a schematic diagram of the three-dimensional structure of the chamber of this utility model.

[0011] Reference numerals: 1. Chamber; 2. Shaft; 3. Cargo flatcar; 4. Support platform; 5. Beam frame; 6. Track; 7. Load-bearing gantry; 8. Pulley frame; 9. First winch; 10. Second winch; 11. First wire rope; 12. First pulley block; 13. Second pulley block; 14. Third pulley block; 15. Cage; 16. Lifting device; 17. Second wire rope; 18. Third wire rope; 19. Fifth pulley block; 20. Sixth pulley block; 21. First sleeve; 22. Second sleeve; 23. Control box; 24. Crane. Detailed Implementation

[0012] The specific embodiments of this utility model will be further described in detail below with reference to the accompanying drawings.

[0013] Depend on Figures 1 to 5Provided is a hoisting device for a tunnel, comprising a tunnel 1, a shaft 2 within the tunnel 1, a cargo flatcar 3 within the tunnel 1, a support platform 4 fixed to the left side of the shaft 2 within the tunnel 1, the cargo flatcar 3 running below the support platform 4, a beam frame 5 fixed within the shaft 2, and tracks 6 provided both within the tunnel 1 and on the beam frame 5, the cargo flatcar 3 running left and right on the tracks 6, a load-bearing gantry 7 fixed above the shaft 2, a pulley frame 8 fixed to the top of the load-bearing gantry 7, a first winch 9 and a second winch 10 mounted on the support platform 4, the first winch 9 wound with a first steel wire rope 11, and a first pulley block 12, a second pulley block 13 and a third pulley block 14 mounted on the pulley frame 8, the second pulley... Group 13 and the third pulley group 14 are symmetrical about the first pulley group 12. A cage 15 and a lifting device 16 are provided below the load-bearing gantry 7. The cage 15 is located above the lifting device 16. The first wire rope 11 is fixedly connected to the top of the cage 15 via the first pulley group 12. The second winch 10 is wound with the second wire rope 17 and the third wire rope 18. The fifth pulley group 19 and the sixth pulley group 20 are installed on the upper end of the lifting device 16. The second wire rope 17 passes through the second pulley group 13 and the fifth pulley group 19 in sequence, and the right end of the second wire rope 17 is fixed on the pulley frame 8. The third wire rope 18 passes through the third pulley group 14 and the sixth pulley group 20 in sequence, and the right end of the third wire rope 18 is fixed on the pulley frame 8.

[0014] To ensure the stability of the cage 15 during lifting, multiple first sleeves 21 corresponding to the second wire rope 17 are evenly fixed on the cage 15. The second wire rope 17 passes through the first sleeves 21 from top to bottom. Multiple second sleeves 22 corresponding to the third wire rope 18 are evenly fixed on the cage 15. The third wire rope 18 passes through the second sleeves 22 from top to bottom.

[0015] The flatbed cart 3 is an electric flatbed cart, and protective railings are fixed on the flatbed cart 3.

[0016] A control box 23 is installed inside the chamber 1.

[0017] To facilitate the loading and unloading of materials onto the flatbed cart 3, a crane 24 is installed inside the chamber 1, and the crane 24 is located on the left side of the support platform 4.

[0018] In use, when materials need to be transported into the shaft 2, the crane 24 is started, and the crane 24 places the materials on the loading flatcar 3. The guardrails prevent the materials from falling off the loading flatcar 3. The loading flatcar 3 moves the materials to the right along the track 6 of the chamber 1 onto the track 6 of the beam frame 5. When only the lifting device 16 is needed, the cage 15 is at the top, and the second winch 10 is started. The second winch 10 simultaneously releases or retracts the second wire rope 17 and the third wire rope. 18. The other end of the second wire rope 17 is fixed to the front side of the pulley frame 8, and the other end of the third wire rope 18 is fixed to the rear side of the pulley frame 8. The second wire rope 17 drives the fifth pulley group 19 to rise and fall through the second pulley group 13, and the third wire rope 18 drives the sixth pulley group 20 to rise and fall through the third pulley group 14. The fifth pulley group 19 and the sixth pulley group 20 simultaneously drive the lifting device 16 to rise and fall, ensuring the stability of the lifting device 16. The lifting device 16 can directly lift the materials on the flatcar 3. When only cage 15 needs to be operated, the second winch 10 is started. The second winch 10 controls the lifting device 16 to rise to the bottom of cage 15. When the fifth pulley block 19 contacts the bottom of the first sleeve 21 and the sixth pulley block 20 contacts the bottom of the second sleeve 22, the second winch 10 is shut off. Then, the first winch 9 and the second winch 10 are started simultaneously. The first winch 9 and the second winch 10 operate synchronously. The first winch 9 releases or retracts the first wire rope 11. The first wire rope 11 controls the lifting and lowering of cage 15 via the first pulley block 12. When the cage 15 and the lifting device 16 move synchronously up and down, the first winch 9 and the second winch 10 are closed at the same time when the cage 15 moves to the position of the loading flatcar 3. The cage door of the cage 15 is opened, and the material on the loading flatcar 3 can be loaded into the cage 15. After loading is completed, the cage door of the cage 15 is closed, and the first winch 9 and the second winch 10 are started at the same time. The cage 15 and the lifting device 16 can be lifted and transported in the vertical shaft 2. Under the action of the first sleeve 21 and the second sleeve 22, the overall stability of the cage 15 is further guaranteed, making it safe and reliable. When both the lifting device 16 and the cage 15 are in operation, the second winch 10 is started first. The second winch 10 controls the lifting device 16 to rise and fall. When the lifting device 16 lifts the material to a suitable position inside the shaft 2, the second winch 10 is turned off and the first winch 9 is started. The first winch 9 controls the cage 15 to move downward to the loading flatcar 3. Then the remaining material is loaded into the cage 15. At the same time, the first winch 9 and the second winch 10 are started. The lifting device 16 and the cage 15 simultaneously transport the material down the shaft 2. The load capacity is large and the operation is flexible.

[0019] This embodiment does not impose any limitation on the shape, material, structure, etc. of this utility model. Any simple modifications, equivalent changes, and alterations made to the above embodiments based on the technical essence of this utility model shall fall within the protection scope of this utility model.

Claims

1. A hoisting device for a tunnel, comprising a tunnel (1) and a vertical shaft (2) disposed within the tunnel (1), characterized in that, A flatcar (3) is installed in the chamber (1). A support platform (4) located on the left side of the shaft (2) is fixed in the chamber (1). A beam frame (5) is fixed in the shaft (2). Tracks (6) are provided in both the chamber (1) and the beam frame (5). The flatcar (3) runs in the left and right directions on the track (6). A load-bearing gantry (7) is fixed above the shaft (2). A pulley frame (8) is fixed at the top of the load-bearing gantry (7). A first winch (9) and a second winch (10) are installed on the support platform (4). A first wire rope (11) is wound around the first winch (9). A first pulley block (12), a second pulley block (13), and a third pulley block (14) are installed on the pulley frame (8). The second pulley block (13) and the third pulley block (14) are related to the first pulley block (12). 2) Symmetrical front and back, a cage (15) and a lifting device (16) are provided below the load-bearing gantry (7). The cage (15) is located above the lifting device (16). The first wire rope (11) is fixedly connected to the top of the cage (15) via the first pulley block (12). The second winch (10) is wound with the second wire rope (17) and the third wire rope (18). The fifth pulley block (19) and the sixth pulley block (20) are installed on the upper end of the lifting device (16). The second wire rope (17) passes through the second pulley block (13) and the fifth pulley block (19) in sequence, and the right end of the second wire rope (17) is fixed on the pulley frame (8). The third wire rope (18) passes through the third pulley block (14) and the sixth pulley block (20) in sequence, and the right end of the third wire rope (18) is fixed on the pulley frame (8).

2. The chamber lifting device according to claim 1, characterized in that, The cage (15) is uniformly fixed with a plurality of first sleeves (21) corresponding to the second wire rope (17), the second wire rope (17) passes through the first sleeves (21) up and down, and the cage (15) is uniformly fixed with a plurality of second sleeves (22) corresponding to the third wire rope (18), the third wire rope (18) passes through the second sleeves (22) up and down.

3. The chamber lifting device according to claim 1, characterized in that, The flatbed cart (3) is an electric flatbed cart, and a protective railing is fixed on the flatbed cart (3).

4. The chamber lifting device according to claim 1, characterized in that, A control box (23) is installed inside the chamber (1).

5. A chamber lifting device according to claim 1, characterized in that, A crane (24) is installed inside the chamber (1), and the crane (24) is located on the left side of the support platform (4).