A stress and strain monitoring device for high-cold high-altitude precast beam
Patent Information
- Application Number
- CN202522135206.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-10-10
- Publication Date
- 2026-10-09
- Estimated Expiration
- 2035-10-10
AI Technical Summary
然而,在实际施工过程中,在浇筑混凝土的过程中,钢筋计的引线容易受到混凝土冲击的影响,由于引线与钢筋计主体的连接部位相对较为脆弱,在混凝土的冲击下,引线与钢筋计主体的连接容易发生松动,这种松动会干扰信号的正常传输,导致监测数据不准确甚至丢失
在本申请的方案中:
Smart Images

Figure CN224838977U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of precast beam stress and strain monitoring technology, and more specifically, to a stress and strain monitoring device for precast beams in high-altitude and cold regions. Background Technology
[0002] When constructing engineering projects in high-altitude and cold regions, the problem of cracking in precast beams and slabs is particularly prominent. This is because the special climate and geographical conditions in these regions, such as low temperatures, large temperature differences, strong winds, and complex geological environments, have a significant impact on the performance of concrete structures, making beams and slabs more prone to cracking and affecting the safety and durability of the structure. In order to accurately monitor the stress and strain of key stress-bearing parts of the structure (such as stress concentration areas at the mid-span and supports of large-span beams) and typical locations, so as to promptly detect potential safety hazards and take corresponding measures, steel gauges are usually precisely embedded before concrete pouring. The steel gauges are generally fixed to the main reinforcement bars by binding or welding to ensure that they can deform in tandem with the concrete, thereby accurately reflecting the stress changes inside the structure. However, during actual construction, the lead wire of the rebar gauge is easily affected by the impact of concrete during the pouring process. Since the connection between the lead wire and the main body of the rebar gauge is relatively fragile, the connection can easily loosen under the impact of concrete. This loosening can interfere with the normal transmission of signals, leading to inaccurate or even lost monitoring data. Therefore, we have made improvements and proposed a stress-strain monitoring device for precast beams in high-altitude and cold regions. Utility Model Content
[0003] This utility model provides a stress-strain monitoring device for precast beams in high-altitude and cold regions, including a rebar gauge body equipped with a rebar gauge lead wire. The device is characterized by a reinforcing section between the rebar gauge body and the rebar gauge lead wire, which reinforces the connection between the rebar gauge body and the rebar gauge lead wire. The reinforcing section includes a first sleeve fixedly fitted onto the outer surface of the rebar gauge lead wire, with first retaining rings at both ends of the first sleeve. The reinforcing section also includes two arc-shaped clamping plates disposed on the outer surface of the first sleeve, with connecting members between the two arc-shaped clamping plates and the rebar gauge body.
[0004] As a preferred technical solution of this application, the diameter of the first retaining ring is larger than the diameter of the first sleeve.
[0005] As a preferred technical solution of this application, the length of the arc-shaped card plate is adapted to the length of the first sleeve, and the two sides of the arc-shaped card plate are respectively in contact with the two first retaining rings.
[0006] As a preferred technical solution of this application, the connector includes two arc-shaped connecting plates connected to the main body of the steel bar, and a protective plate is connected to one end of each of the two arc-shaped connecting plates. The arc-shaped clamping plate is fixedly installed on the inner side of the protective plate.
[0007] As a preferred technical solution of this application, the two arc-shaped connecting plates are connected by bolts or welding.
[0008] As a preferred technical solution of this application, the arc-shaped connecting plate is welded together with the protective plate, and the protective plate is welded together with the arc-shaped clamping plate.
[0009] As a preferred technical solution of this application, the two protective plates cover the connection between the main body of the rebar gauge and the lead wire of the rebar gauge.
[0010] As a preferred technical solution of this application, the outer surface of the rebar measuring wire is provided with an auxiliary component, which is used for auxiliary fixing of the rebar measuring wire.
[0011] As a preferred technical solution of this application, the auxiliary component includes a second sleeve, which is fixedly sleeved on the outer surface of the reinforcing bar lead wire; a second retaining ring is fixedly connected to both sides of the second sleeve, and the diameter of the second retaining ring is larger than the diameter of the second sleeve.
[0012] As a preferred technical solution of this application, a rebar gauge connecting rod is provided on both sides of the main body of the rebar gauge.
[0013] Compared with the prior art, the beneficial effects of this utility model are as follows: In the scheme of this application: This application incorporates a reinforcement section that strengthens the connection between the rebar gauge body and the rebar gauge lead wire, reducing the likelihood of the rebar gauge lead wire loosening under concrete impact, thereby ensuring the stability and reliability of signal transmission. Attached Figure Description
[0014] Figure 1 A schematic diagram of the stress-strain monitoring device for precast beams in cold and high-altitude regions provided in this application; Figure 2 A partial structural schematic diagram of the stress-strain monitoring device for precast beams in cold and high-altitude regions provided in this application; Figure 3 A schematic diagram of the structure of the first retaining ring of the first core provided in this application; Figure 4 This is a schematic diagram of the arc-shaped card plate provided in this application.
[0015] The image shows: 1. Reinforcing bar main body; 101. Reinforcing bar connecting rod; 102. Reinforcing bar lead wire; 2. First sleeve; 201. First retaining ring; 3. Arc-shaped connecting plate; 301. Protective plate; 302. Arc-shaped clamping plate; 4. Second sleeve; 401. Second retaining ring. Detailed Implementation
[0016] To enable those skilled in the art to better understand the present invention, the technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the protection scope of the present invention.
[0017] It should be noted that, unless otherwise specified, the embodiments and features and technical solutions in the present invention can be combined with each other.
[0018] It should be noted that similar labels and letters in the following figures indicate similar items. Therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures.
[0019] For an example, please refer to... Figures 1-4 A stress-strain monitoring device for precast beams in high-altitude and cold regions includes a rebar gauge body 1, which is equipped with a rebar gauge lead wire 102. A reinforcement part is provided between the rebar gauge body 1 and the rebar gauge lead wire 102 to reinforce the connection between the rebar gauge body 1 and the rebar gauge lead wire 102. The reinforcement part includes a first sleeve 2 fixedly sleeved on the outer surface of the rebar gauge lead wire 102, with a first retaining ring 201 at both ends of the first sleeve 2. The reinforcement part also includes two arc-shaped clamping plates 302 disposed on the outer surface of the first sleeve 2, with connecting parts between the two arc-shaped clamping plates 302 and the rebar gauge body 1. The reinforcement part can reinforce the connection between the rebar gauge body 1 and the rebar gauge lead wire 102, reducing the possibility of the rebar gauge lead wire 102 loosening from the rebar gauge body 1 under concrete impact, thereby ensuring the stability and reliability of signal transmission.
[0020] The main body 1 of the rebar gauge and the lead wire 102 of the rebar gauge are both existing components that can be purchased directly from the market. Their specific structure, detection principle and circuit connection are all existing technologies, and will not be described in detail in this application.
[0021] Furthermore, the diameter of the first retaining ring 201 is larger than the diameter of the first sleeve 2. Both the first sleeve 2 and the first retaining ring 201 are fixed to the rebar gauge lead wire 102 by adhesive bonding. The length of the arc-shaped clamping plate 302 is adapted to the length of the first sleeve 2, and both sides of the arc-shaped clamping plate 302 are in contact with the two first retaining rings 201 respectively. The connector includes two arc-shaped connecting plates 3 connected to the rebar gauge body 1. One end of each of the two arc-shaped connecting plates 3 is connected to a protective plate 301. The arc-shaped clamping plate 302 is fixedly installed on the inner side of the protective plate 301. The arc-shaped connecting plate 3, the protective plate 301, the arc-shaped clamping plate 302 and the first retaining ring 201 cooperate with each other to limit the position of the first sleeve 2. Since the first sleeve 2 is fixed to the rebar gauge lead wire 102, the position of the rebar gauge lead wire 102 can be fixed, reducing the possibility of the rebar gauge lead wire 102 becoming loose from the rebar gauge body 1 under the impact of concrete.
[0022] Furthermore, the two arc-shaped connecting plates 3 are connected by bolts or welding; the arc-shaped connecting plate 3 is welded to the protective plate 301, and the protective plate 301 is welded to the arc-shaped clamping plate 302.
[0023] Furthermore, two protective plates 301 cover the connection between the main body 1 of the rebar gauge and the lead wire 102 of the rebar gauge. The shielding effect of the protective plates 301 can reduce the direct impact of concrete on the connection between the main body 1 of the rebar gauge and the lead wire 102 of the rebar gauge.
[0024] Furthermore, an auxiliary component is provided on the outer surface of the rebar gauge lead wire 102 for auxiliary fixing of the rebar gauge lead wire 102. The auxiliary component includes a second sleeve 4, which is fixedly sleeved on the outer surface of the rebar gauge lead wire 102. A second retaining ring 401 is fixedly connected to both sides of the second sleeve 4, and the diameter of the second retaining ring 401 is larger than the diameter of the second sleeve 4. The position of the second sleeve 4 is also close to the rebar gauge body 1. During installation, the second sleeve 4 can be tied to the rebar with tie wire to further fix the position of the rebar gauge lead wire 102. The second sleeve 4 is welded to the second retaining ring 401, and the second sleeve 4 and the rebar gauge lead wire 102 are fixed with glue. In this application, epoxy glue can be used as the glue.
[0025] Furthermore, both sides of the main body 1 of the rebar gauge are provided with rebar gauge connecting rods 101. When in use, the rebar gauge connecting rods 101 are tied together with the rebar by binding wire or directly welded to the rebar.
[0026] In this utility model, unless otherwise explicitly specified and limited, the terms "installation," "connection," "joining," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection, an electrical connection, or a connection that allows communication between them; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise explicitly limited. Those skilled in the art can understand the specific meaning of the above terms in this utility model according to the specific circumstances.
[0027] Obviously, the embodiments described above are only some embodiments of this utility model, not all embodiments. The accompanying drawings show preferred embodiments of this utility model, but do not limit the patent scope of this utility model. This utility model can be implemented in many different forms; rather, the purpose of providing these embodiments is to provide a more thorough and comprehensive understanding of the disclosure of this utility model. Although this utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art can still modify the technical solutions described in the foregoing specific embodiments, or make equivalent substitutions for some of the technical features. Any equivalent structures made using the content of this utility model specification and drawings, directly or indirectly applied to other related technical fields, are similarly within the patent protection scope of this utility model.
Claims
1. A stress-strain monitoring device for precast beams in high-altitude and cold regions, comprising a rebar gauge body (1), wherein the rebar gauge body (1) is equipped with a rebar gauge lead wire (102), characterized in that, A reinforcing part is provided between the main body (1) of the rebar gauge and the rebar gauge lead wire (102). The reinforcing part is used to reinforce the connection between the main body (1) of the rebar gauge and the rebar gauge lead wire (102). The reinforcing part includes a first sleeve (2) fixedly sleeved on the outer surface of the rebar gauge lead wire (102). Both ends of the first sleeve (2) are provided with a first retaining ring (201). The reinforcing part also includes two arc-shaped clamping plates (302) provided on the outer surface of the first sleeve (2). The two arc-shaped clamping plates (302) are connected to the main body (1) of the rebar gauge.
2. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 1, characterized in that, The diameter of the first retaining ring (201) is larger than the diameter of the first sleeve (2).
3. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 1, characterized in that, The length of the arc-shaped clamp (302) is adapted to the length of the first sleeve (2), and the two sides of the arc-shaped clamp (302) are in contact with the two first retaining rings (201) respectively.
4. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 1, characterized in that, The connector includes two arc-shaped connecting plates (3) connected to the main body (1) of the steel reinforcement. One end of each of the two arc-shaped connecting plates (3) is connected to a protective plate (301). The arc-shaped clamping plate (302) is fixedly installed on the inner side of the protective plate (301).
5. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 4, characterized in that, The two arc-shaped connecting plates (3) are connected by bolts or welding.
6. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 4, characterized in that, The arc-shaped connecting plate (3) is welded together with the protective plate (301), and the protective plate (301) is welded together with the arc-shaped clamping plate (302).
7. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 4, characterized in that, The two protective plates (301) cover the connection between the main body (1) of the rebar gauge and the lead wire (102) of the rebar gauge.
8. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 1, characterized in that, The outer surface of the reinforcing bar guide wire (102) is provided with an auxiliary component, which is used for auxiliary fixing of the reinforcing bar guide wire (102).
9. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 8, characterized in that, The auxiliary component includes a second sleeve (4), which is fixedly sleeved on the outer surface of the reinforcing bar lead wire (102); a second retaining ring (401) is fixedly connected to both sides of the second sleeve (4), and the diameter of the second retaining ring (401) is larger than the diameter of the second sleeve (4).
10. The stress-strain monitoring device for precast beams in high-altitude and cold regions according to claim 1, characterized in that, Both sides of the main body (1) of the steel bar meter are provided with steel bar meter connecting rods (101).