[0004]上述专利存在以下不足:该装置可以通过拉动定位圆环将围网本体拉出,并定位在合适的位置,可以达到快速布置施工围网的效果,但是该装置布置时,软质围网拉伸过长,且在大风天气的情况下会十分影响防护稳定性,这样无法有效保障工程施工中的作业安全
1.本实用新型的一种可折叠式施工围网,其可以通过底杆的端部和第二连接组件通过活动螺栓进行固定安装,然后通过第一安装板和第二安装板上的预留孔与地面基础进行固定,之后将底杆另一端与斜撑杆的一端通过活动螺栓进行固定安装,最后将斜撑杆的另一端与第一连接组件上开设的匹配卡槽初步卡接,然后通过活动螺栓将斜撑杆和第一连接组件固定安装,以此可以将围网主体安装完成。而当遇到台风天气时,可以将底杆的两端连接的螺栓以及第一安装板上螺栓的拆卸后,即可快速实现围网的放倒。本装置通过简化了现场操作,提升了设备的环境适应性和安全性。
Smart Images

Figure CN224834466U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the technical field of construction safety protection equipment, specifically relating to a foldable construction fence. Background Technology
[0002] Foldable construction fencing is mainly used in municipal engineering projects, construction sites, temporary activity areas, and other areas requiring rapid establishment of safety barriers and protection. Its core advantages lie in its convenience and efficiency—adopting a hinged or modular design, it can be easily unfolded or folded like a "screen," greatly saving transportation, storage space, and installation time. At the same time, it has good reusability, adapting to the needs of frequent site changes, ensuring on-site safety and civilized construction, improving management efficiency, and reducing overall costs.
[0003] A search revealed Chinese patent publication number CN219548578U, which discloses a construction fencing device, comprising a main body. The main body includes a housing, inside which a mounting rod is installed via bearings. A fencing body is wound around the outer surface of the mounting rod, and the fencing body extends to the outside of the housing through a through groove. This utility model incorporates a housing, mounting rod, fencing body, positioning ring, and spiral spring body.
[0004] The above-mentioned patent has the following shortcomings: the device can pull out the net body by pulling the positioning ring and position it in a suitable position, which can achieve the effect of quickly setting up the construction net. However, when the device is set up, the soft net is stretched too long, and in windy weather, it will greatly affect the protective stability, thus failing to effectively guarantee the safety of the operation during the construction.
[0005] To address this, a foldable construction fence is proposed, which can maintain protective stability even in windy weather, and can be quickly laid down during typhoon weather, achieving a reliable and convenient effect during construction. Utility Model Content
[0006] The technical problem to be solved by this utility model is to overcome the above-mentioned defects and provide a device that can maintain the stability of protection in windy weather and can quickly lower the netting in typhoon weather.
[0007] To address one or more of the above-mentioned defects or improvement needs of the existing technology, this utility model provides a foldable construction fence, comprising two adjacent fence bodies. A first connecting component is fixedly installed on the center of the back of each fence body. One end of the first connecting component has a matching slot, in which a diagonal brace is engaged. The first connecting component and the diagonal brace are fixedly connected by a movable bolt. The end of the diagonal brace is fixedly connected to a bottom rod by a movable bolt. The end of the bottom rod is fixedly connected to a second connecting component by a movable bolt. One side of the second connecting component is fixedly connected to the bottom of the back of the fence body. A first mounting plate is fixedly installed on each side of the second connecting component. Multiple second mounting plates are fixedly installed on each side of the bottom rod. Multiple reserved holes are opened on the surface of the first and second mounting plates.
[0008] In some embodiments, a first sleeve is fixedly installed on one side of the main body of the fence, and a second sleeve, a snap-fit sleeve, and a bolt sleeve are fixedly installed on the other side of the main body of the fence.
[0009] In some embodiments, the snap-fit cylinders on the corresponding sides of the two mesh bodies are detachably snapped onto the surface of the first sleeve, and the second sleeve and the bolt cylinder are located at the top and bottom of the first sleeve, respectively, and the holes inside the first sleeve, the second sleeve and the bolt cylinder are interconnected.
[0010] In some embodiments, the inner walls of the second sleeve and the first sleeve are engaged with fixing nails, and a lead screw is fixedly installed at the bottom of the fixing nail. The surface of the lead screw is fixedly connected to the inner wall of the bolt sleeve by threads.
[0011] In some embodiments, a counterweight cavity is provided inside the main body of the fence, and an adding cylinder is fixedly installed on one side of the top of the main body of the fence, and the interior of the adding cylinder communicates with the counterweight cavity.
[0012] In some embodiments, the inner wall of the adding cylinder is detachably connected to a bolt post by means of threads, and a first rubber cap is fixedly installed on the top of the bolt post.
[0013] In some embodiments, a release port is provided at the bottom front of the main body of the enclosure.
[0014] In some embodiments, a second rubber cap is detachably snapped onto the inner wall of the release port, and a handle is fixedly installed on one side of the second rubber cap.
[0015] In summary, the technical solutions conceived by this invention have the following beneficial effects compared with the prior art: 1. This utility model discloses a foldable construction fence, which can be fixedly installed by means of movable bolts at the end of the base pole and the second connecting component. Then, it is fixed to the ground foundation through pre-drilled holes on the first and second mounting plates. Next, the other end of the base pole is fixed to one end of the diagonal brace using movable bolts. Finally, the other end of the diagonal brace is initially engaged with the matching slot on the first connecting component, and then the diagonal brace and the first connecting component are fixedly installed using movable bolts, thus completing the installation of the main body of the fence. In the event of a typhoon, the fence can be quickly lowered by removing the bolts connecting both ends of the base pole and the bolts on the first mounting plate. This device simplifies on-site operation and improves the environmental adaptability and safety of the equipment.
[0016] 2. This utility model discloses a foldable construction fence, which initially fixes two fence main bodies by snapping together a first sleeve and a snap-fit sleeve on one side. Then, fixing nails are inserted into the second and first sleeves to initially connect the two fence main bodies. Finally, rotating the fixing nails connects the threaded rod at the bottom of the fixing nail to the bolt sleeve via threads, thus finally fixing the two fence main bodies. This connection method not only enables rapid splicing between fence units but also allows for free adjustment of the angle between the two fence main bodies, enabling the fence to adapt well to complex and varied terrain conditions at construction sites and increasing the practicality of the device.
[0017] 3. This utility model discloses a foldable construction fence. The addition cylinder is opened by rotating the first rubber cap, allowing water to be injected into the counterweight cavity within the fence body, thus achieving counterweight adjustment. When it is necessary to reduce the counterweight, the release port can be opened by gripping the handle and pulling open the second rubber cap to continue releasing water, thereby reducing the counterweight. This method of adjusting the counterweight solves the problems of bulkiness and inconvenience in handling caused by traditional fences using solid counterweight materials such as sandbags or concrete blocks, achieving flexible counterweight adjustment and facilitating transportation and storage. Attached Figure Description
[0018] Figure 1 This is a three-dimensional structural diagram of a foldable construction fence according to an embodiment of this utility model; Figure 2 This is a three-dimensional structural diagram of a foldable construction fence without diagonal bracing in an embodiment of this utility model. Figure 3 This is a cross-sectional view of a foldable construction fence according to an embodiment of this utility model; Figure 4 This is a three-dimensional structural diagram of the first rubber cover of a foldable construction fence according to an embodiment of this utility model; Figure 5This is a three-dimensional structural diagram of the second rubber cover of a foldable construction fence according to an embodiment of this utility model.
[0019] In all the accompanying drawings, the same reference numerals denote the same technical features, specifically: 1 main body of the enclosure, 2 first connecting component, 3 diagonal brace, 4 bottom rod, 5 second connecting component, 6 first mounting plate, 7 second mounting plate, 8 reserved hole, 9 first sleeve, 10 second sleeve, 11 snap-fit sleeve, 12 bolt sleeve, 13 fixing nail, 14 threaded rod, 15 adding sleeve, 16 first rubber cap, 17 bolt post, 18 release port, 19 second rubber cap, 20 handle, 21 matching slot, 22 counterweight cavity. Detailed Implementation
[0020] To make the objectives, technical solutions, and advantages of this utility model clearer, the present utility model will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain this utility model and are not intended to limit this utility model.
[0021] Furthermore, the technical features involved in the various embodiments of this utility model described below can be combined with each other as long as they do not conflict with each other.
[0022] Please refer to Figure 1-5 A foldable construction fence includes two adjacent fence bodies 1. A first connecting component 2 is fixedly installed on the center of the back of each fence body 1. One end of the first connecting component 2 has a matching slot 21, in which a diagonal brace 3 is engaged. The first connecting component 2 and the diagonal brace 3 are fixedly connected by a movable bolt. The end of the diagonal brace 3 is fixedly connected to a bottom rod 4 by a movable bolt. The end of the bottom rod 4 is fixedly connected to a second connecting component 5 by a movable bolt. One side of the second connecting component 5 is fixedly connected to the bottom of the back of the fence body 1. A first mounting plate 6 is fixedly installed on each side of the second connecting component 5. Multiple second mounting plates 7 are fixedly installed on each side of the bottom rod 4. Multiple reserved holes 8 are opened on the surface of the first mounting plate 6 and the second mounting plate 7.
[0023] During installation, the end of the base rod 4 and the second connecting assembly 5 are fixed in place with movable bolts. Then, they are fixed to the ground foundation through the pre-drilled holes 8 on the first mounting plate 6 and the second mounting plate 7. Next, the other end of the base rod 4 is fixed to one end of the diagonal brace 3 with movable bolts. Finally, the other end of the diagonal brace 3 is initially engaged with the matching slot 21 on the first connecting assembly 2, and then the diagonal brace 3 and the first connecting assembly 2 are fixed in place with movable bolts. This completes the installation of the main body 1 of the fencing. In case of typhoon weather, the fencing can be quickly lowered by removing the bolts connecting both ends of the base rod 4 and the bolts on the first mounting plate 6. This device simplifies on-site operation and improves the environmental adaptability and safety of the equipment.
[0024] In this embodiment, a first sleeve 9 is fixedly installed on one side of the main body 1 of the fencing, and a second sleeve 10, a snap-fit sleeve 11, and a bolt sleeve 12 are fixedly installed on the other side of the main body 1 of the fencing. The snap-fit sleeves 11 on the corresponding sides of the two main bodies 1 of the fencing are detachably snapped onto the surface of the first sleeve 9, and the second sleeve 10 and the bolt sleeve 12 are located at the top and bottom of the first sleeve 9, respectively. The holes inside the first sleeve 9, the second sleeve 10, and the bolt sleeve 12 are interconnected. Fixing nails 13 are snapped onto the inner walls of the second sleeve 10 and the first sleeve 9, and a threaded rod 14 is fixedly installed at the bottom of the fixing nail 13. The surface of the threaded rod 14 is fixedly connected to the inner wall of the bolt sleeve 12 by threads.
[0025] This device uses a first sleeve 9 and a snap-fit sleeve 11 on one side of two main fence units 1 to achieve initial fixation. Then, a fixing nail 13 is inserted into the second sleeve 10 and the first sleeve 9 to initially connect the two fence units 1. Finally, rotating the fixing nail 13 connects the threaded rod 14 at the bottom of the fixing nail 13 to the bolt sleeve 12 via threads, thus finally fixing the two fence units 1. This connection method not only enables rapid splicing between fence units but also allows for free adjustment of the included angle between the two fence units 1, enabling the fence to adapt well to complex and varied terrain conditions at construction sites and increasing the device's practicality.
[0026] In this embodiment, a counterweight cavity 22 is provided inside the main body 1 of the enclosure. An adding cylinder 15 is fixedly installed on one side of the top of the main body 1 of the enclosure, and the interior of the adding cylinder 15 communicates with the counterweight cavity 22. A bolt post 17 is detachably connected to the inner wall of the adding cylinder 15 by means of a thread. A first rubber cap 16 is fixedly installed on the top of the bolt post 17. A release port 18 is provided at the bottom of the front of the main body 1 of the enclosure. A second rubber cap 19 is detachably snapped onto the inner wall of the release port 18. A handle 20 is fixedly installed on one side of the second rubber cap 19.
[0027] This device allows for the addition of water to the counterweight cavity 22 within the main body of the fence 1 by rotating the first rubber cap 16. When the counterweight needs to be reduced, the release port 18 can be opened by pulling the handle 20 to release water and further reduce the weight. This method of adjusting the counterweight solves the problems of bulkiness and inconvenience associated with traditional fences using solid counterweight materials such as sandbags or concrete blocks, enabling flexible adjustment of the counterweight and facilitating transportation and storage.
[0028] In this example, a foldable construction fence is used. Initial fixation is achieved by engaging the first sleeve 9 and the snap-fit sleeve 11 on one side of the two main fence bodies 1. Then, fixing nails 13 are inserted into the second sleeve 10 and the first sleeve 9 and rotated to connect the threaded rod 14 at the bottom of the fixing nail 13 to the bolt sleeve 12 via threads, thus finally fixing the two main fence bodies 1. This sequential connection can enclose the construction area. The first connecting component 2 and the diagonal brace 3, as well as the second connecting component 5 and the base rod 4, are then fixed together using movable bolts. The ends of the base rod 4 and the diagonal brace 3 are then fixed together using movable bolts. Finally, the fence is fixed to the ground foundation through the pre-drilled holes 8 on the first mounting plate 6 and the second mounting plate 7. In case of typhoon weather, the fence can be quickly lowered by simply removing the bolts connecting both ends of the base rod 4 and the bolts on the first mounting plate 6.
[0029] The above description is merely a specific embodiment of this utility model, but the protection scope of this utility model is not limited thereto. Any person skilled in the art can easily conceive of various variations or substitutions within the technical scope disclosed in this utility model, and these should all be included within the protection scope of this utility model. Therefore, the protection scope of this utility model should be determined by the protection scope of the claims.
Claims
1. A foldable construction fence, characterized in that: The enclosure includes two adjacent enclosure bodies (1). A first connecting component (2) is fixedly installed on the middle of the back of each enclosure body (1). A matching slot (21) is provided at one end of the first connecting component (2). A diagonal brace (3) is engaged in the matching slot (21). The first connecting component (2) and the diagonal brace (3) are fixedly connected by a movable bolt. A bottom rod (4) is fixedly connected to the end of the diagonal brace (3) by a movable bolt. A second connecting component (5) is fixedly connected to the end of the bottom rod (4) by a movable bolt. One side of the second connecting component (5) is fixedly connected to the bottom of the back of the enclosure body (1). A first mounting plate (6) is fixedly installed on each side of the second connecting component (5). Multiple second mounting plates (7) are fixedly installed on each side of the bottom rod (4). Multiple reserved holes (8) are provided on the surface of the first mounting plate (6) and the second mounting plate (7).
2. The foldable construction fence according to claim 1, characterized in that: A first sleeve (9) is fixedly installed on one side of the main body of the fence (1), and a second sleeve (10), a snap-fit sleeve (11), and a bolt sleeve (12) are fixedly installed on the other side of the main body of the fence (1).
3. The foldable construction fence according to claim 2, characterized in that: The snap-fit cylinders (11) on the corresponding sides of the two main bodies of the enclosure (1) are detachably snapped onto the surface of the first sleeve (9), and the second sleeve (10) and the bolt cylinder (12) are located at the top and bottom of the first sleeve (9) respectively, and the holes inside the first sleeve (9), the second sleeve (10) and the bolt cylinder (12) are connected.
4. A foldable construction fence according to claim 2, characterized in that: The inner walls of the second sleeve (10) and the first sleeve (9) are fitted with fixing nails (13), and the bottom of the fixing nails (13) is fixedly installed with a screw rod (14). The surface of the screw rod (14) is fixedly connected to the inner wall of the bolt cylinder (12) by threads.
5. A foldable construction fence according to claim 1, characterized in that: The main body of the enclosure (1) has a counterweight cavity (22) inside. An adding cylinder (15) is fixedly installed on one side of the top of the main body of the enclosure (1), and the inside of the adding cylinder (15) is connected to the counterweight cavity (22).
6. A foldable construction fence according to claim 5, characterized in that: The inner wall of the adding cylinder (15) is detachably connected to a bolt post (17) by a thread, and a first rubber cap (16) is fixedly installed on the top of the bolt post (17).
7. A foldable construction fence according to claim 1, characterized in that: The main body of the enclosure (1) has a release port (18) at the bottom front.
8. A foldable construction fence according to claim 7, characterized in that: The inner wall of the release port (18) is detachably snapped with a second rubber cap (19), and a handle (20) is fixedly installed on one side of the second rubber cap (19).