[0002]目前,对于在新型管道桁架预应力板施工过程中支撑体系的实际应用中,由于新型钢管桁架预应力板下无需铺设模板,采用传统支撑体系总会出现现浇板带与预制板拼接处产生错台的问题,为了解决该问题,研究一种新型装配式钢管桁架预应力板支撑体系势在必行
本实用新型构造简单、适用性强,在有限空间不足以设置独立支撑的情况下可以在竖向和水平向保证支撑体系的稳定性,本实用新型在新型钢管桁架预应力板带下,优化常规支撑体系,创新采用三脚架构件代替了板带支撑体系,本实用新型节省了板带 拟配立杆,减少了施工内容,提高了施工效率,具有很好的经济和社会效益,推广使用能够产生较好效果。
Smart Images

Figure CN224834492U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building construction technology, and in particular to a novel prestressed steel pipe truss support system. Background Technology
[0002] Currently, in the practical application of support systems during the construction of new type of prestressed steel pipe truss slabs, since no formwork is required under the new type of prestressed steel pipe truss slabs, the traditional support system always results in misalignment at the splicing point between the cast-in-place slab and the precast slab. In order to solve this problem, it is imperative to study a new type of prefabricated steel pipe truss prestressed slab support system. Utility Model Content
[0003] This application provides a novel prestressed steel pipe truss support system to solve the problems in the prior art.
[0004] To address the aforementioned technical problems, this application provides a novel prefabricated steel pipe truss prestressed slab support system, comprising: a support base, a vertical support rod disposed on the top of the support base, and a transverse support rod disposed between adjacent vertical support rod supports; a first tripod and a second tripod are symmetrically arranged between adjacent vertical support rods, the first tripod comprising a first vertical rod connected to the vertical support rod, a first diagonal rod connected to the first vertical rod, and a second vertical rod connected to the first diagonal rod, a first vertical brace disposed at the top center of the first diagonal rod, a first horizontal rod disposed at the top of the first vertical brace, the first horizontal rod and the first diagonal rod being fixedly connected to the second vertical rod, a first U-shaped placement groove disposed at the top of the second vertical rod, and a beam under formwork fixed in the first U-shaped placement groove.
[0005] In some embodiments of this application, the second tripod includes a third vertical rod connected to a vertical support rod, a second diagonal rod connected to the third vertical rod, and a fourth vertical rod connected to the second diagonal rod. A second vertical brace is provided at the top center of the second diagonal rod, and a second horizontal rod is provided at the top of the second vertical brace. The second horizontal rod and the second diagonal rod are both fixedly connected to the fourth vertical rod. A second U-shaped placement groove is provided at the top of the fourth vertical rod, and multiple steel pipes are placed in the second U-shaped placement groove.
[0006] In some embodiments of this application, a connecting rod is provided between adjacent second tripods in the longitudinal direction, and the two ends of the connecting rod in the length direction are respectively connected to the adjacent second tripods.
[0007] In some embodiments of this application, the steel pipe is provided as two pipes, which are Φ48.3×3.6mm fastener-type steel pipes.
[0008] In some embodiments of this application, both the second and fourth vertical rods are provided with disc buckles, and the connecting rod is fastened to the disc buckle of the fourth vertical rod.
[0009] In some embodiments of this application, the length of the connecting longitudinal rod is consistent with the spacing between adjacent vertical support rods.
[0010] Compared with the prior art, this utility model has the following features and beneficial effects: This utility model has a simple structure and strong applicability. In situations where limited space is insufficient to set up independent supports, it can ensure the stability of the support system in both vertical and horizontal directions. Under the prestressed steel pipe truss strip, this utility model optimizes the conventional support system and innovatively adopts a tripod structure to replace the strip support system. This utility model saves the need for matching uprights to the strip, reduces construction content, and improves construction efficiency. It has good economic and social benefits, and its widespread use can produce good results. Attached Figure Description
[0011] Figure 1 This is a schematic diagram of the main structure of an embodiment of this utility model; Figure 2 This is a top view of an embodiment of the present invention. Figure 3 This is a side view structural diagram of an embodiment of the present utility model.
[0012] In the diagram, 100 is the support base; 200 is the vertical support rod; 300 is the horizontal support rod; 400 is the first tripod; 410 is the first vertical rod; 420 is the first diagonal rod; 430 is the second vertical rod; 440 is the first vertical brace; 450 is the first U-shaped placement groove; 460 is the formwork under the beam; 500 is the second tripod; 510 is the third vertical rod; 520 is the second diagonal rod; 530 is the fourth vertical rod; 540 is the second vertical brace; 550 is the second U-shaped placement groove; 560 is the steel pipe; and 600 is the connecting longitudinal rod. Detailed Implementation
[0013] The specific embodiments of this utility model will be described in further detail below with reference to the accompanying drawings and examples. The following examples are used to illustrate this utility model, but are not intended to limit its scope.
[0014] In the description of this application, it should be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.
[0015] The terms "first" and "second" are used for descriptive purposes only and should not be construed as indicating or implying relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of this application, unless otherwise stated, "a plurality of" means two or more.
[0016] In the description of this application, it should be noted that, unless otherwise expressly specified and limited, the terms "installation," "connection," and "linking" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; and they can refer to the internal connection between two components. Those skilled in the art can understand the specific meaning of the above terms in this application based on the specific circumstances.
[0017] like Figure 1-3 As shown, according to some embodiments of this application, a novel precast steel pipe 560 truss prestressed plate support system includes: a support base 100, a vertical support rod 200 disposed on the top of the support base 100, and a transverse support rod 300 disposed between the supports of adjacent vertical support rods 200; a first tripod 400 and a second tripod 500 are symmetrically arranged between adjacent vertical support rods 200. The first tripod 400 includes a first vertical rod 410 connected to the vertical support rod 200, a first diagonal rod 420 connected to the first vertical rod 410, and a second vertical rod 430 connected to the first diagonal rod 420. A first vertical brace 440 is disposed at the top center of the first diagonal rod 420, and a first horizontal rod is disposed at the top of the first vertical brace 440. The first horizontal rod and the first diagonal rod 420 are both fixedly connected to the second vertical rod 430. A first U-shaped placement groove 450 is disposed at the top of the second vertical rod 430, and a beam lower formwork 460 is fixed in the first U-shaped placement groove 450.
[0018] It should be noted that the first tripod 400 is a three-section type that matches the original disc-lock scaffold foundation. The length of each section is 1 / 3 of the vertical support rod spacing 200 in this direction. The channel steel placed under the beam should be fixed in the first U-shaped placement groove 450 as the main keel supporting the formwork 460 under the beam.
[0019] According to some embodiments of this application, the second tripod 500 includes a third vertical rod 510 connected to the vertical support rod 200, a second diagonal rod 520 connected to the third vertical rod 510, and a fourth vertical rod 530 connected to the second diagonal rod 520. A second vertical support 540 is provided at the top center of the second diagonal rod 520, and a second horizontal rod is provided at the top of the second vertical support 540. Both the second horizontal rod and the second diagonal rod 520 are fixedly connected to the fourth vertical rod 530. A second U-shaped placement groove 550 is provided at the top of the fourth vertical rod 530, and a plurality of steel pipes 560 are placed in the second U-shaped placement groove 550.
[0020] It should be noted that the length of the second triangular frame should be determined based on the width of the cast-in-place slab strip and the width of the cast-in-place beam of the prestressed steel pipe truss 560 slab, so as to ensure that the second U-shaped placement groove 550 on the second triangular frame is in a strong support position to provide a working surface for the steel reinforcement and concrete on the slab, while not affecting the reinforcement of the beam side formwork; the double steel pipe 560 under the slab is used as the under-slab support keel on the second triangular frame.
[0021] According to some embodiments of this application, a connecting rod 600 is provided between longitudinally adjacent second tripods 500, and the two ends of the connecting rod 600 in the length direction are respectively connected to the adjacent second tripods 500.
[0022] According to some embodiments of this application, two steel pipes 560 are provided, and the steel pipes 560 are Φ48.3×3.6mm fastener-type steel pipes 560.
[0023] According to some embodiments of this application, both the second vertical rod 430 and the fourth vertical rod 530 are provided with disc buckles, and the connecting rod 600 is fastened to the disc buckle of the fourth vertical rod 530.
[0024] According to some embodiments of this application, the length of the connecting rod 600 is consistent with the spacing between the longitudinally adjacent vertical support rods 200.
[0025] According to some embodiments of this application, during installation, step one involves first erecting a foundation for the support system of the new prefabricated steel pipe 560 truss prestressed slab using a disc-lock scaffold. Then, according to the drawings, a first triangular frame and a first U-shaped placement groove 450 are used as the support system for the beam under-formwork 460. After fixing, the distance between the edge of the steel pipe 560 truss prestressed slab and the side formwork of the cast-in-place beam is measured to determine the required length of the second triangular frame under the cast-in-place slab. Step 2: After the second tripod is installed, it is connected and fixed along the Y direction using the connecting longitudinal rod 600. The double steel pipe 560 under the plate is used as the supporting keel under the plate. The double steel pipe 560 under the plate is fixed on the top support of the second tripod along the Y direction. Step 3: Adjust the height of the second tripod to ensure that the template surface is in horizontal contact with the 560 steel pipe truss prestressed plate, and insert the template under the 560 steel pipe truss prestressed plate.
[0026] In summary, this utility model relates to the field of building construction technology and discloses a novel precast steel pipe truss prestressed slab support system, comprising: a support base, a vertical support rod disposed on the top of the support base, and a transverse support rod disposed between adjacent vertical support rod supports; a first tripod and a second tripod are symmetrically arranged between adjacent vertical support rods, the first tripod including a first vertical rod connected to the vertical support rod, a first diagonal rod connected to the first vertical rod, and a second vertical rod connected to the first diagonal rod, a vertical brace is disposed at the top center of the first diagonal rod, a horizontal rod is disposed at the top of the vertical brace, both the horizontal rod and the diagonal rod are fixedly connected to the second vertical rod, a first U-shaped placement groove is disposed at the top of the second vertical rod, and a beam lower formwork is fixed in the first U-shaped placement groove. This utility model has a simple structure and strong applicability, and can ensure the stability of the support system in both vertical and horizontal directions when there is insufficient space to set up independent supports.
[0027] The above description is only a preferred embodiment of the present utility model. It should be noted that for those skilled in the art, several improvements and substitutions can be made without departing from the technical principles of the present utility model, and these improvements and substitutions should also be considered within the protection scope of the present utility model.
Claims
1. A novel precast steel pipe truss prestressed slab support system, comprising: A support base (100), a vertical support rod (200) disposed on the top of the support base (100), and a horizontal support rod (300) disposed between adjacent vertical support rods (200); characterized in that a first tripod (400) and a second tripod (500) are symmetrically arranged between adjacent vertical support rods (200), the first tripod (400) includes a first vertical rod (410) connected to the vertical support rod (200), a first diagonal rod (420) connected to the first vertical rod (410), and a second vertical rod (430) connected to the first diagonal rod (420), a first vertical brace (440) is disposed at the top center of the first diagonal rod (420), a first horizontal rod is disposed at the top of the first vertical brace (440), the first horizontal rod and the first diagonal rod (420) are both fixedly connected to the second vertical rod (430), and a first U-shaped support is disposed at the top of the second vertical rod (430). The first U-shaped placement groove (450) has a beam lower template (460) fixed inside it.
2. The novel prestressed steel pipe truss support system according to claim 1, characterized in that, The second tripod (500) includes a third vertical rod (510) connected to the vertical support rod (200), a second diagonal rod (520) connected to the third vertical rod (510), and a fourth vertical rod (530) connected to the second diagonal rod (520). A second vertical brace (540) is provided at the top center of the second diagonal rod (520), and a second horizontal bar is provided at the top of the second vertical brace (540). The second horizontal bar and the second diagonal rod (520) are both fixedly connected to the fourth vertical rod (530). A second U-shaped placement groove (550) is provided at the top of the fourth vertical rod (530), and multiple steel pipes (560) are placed in the second U-shaped placement groove (550).
3. The novel prestressed steel pipe truss support system according to claim 2, characterized in that, A connecting rod (600) is provided between adjacent second tripods (500) in the longitudinal direction, and the two ends of the connecting rod (600) in the length direction are respectively connected to the adjacent second tripods (500).
4. The novel prestressed steel pipe truss support system according to claim 2, characterized in that, Two steel pipes (560) are provided, and the steel pipes (560) are Φ48.3×3.6mm fastener-type steel pipes.
5. A novel precast steel pipe truss prestressed slab support system according to claim 3, characterized in that, Both the second vertical rod (430) and the fourth vertical rod (530) are provided with disc buckles, and the connecting vertical rod (600) is fastened to the disc buckle of the fourth vertical rod (530).
6. A novel precast steel pipe truss prestressed slab support system according to claim 3, characterized in that, The length of the connecting longitudinal rod (600) is consistent with the spacing between the adjacent vertical support rods (200) in the longitudinal direction.