Full-automatic steel pipe handling crane

CN224848835UActive Publication Date: 2026-10-13HENAN MINE CRANE
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202522421977.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-11-14
Publication Date
2026-10-13
Estimated Expiration
2035-11-14

AI Technical Summary

Technical Problem

[0003]目前市场上的桥式起重机很多,例如:中国专利CN214653121U公开的一种偏挂小车单梁桥式起重机、中国专利CN214141300U公开的一种冶金专用双梁桥式起重机、中国专利CN223060552U公开的桥式起重机等,这些桥式起重机大多均包括桥架和起重小车,通过起重小车连接吊具移动重物,但是,钢管仓储转运行车通常为简单的直线行走,常规的桥式起重机通过桥架和起重小车移动重物的方式对于钢管仓储出入转运过于复杂,这些起重吊具也不适合钢管使用,而且单纯的钢丝绳连接起重吊具进行起升,移动过程中,容易发生摇摆

Benefits of technology

[0016]相对现有技术,本实用新型具有的有益效果为,本实用新型提供一种钢管全自动搬运起重机适合用于和钢管仓储的转运行车相配合对钢管进行转运。具体使用过程中,通过钢管吊具将钢管从一个转运行车搬运至另一个转运行车,由于只在不同行车轨道上转运行车之间进行搬运,起升机构可以直接固定在桥架上,省略起重小车;另外,设置剪刀臂结构,避免起升过程中吊具发生摇摆,充分保证起升过程的稳定性。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224848835U_ABST
    Figure CN224848835U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of steel pipe full-automatic handling crane, including bridge, hoisting mechanism and steel pipe sling;The underside of each end beam is provided with wheel, and one group of wheels is connected with travelling mechanism;Steel pipe sling includes sling beam and the several groups of [type lifting hook that are sequentially arranged on sling beam, each group of [type lifting hook is parallel to each other;The upside of sling beam is provided with two groups of lifting movable pulley, and the two sides of hoisting mechanism are respectively guided fixed pulley and steel wire rope fixing seat, and the steel wire rope led out by hoisting mechanism is sequentially wound through guided fixed pulley, lifting movable pulley and connects steel wire rope fixing seat;The underside of bridge and the upside of sling beam are connected by two groups of symmetrical scissors arms, and each group includes at least two scissors arms, the uppermost scissors arm is hinged with the underside of bridge, the lowermost scissors arm is hinged with the upside of sling beam, and the adjacent two scissors arms are hinged.The steel pipe full-automatic handling crane is suitable for and steel pipe warehouse's transfer operation vehicle cooperate to transfer steel pipe.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to a lifting device, specifically, to a fully automatic steel pipe handling crane. Background Technology

[0002] Bridge cranes are lifting equipment that spans across workshops, warehouses, and material yards for material handling. Because their ends rest on tall concrete pillars or metal supports, they resemble bridges. The bridge frame of a bridge crane runs longitudinally along rails laid on elevated structures on both sides, making full use of the space beneath the bridge frame for material handling without being obstructed by ground equipment. It is the most widely used and numerous type of lifting machinery.

[0003] There are many bridge cranes on the market, such as the single-girder bridge crane with an off-center trolley disclosed in Chinese patent CN214653121U, the double-girder bridge crane for metallurgy disclosed in Chinese patent CN214141300U, and the bridge crane disclosed in Chinese patent CN223060552U. Most of these bridge cranes include a bridge frame and a lifting trolley. The lifting trolley is connected to the lifting device to move the heavy object. However, steel pipe storage and transfer vehicles usually travel in a simple straight line. The conventional way of moving heavy objects by bridge frame and lifting trolley of bridge cranes is too complicated for the entry and exit of steel pipe storage and transfer. These lifting devices are also not suitable for steel pipes. Moreover, the simple wire rope connection of the lifting device for lifting is prone to swaying during the movement.

[0004] In order to solve the above problems, people have been seeking an ideal technological solution. Utility Model Content

[0005] The purpose of this utility model is to address the shortcomings of existing technologies by providing a fully automatic steel pipe handling crane.

[0006] To achieve the above objectives, the technical solution adopted by this utility model is as follows: A fully automatic steel pipe handling crane includes a bridge frame, end beams at both ends of the bridge frame, a lifting mechanism on the upper side of the bridge frame, and a steel pipe lifting device connected to the lifting mechanism. Wheels are provided on the lower side of each end beam, and one set of wheels is connected to a trolley traveling mechanism. The steel pipe lifting device includes a lifting beam and several sets of [-shaped] hooks arranged sequentially on the lifting beam, with each set of [-shaped] hooks parallel to each other. Two sets of lifting movable pulleys are provided on the upper side of the lifting beam. Guide fixed pulleys and wire rope fixing seats are respectively located on both sides of the lifting mechanism. The wire rope led out by the lifting mechanism passes sequentially through the guide fixed pulleys and the lifting movable pulleys and connects to the wire rope fixing seats. The lower side of the bridge frame and the upper side of the lifting beam are connected by two sets of symmetrical scissor arms. Each set includes at least two scissor arms. The uppermost scissor arm is hinged to the lower side of the bridge frame, and the lowermost scissor arm is hinged to the upper side of the lifting beam. Adjacent scissor arms are hinged to each other.

[0007] The cable tray includes two parallel main beams, with end beams connected to both ends of the main beams. The two main beams are connected in the middle by five sets of connecting seats, with gaps between each set of connecting seats. The lifting mechanism, guide pulley, and wire rope fixing seat are respectively set on the upper side of the connecting seats.

[0008] Vertical baffles are installed at both ends of the end beam, and connecting plates are installed on both sides of the vertical baffles. Horizontal mounting plates are installed at the bottom of the two connecting plates, and two sets of horizontal wheels are installed on the horizontal mounting plates. Vertical mounting plates are installed at the top of the two connecting plates, and buffers are installed on the vertical mounting plates.

[0009] A walkway is provided on the outside of the main beam, and guardrails are installed along the edge of the walkway.

[0010] Two sets of first supports are provided on the lower side of the main beam corresponding to the scissor arms, and a second support is provided on the upper side of the lifting beam corresponding to the first supports. The uppermost scissor arm is hinged to the first support, and the lowermost scissor arm is hinged to the second support.

[0011] The lifting beam is connected to a longitudinal support beam, which is aligned with the top of the hook. A second support is provided on the upper side of the longitudinal support beam.

[0012] The second support is located between the two lifting pulleys.

[0013] Each scissor arm includes two symmetrical hinged connecting plates, which are connected by a longitudinal connecting plate. When the scissor arm is closed, the lifting pulley is located in the gap between the two hinged connecting plates of the scissor arm.

[0014] The guide pulley includes a first pulley seat and a guide wheel rotatably connected to the first pulley seat. A pulley shield is provided on the top of the first pulley seat, and openings are provided on both sides of the first pulley seat to facilitate the entry and exit of the wire rope.

[0015] The lifting pulley includes a second pulley seat and a guide wheel rotatably connected to the second pulley seat. The top and both sides of the first pulley seat are open.

[0016] Compared to existing technologies, the advantages of this utility model are as follows: This utility model provides a fully automatic steel pipe handling crane suitable for use in conjunction with steel pipe storage transfer vehicles to transfer steel pipes. In specific use, steel pipes are moved from one transfer vehicle to another using a steel pipe lifting device. Since the transfer only occurs between transfer vehicles on different tracks, the lifting mechanism can be directly fixed to the bridge frame, eliminating the need for a lifting trolley. In addition, a scissor arm structure is provided to prevent the lifting device from swaying during the lifting process, fully ensuring the stability of the lifting process. Attached Figure Description

[0017] Figure 1 This is a front view structural diagram of this utility model.

[0018] Figure 2 This is a side view of the structure of this utility model.

[0019] Figure 3 This is a schematic diagram of the cable tray and steel pipe lifting device in this utility model.

[0020] Figure 4 This is a partially enlarged schematic diagram of the middle beam of this utility model.

[0021] In the diagram: 1. Cable tray; 2. End beam; 3. Main beam; 4. Trolley travel track; 5. Wheel; 6. Trolley traveling mechanism; 7. Lifting mechanism; 8. Scissor arm; 9. Guide pulley; 10. Lifting pulley; 11. Wire rope fixing seat; 12. Lifting beam; 13. [-type hook; 14. Connecting seat; 15. Vertical baffle; 16. Connecting plate; 17. Horizontal mounting plate; 18. Horizontal wheel; 19. Vertical mounting plate; 20. Buffer; 21. Walkway; 22. Guardrail; 23. First support; 24. Second support; 25. Longitudinal support beam; 26. Hinged connecting plate; 27. Longitudinal connecting plate; 28. First pulley seat; 29. ​​Second pulley seat. Detailed Implementation

[0022] The technical solution of this utility model will be further described in detail below through specific embodiments.

[0023] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "installed," "equipped with," and "connected," etc., should be interpreted broadly. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be a connection within two components. "Installed," "equipped with," and "connected" can employ conventional means in the prior art, such as integral installation, snap-fit ​​installation, welding connection, adhesive connection, bolted connection, etc. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances and select suitable connection, setting, or installation methods from the existing technology.

[0024] like Figure 1-4 As shown, a fully automatic steel pipe handling crane includes a bridge frame 1, end beams 2 disposed at both ends of the bridge frame 1, a lifting mechanism 7 disposed on the upper side of the bridge frame 1, and a steel pipe lifting device connected to the lifting mechanism 7; wheels 5 are disposed on the lower side of each end beam 2, and one set of wheels 5 is connected to a trolley traveling mechanism 6; the steel pipe lifting device includes a lifting beam 12 and several sets of [-type hooks 13] sequentially disposed on the lifting beam 12, with each set of [-type hooks 13] parallel to each other; two sets of lifting pulleys are disposed on the upper side of the lifting beam 12. 10. The lifting mechanism 7 has guide pulleys 9 and wire rope fixing seats 11 on both sides. The wire rope leading from the lifting mechanism 7 passes sequentially through the guide pulleys 9 and the lifting pulley 10 before connecting to the wire rope fixing seats 11. The lower side of the bridge frame 1 and the upper side of the lifting beam 12 are connected by two sets of symmetrical scissor arms 8. Each set includes at least two scissor arms 8. The uppermost scissor arm 8 is hinged to the lower side of the bridge frame 1, and the lowermost scissor arm 8 is hinged to the upper side of the lifting beam 12. Adjacent scissor arms 8 are hinged together. Specifically, a trolley travel track 4 is installed inside the plant, and the wheels 5 on the lower side of the end beam 2 move along the trolley travel track 4.

[0025] Specifically, the lifting beam 12 is parallel to the bridge frame 1, and the length of the lifting beam 12 is slightly less than that of the bridge frame 1 but more than two-thirds of the length of the bridge frame 1, which facilitates its cooperation with the steel pipe; the crane can be operated by common remote control and other control devices, and the specific control elements and control circuits all adopt existing technologies, which will not be described in detail; a trolley track is set on the upper part of the plant, and the wheels travel along the trolley track; the trolley running mechanism mainly includes the trolley drive motor, reducer and other wheel drive mechanisms.

[0026] This fully automatic steel pipe handling crane is suitable for use in conjunction with steel pipe storage transfer vehicles to transport steel pipes. In practical use, steel pipes are moved from one transfer vehicle to another using a pipe lifting device. Since the transport only occurs between transfer vehicles on different tracks, the lifting mechanism can be directly fixed to the bridge frame, eliminating the need for a lifting trolley. Furthermore, a scissor arm structure is incorporated to prevent swaying of the lifting device during lifting, ensuring full stability during the lifting process.

[0027] In one embodiment, the cable tray 1 includes two parallel main beams 3, with end beams 2 connected to both ends of the main beams 3 respectively. The middle parts of the two main beams 3 are connected by five sets of connecting seats 14, with gaps between each set of connecting seats 14. The lifting mechanism 7, the guide pulley 9, and the wire rope fixing seat 11 are respectively arranged on the upper side of the connecting seats 14.

[0028] In one embodiment, vertical baffles 15 are respectively provided at both ends of the end beam 2, and connecting plates 16 are respectively provided on both sides of the vertical baffles 15. A horizontal mounting plate 17 is provided at the lower part of the two connecting plates 16, and two sets of horizontal wheels 18 are provided on the horizontal mounting plate 17. The horizontal wheels are tangent to both sides of the trolley track to improve the stability of the trolley operation. A vertical mounting plate 19 is provided at the upper part of the two connecting plates 16, and a buffer 20 is provided on the vertical mounting plate 19.

[0029] In one embodiment, a walkway 21 is provided on the outer side of the main beam 3, and a guardrail 22 is provided on the edge of the walkway 21.

[0030] In one embodiment, the lower side of the main beam 3 is provided with two sets of first supports 23 corresponding to the scissor arms 8, and the upper side of the lifting beam 12 is provided with second supports 24 corresponding to the first supports 23. The uppermost scissor arm 8 is hinged to the first supports 23, and the lowermost scissor arm 8 is hinged to the second supports 24, which facilitates assembly.

[0031] In one embodiment, the lifting beam 12 is connected to a longitudinal support beam 25, which is aligned with the top of the hook 13, and a second support 24 is provided on the upper side of the longitudinal support beam 25.

[0032] In one embodiment, the second support 24 is located between the two lifting pulleys 10 for easy assembly.

[0033] In one embodiment, each scissor arm 8 includes two symmetrical hinged connecting plates 26, with a longitudinal connecting plate 27 between the two hinged connecting plates 26. When the scissor arm 8 is closed, the lifting pulley 10 is located in the gap between the two hinged connecting plates 26 of the scissor arm, thus avoiding mutual interference between the scissor arm and the lifting pulley.

[0034] In one embodiment, the guide pulley 9 includes a first pulley seat 28 and a guide wheel rotatably connected to the first pulley seat 28. A pulley shield is provided on the top of the first pulley seat 28, and openings are provided on both sides of the first pulley seat 28 to facilitate the entry and exit of the wire rope and to facilitate the winding of the rope.

[0035] In one embodiment, the lifting pulley 10 includes a second pulley seat 29 and a guide wheel rotatably connected to the second pulley seat 29. The top and sides of the first pulley seat 28 are open to facilitate rope winding.

[0036] The above embodiments can be combined with each other.

[0037] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of this utility model and not to limit it; although the utility model has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications can still be made to the specific implementation of this utility model or equivalent substitutions can be made to some technical features without departing from the spirit of the technical solution of this utility model, and all such modifications and substitutions should be covered within the scope of the technical solution claimed by this utility model.

Claims

1. A fully automatic steel pipe handling crane, characterized in that: The system includes a cable tray, end beams at both ends of the cable tray, a lifting mechanism on the upper side of the cable tray, and a steel pipe lifting device connected to the lifting mechanism. Wheels are installed on the underside of each end beam, with one set of wheels connected to a trolley traveling mechanism. The steel pipe lifting device includes a lifting beam and several sets of [-shaped] hooks sequentially arranged on the lifting beam, with each set of [-shaped] hooks parallel to each other. Two sets of lifting movable pulleys are installed on the upper side of the lifting beam. Guide fixed pulleys and wire rope fixing seats are located on both sides of the lifting mechanism, and the wire rope leading from the lifting mechanism sequentially passes through the guide fixed pulleys and the lifting movable pulleys before connecting to the wire rope fixing seats. The lower side of the cable tray and the upper side of the lifting beam are connected by two sets of symmetrical scissor arms, each set including at least two scissor arms. The uppermost scissor arm is hinged to the lower side of the cable tray, and the lowermost scissor arm is hinged to the upper side of the lifting beam. Adjacent scissor arms are hinged to each other.

2. The fully automatic steel pipe handling crane according to claim 1, characterized in that: The cable tray includes two parallel main beams, with end beams connected to both ends of the main beams. The two main beams are connected in the middle by five sets of connecting seats, with gaps between each set of connecting seats. The lifting mechanism, guide pulley, and wire rope fixing seat are respectively set on the upper side of the connecting seats.

3. The fully automatic steel pipe handling crane according to claim 2, characterized in that: Vertical baffles are installed at both ends of the end beam, and connecting plates are installed on both sides of the vertical baffles. Horizontal mounting plates are installed at the bottom of the two connecting plates, and two sets of horizontal wheels are installed on the horizontal mounting plates. Vertical mounting plates are installed at the top of the two connecting plates, and buffers are installed on the vertical mounting plates.

4. The fully automatic steel pipe handling crane according to claim 3, characterized in that: A walkway is provided on the outside of the main beam, and guardrails are installed along the edge of the walkway.

5. The fully automatic steel pipe handling crane according to claim 4, characterized in that: Two sets of first supports are provided on the lower side of the main beam corresponding to the scissor arms, and a second support is provided on the upper side of the lifting beam corresponding to the first supports. The uppermost scissor arm is hinged to the first support, and the lowermost scissor arm is hinged to the second support.

6. The fully automatic steel pipe handling crane according to claim 5, characterized in that: The lifting beam is connected to a longitudinal support beam, which is aligned with the top of the hook. A second support is provided on the upper side of the longitudinal support beam.

7. The fully automatic steel pipe handling crane according to claim 6, characterized in that: The second support is located between the two lifting pulleys.

8. The fully automatic steel pipe handling crane according to claim 7, characterized in that: Each scissor arm includes two symmetrical hinged connecting plates, which are connected by a longitudinal connecting plate. When the scissor arm is closed, the lifting pulley is located in the gap between the two hinged connecting plates of the scissor arm.

9. The fully automatic steel pipe handling crane according to claim 8, characterized in that: The guide pulley includes a first pulley seat and a guide wheel rotatably connected to the first pulley seat. A pulley shield is provided on the top of the first pulley seat, and openings are provided on both sides of the first pulley seat to facilitate the entry and exit of the wire rope.

10. The fully automatic steel pipe handling crane according to claim 9, characterized in that: The lifting pulley includes a second pulley seat and a guide wheel rotatably connected to the second pulley seat. The top and both sides of the first pulley seat are open.

Citation Information

Patent Citations

  • Special double-beam bridge crane for metallurgy

    CN214141300U

  • Single-beam bridge crane with deviated hanging trolley

    CN214653121U

  • Bridge crane

    CN223060552U