A building construction scaffold for easy climbing
Patent Information
- Application Number
- CN202522131946.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-09
- Publication Date
- 2026-10-09
- Estimated Expiration
- 2035-10-09
AI Technical Summary
[0004]上述申请的攀爬杆与支撑架是一体的,但攀爬杆频繁被踩踏容易损坏,不便于单独更换的同时,施工时,高处的掉落物容易砸伤工作人员
1、该方便攀爬的建筑施工用脚手架,通过架体内侧螺纹连接的多个攀爬杆,配合第一杆体和第二杆体的滑动连接,使攀爬杆旋转的同时可以与架体进行固定或拆卸,便于攀爬杆的更换,且架体上的限位管与防护网底部的支撑杆插接,方便对防护网进行固定,对工作人员的上方空间进行保护,有利于拦截高处的掉落物,避免砸伤等事故发生。
Smart Images

Figure CN224834318U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of scaffolding technology, specifically to a construction scaffolding that is easy to climb. Background Technology
[0002] In construction, scaffolding assists construction workers in directly stacking, transporting, and installing materials at heights, avoiding many inconveniences caused by limited ground space and reducing safety risks associated with height.
[0003] Application No. 202221909388.3 discloses a construction scaffold that is easy to climb. A fastening rod fixedly installed on the outside of the climbing support frame is inserted into the inside of the second scaffold pole. The threaded connection between the fastening rod and the fastening block limits the movement between the first scaffold pole, the second scaffold pole and the climbing support frame. The threaded connection between the bearing rod and the fixing block limits the movement of the footboards, making it easy to assemble the scaffold.
[0004] The climbing pole and support frame in the above application are integrated, but the climbing pole is easily damaged by frequent trampling and is not easy to replace separately. At the same time, during construction, falling objects from a height can easily injure workers. Utility Model Content
[0005] In view of the shortcomings of the existing technology, this utility model provides a construction scaffold that is easy to climb, thus solving the problems mentioned in the background art.
[0006] To achieve the above objectives, this utility model provides the following technical solution: a construction scaffold that is easy to climb, comprising two frame bodies. Limiting tubes are installed on corresponding sides of the top of the two frame bodies. Support plates are sleeved on the outer sides of the four limiting tubes. Multiple threaded holes are opened on corresponding sides inside the two frame bodies. Multiple climbing rods are threadedly connected to the inner sides of the two frame bodies. Each climbing rod includes a first rod body. A second rod body is slidably connected inside the first rod body. One end of the first rod body and the second rod body is fixedly connected to a threaded post that mates with the threaded hole. Support rods are inserted into the interior of the four limiting tubes. Protective nets are connected to the top of the four support rods.
[0007] Preferably, two positioning rods are inserted between the two frames, and each of the two frames has a corresponding insertion hole on its two sides that cooperates with the positioning rods. Each of the two positioning rods has multiple positioning holes inside.
[0008] Preferably, positioning plates are installed on both sides of the two frames corresponding to each other and at the top of the insertion holes. The positioning plates are internally threaded with bolts, one end of which is inserted into one of the positioning holes.
[0009] Preferably, the support plate includes a first plate body, and a second plate body is slidably connected inside the first plate body. The first plate body and the second plate body are provided with mounting holes that cooperate with the limiting tube on their corresponding sides.
[0010] Preferably, guardrails are installed at one end of the first plate and the second plate, and between two adjacent limiting tubes.
[0011] Preferably, auxiliary frames are installed on both sides of the two frames and on the top of the positioning plate. The auxiliary frames have movable holes inside, which are aligned with the positioning rods. The inner diameter of the movable holes is larger than the outer diameter of the positioning rods.
[0012] This utility model provides a construction scaffold that is easy to climb, and has the following beneficial effects: 1. This easy-to-climb construction scaffold uses multiple climbing rods connected by threads on the inner side of the frame. With the sliding connection of the first and second rods, the climbing rods can be fixed or disassembled to the frame while rotating, facilitating the replacement of the climbing rods. In addition, the limiting tubes on the frame are inserted into the support rods at the bottom of the safety net, which facilitates the fixation of the safety net and protects the space above the workers. It is also helpful in intercepting falling objects from heights and avoiding accidents such as injuries.
[0013] 2. This easy-to-climb construction scaffold uses a telescopic support plate structure, which allows for easy reduction of the space occupied by the support plate without reducing its size. The size of the scaffold can be adjusted according to needs. Positioning rods are inserted between the two sets of frames and fixed with bolts, which helps to enhance the stability of the scaffold and prevents obstruction of the expansion and contraction of the support plate. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a partial structural diagram of the present invention; Figure 3 This utility model Figure 1 Enlarged view of point A in the middle; Figure 4 This is a side view of the present invention.
[0015] In the diagram: 1. Frame; 2. Limiting tube; 3. Support plate; 31. First plate; 32. Second plate; 33. Mounting hole; 4. Threaded hole; 5. Climbing rod; 51. First pole; 52. Second pole; 53. Threaded column; 6. Support rod; 7. Protective net; 8. Positioning rod; 9. Insertion hole; 10. Positioning hole; 11. Positioning plate; 12. Bolt; 13. Auxiliary frame; 14. Movable hole; 15. Guardrail. Detailed Implementation
[0016] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments.
[0017] Please see Figures 1 to 4 This utility model provides a technical solution: a construction scaffold that is easy to climb, comprising two frame bodies 1. Limiting tubes 2 are installed on corresponding sides of the top of each of the two frame bodies 1. Support plates 3 are sleeved on the outer sides of the four limiting tubes 2. Each support plate 3 includes a first plate 31, with a second plate 32 slidably connected inside the first plate 31. Mounting holes 33, which mate with the limiting tubes 2, are provided on corresponding sides of the first plate 31 and the second plate 32. The telescopic structure allows the first plate 31 and the second plate 32 to be extended to the required length as needed, adjusting the size of the scaffold and reducing space occupation when not in use. Two positioning rods 8 are inserted between the two frame bodies 1. Each of the two frame bodies 1 has corresponding insertion holes 9 on its sides that mate with the positioning rods 8. Each of the two positioning rods 8 has multiple positioning holes 10 inside. Positioning plates 11 are installed on the corresponding sides of each frame body 1 at the top of the insertion holes 9. Bolts 12 are threaded into the internal parts of the positioning plates 11. One end of the bolt 12 is inserted into one of the positioning holes 10. As the bolt 12 rotates, its other end is inserted into or removed from the positioning hole 10, facilitating the fixing of the positioning rods 8 and connecting the two frame bodies 1. Auxiliary frames 13 are installed on the corresponding sides of each frame body 1 at the top of the positioning plates 11. The auxiliary frame 13 provides support for the scaffolding, making its placement more stable. An movable hole 14 is provided inside the auxiliary frame 13, aligned with the positioning rod 8. The inner diameter of the movable hole 14 is larger than the outer diameter of the positioning rod 8, preventing obstruction of its passage. Guardrails 15 are installed at one end of the first plate 31 and the second plate 32, between two adjacent limiting tubes 2, to protect workers. Multiple threaded holes 4 are provided on corresponding sides inside the two frames 1. Multiple climbing rods 5 are threaded onto the inner sides of both frames 1, facilitating climbing. Each climbing rod 5 includes a first rod body 51. The first rod 51 is internally connected to a second rod 52. One end of both the first rod 51 and the second rod 52 is fixedly connected to a threaded post 53 that mates with the threaded hole 4. The threaded connection structure allows the threaded post 53 to be fixed or separated from the threaded hole 4 by the rotation and sliding of the first rod 51 and the second rod 52, facilitating the replacement of the climbing rod 5. Support rods 6 are inserted into the interior of each of the four limiting tubes 2. Protective nets 7 are connected to the top of the four support rods 6, which facilitates the protection of the scaffold from above and intercepts falling objects, thus preventing workers from being injured. The plug-in structure also allows the support rods 6 to be separated from the limiting tubes 2 and disassembled.
[0018] In summary, this easy-to-climb construction scaffolding, when in use, involves passing the limiting tubes 2 at the top of the two frame bodies 1 through the mounting holes 33 on both sides of the first plate 31 and the second plate 32, respectively, to support the support plate 3. Then, the two positioning rods 8 are passed through the insertion holes 9 on both sides of the two frame bodies 1, and the bolts 12 connecting the internal threads of the positioning plates 11 on both sides of the two frame bodies 1 are rotated. As the bolts 12 rotate, one end of each bolt is inserted into the corresponding positioning hole 10 inside the positioning rod 8, thus fixing the positioning rod 8 and connecting the two frame bodies 1 together. Multiple climbing joints are then used on the inner sides of the two frame bodies 1. Climbing pole 5 allows for climbing. Since the threaded posts 53 at both ends of the multiple climbing poles 5 are threadedly connected to the multiple threaded holes 4 on the inner side of the frame 1, and the first pole body 51 and the second pole body 52 are slidably connected, by rotating and sliding the first pole body 51 and the second pole body 52 respectively, the threaded posts 53 at one end of the first pole body 51 and the second pole body 52 are pulled out from the threaded holes 4 and separated from the frame 1. Damaged climbing poles 5 are disassembled. As needed, multiple support poles 6 are inserted into the multiple limiting tubes 2 at the top of the support plate 3, so that the protective nets 7 at the top of the multiple support poles 6 are opened.
[0019] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.
Claims
1. A construction scaffold that is easy to climb, comprising two frame bodies (1), characterized in that: Limiting tubes (2) are installed on the corresponding sides of the top of the two frames (1). Support plates (3) are sleeved on the outer sides of the four limiting tubes (2). Multiple threaded holes (4) are opened on the corresponding sides inside the two frames (1). Multiple climbing rods (5) are threadedly connected to the inner sides of the two frames (1). Each climbing rod (5) includes a first rod body (51). A second rod body (52) is slidably connected inside the first rod body (51). A threaded post (53) that mates with the threaded hole (4) is fixedly connected to one end of the first rod body (51) and the second rod body (52). A support rod (6) is inserted into the inside of each of the four limiting tubes (2). A protective net (7) is connected to the top of each of the four support rods (6).
2. The scaffolding for easy climbing in construction as described in claim 1, characterized in that: Two positioning rods (8) are inserted between the two frames (1). The two frames (1) have corresponding holes (9) on their respective sides that cooperate with the positioning rods (8). The two positioning rods (8) have multiple positioning holes (10) inside.
3. The scaffolding for easy climbing in construction as described in claim 2, characterized in that: Positioning plates (11) are installed on both sides of the two frames (1) and on the top of the insertion holes (9). The internal threads of the positioning plates (11) are connected to bolts (12), one end of which is inserted into one of the positioning holes (10).
4. The scaffolding for easy climbing in construction as described in claim 1, characterized in that: The support plate (3) includes a first plate (31), and a second plate (32) is slidably connected inside the first plate (31). The first plate (31) and the second plate (32) are provided with mounting holes (33) that cooperate with the limiting tube (2) on their corresponding sides.
5. A construction scaffold that is easy to climb according to claim 4, characterized in that: Guardrails (15) are installed at one end of the first plate (31) and the second plate (32) and between two adjacent limiting tubes (2).
6. A construction scaffold that is easy to climb according to claim 3, characterized in that: Auxiliary frames (13) are installed on both sides of the two frames (1) and on the top of the positioning plate (11). The auxiliary frames (13) have movable holes (14) inside. The movable holes (14) are aligned with the positioning rod (8). The inner diameter of the movable holes (14) is larger than the outer diameter of the positioning rod (8).
Citation Information
Patent Citations
Building construction scaffold convenient to climb
CN218912158U