Electric output shaft comprehensive testing fixture
Patent Information
- Application Number
- CN202522355010.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-06
- Publication Date
- 2026-10-09
- Estimated Expiration
- 2035-11-06
AI Technical Summary
传统的做法是工人使用游标卡尺分段测量每段轴的轴径以及长度,这种做法效率低下,耗费大量人力、时间,加大生产成本,而且工人人手测量容易出现测量误差,影响产品质量,如果被退回返工则要耗费时间及人力
[0005]根据本申请实施例所述的电动输出轴综合检具,至少具有如下有益效果:测量零件前先用标准件对外径测量组件和长度测量组件进行校对;然后将电动输出轴的第一轴段嵌入定位座的通孔内,使电动输出轴竖向放置于定位座上;基板相对于固定座滑动并到达限定位置,此时通过第一外径测量部和第二外径测量部分别对电动输出轴的第一轴径和第二轴径进行测量,以及通过第一长度测量部和第二长度测量部分别对电动输出轴的第一长度和第二长度进行测量。本申请实施例所述的电动输出轴综合检具,能够一次性对电动输出轴的第一轴径和第二轴径、以及第一长度和第二长度进行测量,无需人工进行一一测量,降低劳动强度,提高工作效率,提高测量的准确性。
Smart Images

Figure CN224838750U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of testing tools, and in particular to a comprehensive inspection tool for an electric output shaft. Background Technology
[0002] like Figure 8 The electric output shaft shown needs to be inspected and accepted after machining. Its first shaft diameter D1 and second shaft diameter D2, as well as its first length L1 and second length L2, need to be measured to determine if it is qualified. Traditionally, workers use vernier calipers to measure the shaft diameter and length of each section segment. This method is inefficient, consumes a lot of manpower and time, increases production costs, and manual measurement is prone to errors, affecting product quality. If the product is returned for rework, it will consume even more time and manpower. Utility Model Content
[0003] This application aims to address at least one of the technical problems existing in the prior art. To this end, this application proposes a comprehensive inspection tool for electric output shafts, which can measure the first and second shaft diameters, as well as the first and second lengths of the electric output shaft in one operation, eliminating the need for manual measurement, reducing labor intensity, improving work efficiency, and enhancing measurement accuracy.
[0004] The electric output shaft integrated inspection fixture according to the embodiments of this application includes: a base with a fixed seat; a base plate disposed on one side of the fixed seat, the base plate being slidable relative to the fixed seat, the base plate having a positioning seat for placing the electric output shaft, the positioning seat having a through hole, a first shaft segment of the electric output shaft being embedded in the through hole, and the positioning seat having a first clearance hole and a second clearance hole; and a measuring mechanism disposed on the fixed seat, the measuring mechanism including an outer diameter measuring component and a length measuring component, the outer diameter measuring component including a first outer diameter measuring part and a second outer diameter measuring part, the first outer diameter measuring part being adapted to the first clearance hole, the first outer diameter measuring part being used to measure a first shaft diameter of the electric output shaft, the second outer diameter measuring part being used to measure a second shaft diameter of the electric output shaft, and the length measuring component including a first length measuring part and a second length measuring part, the first length measuring part being adapted to the second clearance hole, the first length measuring part being used to measure a first length of the electric output shaft, and the second length measuring part being used to measure a second length of the electric output shaft.
[0005] The integrated inspection fixture for electric output shafts according to the embodiments of this application has at least the following beneficial effects: Before measuring the part, the outer diameter measuring component and the length measuring component are calibrated using standard parts; then, the first shaft segment of the electric output shaft is embedded into the through hole of the positioning seat, so that the electric output shaft is placed vertically on the positioning seat; the base plate slides relative to the fixed seat and reaches a defined position, at which point the first shaft diameter and the second shaft diameter of the electric output shaft are measured by the first outer diameter measuring part and the second outer diameter measuring part, respectively, and the first length and the second length of the electric output shaft are measured by the first length measuring part and the second length measuring part, respectively. The integrated inspection fixture for electric output shafts according to the embodiments of this application can measure the first shaft diameter and the second shaft diameter, as well as the first length and the second length of the electric output shaft, in one operation, eliminating the need for manual measurement, reducing labor intensity, improving work efficiency, and increasing measurement accuracy.
[0006] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the first outer diameter measuring part includes a first measuring unit, a second measuring unit, and a first measuring gauge. The first measuring unit and the second measuring unit cooperate to measure the first shaft diameter of the electric output shaft. The first measuring unit is provided with a first measuring rod, and the first measuring gauge is provided in the second measuring unit. The head of the first measuring gauge abuts against the end of the first measuring rod.
[0007] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the first measuring unit includes a mounting block, a bracket, and a first abutment block. The mounting block is disposed on the fixed base, and the bracket is disposed on the side of the mounting block away from the fixed base. The two ends of the mounting block and the bracket are respectively connected by a first spring and a second spring. The first spring and the second spring are respectively used to support and reset the bracket. The first abutment block is disposed on the bracket, and the first measuring rod is disposed on the first abutment block.
[0008] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the structure of the second measuring unit is the same as that of the first measuring unit, and the first measuring gauge is disposed on the first abutment block of the second measuring unit.
[0009] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the first measuring unit and the second measuring unit are adjustablely mounted on the fixed base, so that the first measuring unit and the second measuring unit can be close to each other or far apart from each other.
[0010] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the structure of the second outer diameter measuring part is the same as the structure of the first outer diameter measuring part.
[0011] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the first length measuring unit includes a third measuring unit, a fourth measuring unit, and a second measuring gauge. The third measuring unit and the fourth measuring unit cooperate to measure the first length of the electric output shaft. The third measuring unit is provided with a second measuring rod, and the second measuring gauge is provided in the fourth measuring unit. The head of the second measuring gauge abuts against the second measuring rod.
[0012] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the second length measuring part includes a fifth measuring unit and a third measuring gauge. The fifth measuring unit is used to measure the second length of the electric output shaft. The fifth measuring unit is provided with a measuring block. The third measuring gauge is disposed on the fixed base, and the head of the third measuring gauge abuts against the measuring block.
[0013] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the base is provided with a translation component, and the base plate is disposed on the translation component.
[0014] According to the electric output shaft integrated inspection fixture described in the embodiments of this application, the base is disposed on a placement seat, and the placement seat is used to place standard parts.
[0015] Additional aspects and advantages of this application will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of this application. Attached Figure Description
[0016] The present application will be further described below with reference to the accompanying drawings and embodiments, wherein: Figure 1 This is a schematic diagram of the first structure of the electric output shaft integrated inspection fixture according to an embodiment of this application; Figure 2 This is a schematic diagram of the second structure of the electric output shaft integrated inspection fixture according to an embodiment of this application; Figure 3 This is a schematic diagram of the positioning seat in the electric output shaft integrated inspection fixture according to an embodiment of this application; Figure 4 This is a schematic diagram of the structure of the first outer diameter measuring part in the electric output shaft integrated inspection fixture of this application embodiment; Figure 5 This is a schematic diagram of the structure of the first measuring unit in the electric output shaft integrated inspection fixture of this application embodiment; Figure 6 This is a schematic diagram of the structure of the first length measuring part in the electric output shaft integrated inspection fixture of this application embodiment; Figure 7 This is a schematic diagram of the structure of the second length measuring unit in the electric output shaft integrated inspection fixture of this application embodiment; Figure 8This is a schematic diagram of the electric output shaft in the electric output shaft integrated inspection fixture of this application embodiment.
[0017] Figure label: Base 100; Fixing seat 110; Translation assembly 130; Placement seat 140; Base plate 200; Positioning seat 210; Through hole 220; First clearance hole 230; Second clearance hole 240; First outer diameter measuring part 310; First measuring unit 311; Second measuring unit 312; First measuring gauge 313; First measuring rod 314; Mounting block 315; Bracket 316; First abutment block 317; First spring piece 318; Second spring piece 319; Second outer diameter Measuring unit 320; First length measuring unit 330; Third measuring unit 331; Fourth measuring unit 332; Second measuring gauge 333; Second measuring rod 334; Second abutment block 335; Third abutment block 336; Second length measuring unit 340; Fifth measuring unit 341; Third measuring gauge 342; Measuring block 343; Fourth abutment block 344; Electric output shaft 400; First shaft diameter D1; Second shaft diameter D2; First length L1; Second length L2. Detailed Implementation
[0018] The embodiments of this application are described in detail below. Examples of these embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals denote the same or similar elements or elements having the same or similar functions throughout. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain this application, and should not be construed as limiting this application.
[0019] In the description of this application, it should be understood that the orientation descriptions, such as up, down, front, back, left, right, etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings. They are only for the convenience of describing this application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this application.
[0020] In the description of this application, "several" means one or more, "more than" means two or more, "greater than," "less than," and "exceeding" are understood to exclude the stated number, while "above," "below," and "within" are understood to include the stated number. The use of "first" and "second" in the description is merely for distinguishing technical features and should not be construed as indicating or implying relative importance, or implicitly indicating the number of indicated technical features, or implicitly indicating the order of the indicated technical features.
[0021] In the description of this application, unless otherwise expressly defined, terms such as "setting," "installation," and "connection" should be interpreted broadly. Those skilled in the art can reasonably determine the specific meaning of these terms in this application based on the specific content of the technical solution. In the description of this application, the terms "one embodiment," "some embodiments," "illustrative embodiment," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described can be combined in any suitable manner in one or more embodiments or examples. In the description of this specification, the terms "one embodiment," "some embodiments," "illustrative embodiment," "example," "specific example," or "some examples," etc., refer to specific features, structures, materials, or characteristics described in connection with that embodiment or example, which are included in at least one embodiment or example of this application. In this specification, the illustrative expressions of the above terms do not necessarily refer to the same embodiment or example. Furthermore, the specific features, structures, materials, or characteristics described may be combined in any suitable manner in one or more embodiments or examples.
[0022] Reference Figures 1 to 7 This application provides a comprehensive inspection fixture for an electric output shaft, comprising: a base 100 with a fixed seat 110; a base plate 200 disposed on one side of the fixed seat 110, the base plate 200 being slidable relative to the fixed seat 110, the base plate 200 having a positioning seat 210 for placing an electric output shaft 400, the positioning seat 210 having a through hole 220, a first shaft segment of the electric output shaft 400 being embedded in the through hole 220, the positioning seat 210 having a first clearance hole 230 and a second clearance hole 240; and a measuring mechanism disposed on the fixed seat 110, the measuring mechanism including an outer diameter measuring component and a length measuring component, the outer diameter measuring component including a first outer diameter measuring part. The first outer diameter measuring unit 310 and the second outer diameter measuring unit 320 are adapted to the first clearance hole 230. The first outer diameter measuring unit 310 is used to measure the first shaft diameter D1 of the electric output shaft 400, and the second outer diameter measuring unit 320 is used to measure the second shaft diameter D2 of the electric output shaft 400. The length measuring assembly includes a first length measuring unit 330 and a second length measuring unit 340. The first length measuring unit 330 is adapted to the second clearance hole 240. The first length measuring unit 330 is used to measure the first length L1 of the electric output shaft 400, and the second length measuring unit 340 is used to measure the second length L2 of the electric output shaft 400.
[0023] Before measuring the parts, the outer diameter measuring assembly and length measuring assembly are calibrated using standard parts. Then, the first shaft segment of the electric output shaft 400 is inserted into the through hole 220 of the positioning seat 210, so that the electric output shaft 400 is placed vertically on the positioning seat 210. The base plate 200 slides relative to the fixed seat 110 and reaches the defined position. At this time, the first shaft diameter D1 and the second shaft diameter D2 of the electric output shaft 400 are measured by the first outer diameter measuring part 310 and the second outer diameter measuring part 320, respectively, and the first length L1 and the second length L2 of the electric output shaft 400 are measured by the first length measuring part 330 and the second length measuring part 340, respectively. The comprehensive inspection fixture for the electric output shaft 400 described in this application embodiment can measure the first shaft diameter D1 and the second shaft diameter D2, as well as the first length L1 and the second length L2 of the electric output shaft 400 at one time, without the need for manual measurement, reducing labor intensity, improving work efficiency, and improving measurement accuracy.
[0024] Reference Figure 1 and Figure 2 The base 100 is equipped with a translation component 130, and the substrate 200 is disposed on the translation component 130. The translation component 130 drives the substrate 200 to slide relative to the fixed seat 110, resulting in a simple structure and easy operation. Further, the translation component 130 includes a slide rail, a slider, and a drive unit. The slide rail is disposed on the base 100, the slider is disposed on the substrate 200, and the slider is connected to the slide rail. The drive unit is connected to the substrate 200. Specifically, the drive unit includes a rotating shaft, a rocker arm, and a connecting rod. The base 100 is provided with a support seat, the rotating shaft is rotatably disposed on the support seat, one end of the rocker arm is fixedly connected to the rotating shaft, one end of the connecting rod is connected to the other end of the rocker arm via a pin, and the other end of the connecting rod is connected to the substrate 200. The rotating shaft is provided with a handle. By operating the handle to rotate the rotating shaft, the rocker arm drives the connecting rod to move, causing the substrate 200 to slide along the slide rail, resulting in a simple structure and easy operation. Of course, the drive unit can also be directly configured as a cylinder, a lead screw and nut, or a gear and rack; this application does not limit this.
[0025] It should be noted that the translation component 130 can also be connected to the fixed base 110. The translation component 130 drives the fixed base 110 to move, so that the measuring mechanism is close to the electric output shaft 400 and performs measurement.
[0026] Furthermore, the base 100 is disposed on the placement seat 140, which is used to place standard parts, making operation simpler and improving work efficiency.
[0027] Reference Figure 4The first outer diameter measuring unit 310 includes a first measuring unit 311, a second measuring unit 312, and a first measuring gauge 313. The first measuring unit 311 and the second measuring unit 312 cooperate to measure the first shaft diameter D1 of the electric output shaft 400. The first measuring unit 311 is provided with a first measuring rod 314, and the first measuring gauge 313 is disposed in the second measuring unit 312. The head of the first measuring gauge 313 abuts against the end of the first measuring rod 314. Specifically, the first measuring unit 311 and the second measuring unit 312 abut against the electric output shaft 400 through a first clearance hole 230 to realize the measurement of the first shaft diameter D1 of the electric output shaft 400. The structure is simple and the operation is convenient.
[0028] Reference Figure 5 Specifically, the first measuring unit 311 includes a mounting block 315, a bracket 316, and a first abutment block 317. The mounting block 315 is disposed on the fixed base 110, and the bracket 316 is disposed on the side of the mounting block 315 away from the fixed base 110. The two ends of the mounting block 315 and the bracket 316 are connected by a first spring piece 318 and a second spring piece 319, respectively. The first spring piece 318 and the second spring piece 319 are used to support and reset the bracket 316, respectively. The first abutment block 317 is disposed on the bracket 316, and the first measuring rod 314 is disposed on the first abutment block 317. The structure of the second measuring unit 312 is the same as that of the first measuring unit 311, and the first measuring gauge 313 is disposed on the first abutment block 317 of the second measuring unit 312. The first contact blocks 317 of the first measuring unit 311 and the second measuring unit 312 respectively contact the electric output shaft 400. At this time, the displacement change of the first measuring rod 314 is transmitted to the meter head of the first measuring meter 313, thereby realizing the measurement of the first shaft diameter D1 of the electric output shaft 400.
[0029] It is conceivable that the first measuring unit 311 and the second measuring unit 312 are adjustablely mounted on the fixed base 110, allowing them to move closer or further apart, thus adjusting the distance between them. This adapts to electric output shafts 400 with different shaft diameters, expanding the applicability. The fixed base 110 is provided with a sliding groove containing a slotted hole. The mounting block 315 is embedded in the sliding groove and connected to the mounting block 315 via a locking element passing through the slotted hole. This structure enables rapid positioning of the mounting block 315, improving installation efficiency.
[0030] In this embodiment, the structure of the second outer diameter measuring unit 320 is the same as that of the first outer diameter measuring unit 310. By measuring the second shaft diameter D2 of the electric output shaft 400 using the second outer diameter measuring unit 320, the accuracy of the measurement can be improved.
[0031] Reference Figure 6 The first length measuring unit 330 includes a third measuring unit 331, a fourth measuring unit 332, and a second measuring gauge 333. The third measuring unit 331 and the fourth measuring unit 332 cooperate to measure the first length L1 of the electric output shaft 400. The third measuring unit 331 is provided with a second measuring rod 334, and the second measuring gauge 333 is provided on the fourth measuring unit 332. The head of the second measuring gauge 333 abuts against the second measuring rod 334. The third measuring unit 331 is provided with a second abutment block 335, and the fourth measuring unit 332 is provided with a third abutment block 336. Specifically, after the substrate 200 slides relative to the fixed base 110 and reaches the defined position, the second abutment block 335 enters the positioning sleeve along the second clearance hole 240 and abuts against the shaft end face of the electric output shaft 400, and the third abutment block 336 abuts against the other end face of the electric conveying shaft. The displacement change of the second measuring rod 334 is displayed by the second measuring gauge 333, thereby realizing the measurement of the first length L1 of the electric output shaft 400. The structure is simple and the operation is convenient.
[0032] Reference Figure 7 The second length measuring unit 340 includes a fifth measuring unit 341 and a third measuring gauge 342. The fifth measuring unit 341 is used to measure the second length L2 of the electric output shaft 400. The fifth measuring unit 341 is provided with a measuring block 343, and the third measuring gauge 342 is provided on the fixed base 110. The head of the third measuring gauge 342 abuts against the measuring block 343. The fifth measuring unit 341 is also provided with a fourth abutment block 344. After the base plate 200 slides relative to the fixed base 110 and reaches a predetermined position, the fourth abutment block 344 abuts against the end face of the electric conveyor shaft, and the displacement change of the measuring block 343 is displayed by the third measuring gauge 342, thereby realizing the measurement of the second length L2 of the electric output shaft 400. The structure is simple and the operation is convenient.
[0033] It should be noted that the structures of the third measuring unit 331, the fourth measuring unit 332 and the fifth measuring unit 341 are basically the same as the structure of the first measuring unit 311, therefore, this application will not elaborate on them further.
[0034] It should also be noted that the third measuring unit 331, the fourth measuring unit 332 and the fifth measuring unit 341 can all be adjusted and set on the fixed base 110, so as to be able to adapt to electric output shafts 400 of different lengths and expand the scope of application.
[0035] The embodiments of this application have been described in detail above with reference to the accompanying drawings. However, this application is not limited to the above embodiments. Within the scope of knowledge possessed by those skilled in the art, various changes can be made without departing from the spirit of this application.
Claims
1. A comprehensive inspection fixture for electric output shafts, characterized in that, include: The base is equipped with a fixing seat; A substrate is disposed on one side of the fixed base. The substrate can slide relative to the fixed base. The substrate is provided with a positioning seat for placing an electric output shaft. The positioning seat is provided with a through hole. The first shaft segment of the electric output shaft is embedded in the through hole. The positioning seat is provided with a first clearance hole and a second clearance hole. A measuring mechanism is disposed on the fixed base. The measuring mechanism includes an outer diameter measuring component and a length measuring component. The outer diameter measuring component includes a first outer diameter measuring part and a second outer diameter measuring part. The first outer diameter measuring part is adapted to the first clearance hole and is used to measure the first shaft diameter of the electric output shaft. The second outer diameter measuring part is used to measure the second shaft diameter of the electric output shaft. The length measuring component includes a first length measuring part and a second length measuring part. The first length measuring part is adapted to the second clearance hole and is used to measure the first length of the electric output shaft. The second length measuring part is used to measure the second length of the electric output shaft.
2. The integrated inspection fixture for electric output shafts according to claim 1, characterized in that, The first outer diameter measuring part includes a first measuring unit, a second measuring unit, and a first measuring gauge. The first measuring unit and the second measuring unit cooperate to measure the first shaft diameter of the electric output shaft. The first measuring unit is provided with a first measuring rod, and the first measuring gauge is provided in the second measuring unit. The head of the first measuring gauge abuts against the end of the first measuring rod.
3. The integrated inspection fixture for electric output shafts according to claim 2, characterized in that, The first measuring unit includes a mounting block, a bracket, and a first abutment block. The mounting block is disposed on the fixed base, and the bracket is disposed on the side of the mounting block away from the fixed base. The two ends of the mounting block and the bracket are connected by a first spring and a second spring, respectively. The first spring and the second spring are used to support and reset the bracket, respectively. The first abutment block is disposed on the bracket, and the first measuring rod is disposed on the first abutment block.
4. The integrated inspection fixture for electric output shafts according to claim 3, characterized in that, The structure of the second measuring unit is the same as that of the first measuring unit, and the first measuring meter is disposed on the first abutting block of the second measuring unit.
5. The integrated inspection fixture for electric output shafts according to claim 4, characterized in that, The first measuring unit and the second measuring unit are adjustablely mounted on the fixed base, so that the first measuring unit and the second measuring unit can be close to each other or far apart from each other.
6. The integrated inspection fixture for electric output shafts according to claim 1, characterized in that, The structure of the second outer diameter measuring part is the same as that of the first outer diameter measuring part.
7. The integrated inspection fixture for electric output shafts according to claim 1, characterized in that, The first length measuring unit includes a third measuring unit, a fourth measuring unit, and a second measuring meter. The third measuring unit and the fourth measuring unit cooperate to measure the first length of the electric output shaft. The third measuring unit is provided with a second measuring rod, and the second measuring meter is provided in the fourth measuring unit. The head of the second measuring meter abuts against the second measuring rod.
8. The integrated inspection fixture for electric output shafts according to claim 1, characterized in that, The second length measuring unit includes a fifth measuring unit and a third measuring gauge. The fifth measuring unit is used to measure the second length of the electric output shaft. The fifth measuring unit is provided with a measuring block. The third measuring gauge is disposed on the fixed base, and the head of the third measuring gauge abuts against the measuring block.
9. The integrated inspection fixture for electric output shafts according to claim 1, characterized in that, The base is provided with a translation component, and the base plate is disposed on the translation component.
10. The integrated inspection fixture for electric output shafts according to claim 1, characterized in that, The base is disposed on the placement seat, which is used to place standard parts.