Steel temporary bridge and steel sheet pile cooperative supporting device
Patent Information
- Application Number
- CN202522014742.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-09-19
- Publication Date
- 2026-10-13
- Estimated Expiration
- 2035-09-19
AI Technical Summary
[0003]现有的钢便桥在施工的过程中,首先将钢板桩打入至钢管桩置入支护的位置,由于钢板桩与钢管桩在施工的过程中采用分体式方式进行支护,因此导致其防护结构单一,无法形成相互支撑的结构,当其中一处支护受力而断裂时,容易导致整体结构损毁,影响施工,所以我们提出了钢便桥与钢板桩协同支护装置来解决上述存在的问题
[0020]相比于现有技术,本实用新型的优点在于:
Smart Images

Figure CN224849305U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of building construction technology, and more specifically, to a steel temporary bridge and steel sheet pile collaborative support device. Background Technology
[0002] Bridges play a vital role as important transportation infrastructure connecting two banks. Steel temporary bridges, as a special type of bridge, demonstrate their value in many scenarios due to their advantages. Steel temporary bridges are temporary or simple bridges constructed primarily of steel. They are lightweight, quick to erect, and can often meet traffic needs in a short time. Steel sheet piles are interlocking steel structures that can be freely combined through edge linkage devices to form continuous retaining walls or water-retaining walls. They are widely used in civil engineering fields such as foundation pit support and cofferdam construction.
[0003] In the construction of existing temporary steel bridges, steel sheet piles are first driven into the position where steel pipe piles are placed for support. Because the steel sheet piles and steel pipe piles are supported separately during construction, the protective structure is singular and cannot form a mutually supporting structure. When one of the supports breaks under stress, it can easily lead to the destruction of the entire structure and affect construction. Therefore, we propose a steel temporary bridge and steel sheet pile collaborative support device to solve the above-mentioned problems. Utility Model Content
[0004] 1. Technical problems to be solved
[0005] In view of the problems existing in the prior art, the purpose of this utility model is to provide a steel temporary bridge and steel sheet pile collaborative support device. It can provide collaborative support for steel sheet piles and steel pipe piles. When one of the support structures is fractured under stress, the overall support structure is not affected, which buys time for subsequent emergency repairs and ensures the normal progress of construction.
[0006] 2. Technical Solution
[0007] To solve the above problems, the present invention adopts the following technical solution.
[0008] A steel temporary bridge and steel sheet pile collaborative support device includes steel pipe piles and jackets symmetrically installed on the steel pipe piles. A first support arm and a second support arm are symmetrically installed on both sides of the root of the steel pipe piles.
[0009] Both ends of the first support arm are provided with assembly grooves, and a first pin hole penetrating the first support arm is provided at the assembly groove.
[0010] Both ends of the second arm guard are integrally formed with locking blocks that engage with the assembly groove, and the locking blocks are provided with second pin holes corresponding to the first pin holes;
[0011] Two symmetrically arranged jackets are respectively equipped with a first arm arranged in a parallel structure and a second arm arranged in a cross structure. The edge of each jacket is integrally formed with a mounting ear, and a locking bolt for fixing the first arm and the second arm is inserted into the mounting ear.
[0012] The lower part of the jacket is provided with a fixing seat that engages with and is fixed to the first support arm for the steel pipe pile.
[0013] Furthermore, a reinforcing block with a right-angled triangular structure is installed at the corner where the ends of the first and second guard arms meet.
[0014] Furthermore, the reinforcing block is provided with mounting holes, and the first support arm and the second support arm are provided with screw holes corresponding to the mounting holes.
[0015] Furthermore, the card block and the assembly slot form an embedded structure.
[0016] Furthermore, both ends of the first arm and the second arm are provided with mounting holes, and the mounting holes are assembled and connected with the locking bolts.
[0017] Furthermore, the fixing seat has a slot for engaging with the steel pipe pile.
[0018] Furthermore, the base of the fixed seat is provided with symmetrical mounting holes, and the first support arm is provided with screw holes corresponding to the mounting holes.
[0019] 3. Beneficial effects
[0020] Compared with existing technologies, the advantages of this utility model are:
[0021] (1) In this scheme, the first and second protective arms are connected by splicing between the assembly groove and the clamping block, so that the first and second protective arms abut against the inner wall of the steel sheet pile. Finally, the clamping block is fixed in the assembly groove by passing the first and second pin holes with pins to support the steel sheet pile. Then, the steel pipe pile is driven into the stratum in the cofferdam. The first arm is installed in parallel between the two sleeves with locking bolts, and the second arm is installed crosswise between the two sleeves with locking bolts. Finally, the steel pipe pile is clamped and fixedly connected to the first protective arm by the fixing seat. Through this collaborative support structure, the steel sheet pile and the steel pipe pile can be supported in a coordinated manner. When one of the support structures is broken by stress, the overall support structure is not affected, which buys time for later emergency repairs and ensures the normal progress of construction.
[0022] (2) In this solution, a reinforcing block with a right-angled triangular structure is installed at the corner where the ends of the first guard arm and the second guard arm meet. This enhances the strength, rigidity and torsional resistance of the first guard arm and the second guard arm. It can overcome the product distortion caused by uneven stress due to the difference in wall thickness between the first guard arm and the second guard arm, thereby increasing the strength of the joint surface and improving the support effect. Attached Figure Description
[0023] Figure 1 This is a three-dimensional structural diagram of the present invention;
[0024] Figure 2 This is a schematic diagram of the first protective arm structure of this utility model;
[0025] Figure 3 This is a schematic diagram of the second guard arm structure of this utility model;
[0026] Figure 4 This is a schematic diagram of the reinforcing block structure of this utility model;
[0027] Figure 5 This is a schematic diagram of the assembly of the first support arm and the second support wall of this utility model;
[0028] Figure 6 This is a schematic diagram of the jacket structure of this utility model.
[0029] Explanation of the labels in the diagram:
[0030] 1. Steel pipe pile; 2. Jacket; 3. First support arm; 4. Second support arm; 5. Assembly slot; 6. First pin hole; 7. Locking block; 8. Second pin hole; 9. Reinforcing block; 10. First support arm; 11. Second support arm; 12. Locking bolt; 13. Fixing seat. Detailed Implementation
[0031] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. All other embodiments obtained by those skilled in the art based on the embodiments of the present utility model without creative effort are within the protection scope of the present utility model.
[0032] Example:
[0033] Please see Figure 1-6 The steel temporary bridge and steel sheet pile collaborative support device includes a steel pipe pile 1 and a jacket 2 symmetrically installed on the steel pipe pile 1. A first support arm 3 and a second support arm 4 are symmetrically installed on both sides of the root of the steel pipe pile 1.
[0034] Both ends of the first guard arm 3 are provided with mounting grooves 5, and the mounting grooves 5 are provided with first pin holes 6 that penetrate the first guard arm 3.
[0035] Both ends of the second guard arm 4 are integrally formed with locking blocks 7 that engage with the assembly groove 5. The locking blocks 7 are provided with second pin holes 8 corresponding to the first pin hole 6.
[0036] Two horizontally symmetrically arranged clips 2 are respectively installed with a first arm 10 arranged in a parallel structure and a second arm 11 arranged in a cross structure. The edge of the clip 2 is integrally formed with mounting ears, and locking bolts 12 for fixing the first arm 10 and the second arm 11 are inserted into the mounting ears.
[0037] Below the jacket 2, there is a fixing seat 13 that is engaged with the steel pipe pile 1 and fixed on the first support arm 3;
[0038] It should be noted that when using this steel temporary bridge and steel sheet pile collaborative support device, firstly, after driving steel sheet piles into the area where steel pipe piles 1 are being constructed to form a cofferdam, water is pumped out and silt is cleared. Then, the first support arm 3 and the second support arm 4 are connected by splicing the assembly groove 5 and the locking block 7, so that the first support arm 3 and the second support arm 4 abut against the inner wall of the steel sheet piles. Finally, the locking block 7 is fixed in the assembly groove 5 by using pins passing through the first pin hole 6 and the second pin hole 8 to support the steel sheet piles. After that, the steel pipe piles 1 are driven into the... In the strata within the cofferdam, the first support arm 10 is installed parallel between two sleeves 2 using locking bolts 12, and the second support arm 11 is installed crosswise between two sleeves 2 using locking bolts 12. Finally, the steel pipe pile 1 is secured and fixedly connected to the first support arm 3 using a fixing seat 13. Through this collaborative support structure, the steel sheet piles and steel pipe piles 1 can be supported in a coordinated manner. When one part of the support structure breaks under stress, the overall support structure is not affected, thus buying time for subsequent emergency repairs and ensuring the normal progress of construction.
[0039] like Figure 4 As shown, a reinforcing block 9 with a right-angled triangular structure is installed at the corner where the ends of the first guard arm 3 and the second guard arm 4 meet. The reinforcing block 9 has an assembly hole, and the first guard arm 3 and the second guard arm 4 have screw holes corresponding to the assembly hole.
[0040] It should be noted that by installing a reinforcing block 9 with a right-angled triangular structure at the corner where the ends of the first guard arm 3 and the second guard arm 4 meet, the strength, rigidity, and torsional resistance of the first guard arm 3 and the second guard arm 4 are enhanced. This can overcome the product distortion caused by uneven stress due to the difference in wall thickness between the first guard arm 3 and the second guard arm 4, thereby increasing the strength of the joint surface and improving the support effect.
[0041] like Figure 2 , Figure 3 , Figure 4 As shown, the card block 7 and the assembly slot 5 form an embedded structure;
[0042] It should be noted that the stability of the assembly between the first guard arm 3 and the second guard arm 4 was ensured.
[0043] like Figure 5 , Figure 6 As shown, both ends of the first arm 10 and the second arm 11 are provided with mounting holes, and the mounting holes are assembled and connected with the locking bolts 12.
[0044] It should be noted that by installing the first arm 10 in parallel between the two sleeves 2 using locking bolts 12, and by installing the second arm 11 crosswise between the two sleeves 2 using locking bolts 12, the effect of supporting and stabilizing the steel pipe pile 1 is improved.
[0045] like Figure 1 , Figure 5 As shown, the fixing seat 13 has a slot for engaging with the steel pipe pile 1, and the base of the fixing seat 13 has symmetrical mounting holes. The first support arm 3 has screw holes corresponding to the mounting holes.
[0046] It should be noted that this facilitates the installation and fixation of the fixing seat 13, while ensuring the stability of the assembly between the fixing seat 13 and the steel pipe pile 1.
[0047] In use: First, after driving steel sheet piles into the area where steel pipe pile 1 is being constructed to form a cofferdam, water is pumped out and silt is removed. Then, the first support arm 3 and the second support arm 4 are connected by splicing between the assembly groove 5 and the clamping block 7, so that the first support arm 3 and the second support arm 4 abut against the inner wall of the steel sheet pile. Finally, the clamping block 7 is fixed in the assembly groove 5 by passing pins through the first pin hole 6 and the second pin hole 8 to support the steel sheet pile. After that, the steel pipe pile 1 is driven into the stratum in the cofferdam. The first support arm 10 is installed parallel between the two clamps 2 by locking bolts 12, and the second support arm 11 is installed crosswise between the two clamps 2 by locking bolts 12. Finally, the steel pipe pile 1 is clamped and fixedly connected to the first support arm 3 by the fixing seat 13. Through this collaborative support structure, the steel sheet pile and the steel pipe pile 1 can be supported in a coordinated manner.
[0048] The above description is merely a preferred embodiment of this utility model; however, the protection scope of this utility model is not limited thereto. Any equivalent substitutions or modifications made by those skilled in the art within the technical scope disclosed in this utility model, based on the technical solution and its improved concept, should be included within the protection scope of this utility model.
Claims
1. A steel temporary bridge and steel sheet pile collaborative support device, comprising steel pipe piles (1) and jackets (2) symmetrically installed on the steel pipe piles (1), characterized in that: The steel pipe pile (1) has a first guard arm (3) and a second guard arm (4) symmetrically installed on both sides of its root. Both ends of the first support arm (3) are provided with assembly grooves (5), and a first pin hole (6) penetrating the first support arm (3) is provided at the assembly groove (5); Both ends of the second arm guard (4) are integrally formed with locking blocks (7) that engage with the assembly groove (5), and the locking blocks (7) are provided with second pin holes (8) corresponding to the first pin hole (6); Two sleeves (2) arranged laterally symmetrically are respectively equipped with a first arm (10) arranged in a parallel structure and a second arm (11) arranged in a cross structure. The edge of each sleeve (2) is integrally formed with a mounting ear, and a locking bolt (12) for fixing the first arm (10) and the second arm (11) is inserted into the mounting ear. The lower part of the sleeve (2) is provided with a fixing seat (13) that is engaged and fixed to the first support arm (3) with the steel pipe pile (1).
2. The steel temporary bridge and steel sheet pile collaborative support device according to claim 1, characterized in that: A reinforcing block (9) with a right-angled triangular structure is installed at the corner where the ends of the first support arm (3) and the second support arm (4) meet.
3. The steel temporary bridge and steel sheet pile collaborative support device according to claim 2, characterized in that: The reinforcing block (9) has an assembly hole, and the first support arm (3) and the second support arm (4) have screw holes corresponding to the assembly hole.
4. The steel temporary bridge and steel sheet pile collaborative support device according to claim 1, characterized in that: The card block (7) and the assembly slot (5) form an embedded structure.
5. The steel temporary bridge and steel sheet pile collaborative support device according to claim 1, characterized in that: Both ends of the first arm (10) and the second arm (11) are provided with mounting holes, and the mounting holes are assembled and connected with the locking bolts (12).
6. The steel temporary bridge and steel sheet pile collaborative support device according to claim 1, characterized in that: The fixing seat (13) has a slot for engaging with the steel pipe pile (1).
7. The steel temporary bridge and steel sheet pile collaborative support device according to claim 1, characterized in that: The base of the fixed seat (13) is provided with symmetrical mounting holes, and the first support arm (3) is provided with screw holes corresponding to the mounting holes.