A construction structure for converting and installing a wall connecting piece of an aluminum frame curtain wall construction scaffold
Patent Information
- Application Number
- CN202522326670.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-11-03
- Publication Date
- 2026-10-13
- Estimated Expiration
- 2035-11-03
AI Technical Summary
[0003]现公开技术为“一种玻璃幕墙安装使用的脚手架连墙件”,在玻璃幕墙上设置吸盘式连墙件,此做法需单独加工连墙件,且与结构墙面不能匹配,只能连接在玻璃上
本申请在脚手架钢管端部焊接一块开两个φ10孔的70*150*5钢板(连接板)作为后置连墙件,前期施工时将该连墙件通过膨胀螺栓固定在结构上进行拉结,在安装完幕墙铝龙骨后,采用φ6的幕墙专用不锈钢螺栓将连墙件重新固定在幕墙框的卡槽内,在后期幕墙玻璃安装完成打胶后在拆除连墙件,后置连墙件的适用性更大,现场拆改方便,有效的解决幕墙玻璃在安装时须拆除脚手架连墙件的问题,脚手架连墙件由结构墙体转换至幕墙框架上,保证脚手架的使用安全。
Smart Images

Figure CN224849599U_ABST
Abstract
Description
Technical Field
[0001] This application relates to the field of building construction, specifically to a construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding. Background Technology
[0002] Currently, when using scaffolding to install glass curtain walls, the wall ties are often removed during glass installation, which poses a significant safety risk to the scaffolding.
[0003] The currently disclosed technology is "a scaffolding wall tie for glass curtain wall installation". The suction cup wall tie is installed on the glass curtain wall. This method requires the wall tie to be processed separately and cannot be matched with the structural wall surface. It can only be connected to the glass. Utility Model Content
[0004] The purpose of this utility model is to provide a construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding, in order to solve the problems mentioned in the background art.
[0005] To achieve the above objectives, the present invention adopts the following technical solution: A construction structure for converting and installing wall ties in aluminum frame curtain wall construction scaffolding includes wall ties and main keels arranged sequentially from the inner side of the wall to the outer side. The wall ties are fixed to the structural wall by special inverted conical chemical anchors. The main keel is characterized by having hollow double tempered coated glass connected to both sides, a decorative cover connecting groove on the top of the main keel, a connecting plate connected to the decorative cover connecting groove by bolts, and scaffolding members connected to the connecting plate.
[0006] More preferably, the main keel is an exposed frame column, including a hollow main rectangular frame structure, a decorative cover connecting groove is provided on the hollow main rectangular frame structure, and hollow double tempered coated glass is fixed on both sides of the decorative cover connecting groove.
[0007] Furthermore, aluminum alloy concealed frame beams connect the main keels.
[0008] Furthermore, the aluminum alloy concealed frame beam is fixed to the main keel using galvanized angle steel.
[0009] Furthermore, the decorative cover connecting groove is set vertically along the main keel.
[0010] Furthermore, the bolt head is confined within the decorative cover connection groove, and the bolt is secured by a nut after passing through the connecting plate.
[0011] In addition, the decorative cover connecting groove has a U-shaped structure, with the two vertical plates of the U-shaped structure bent relative to each other, and the distance between the bent plates is the bolt screw outlet.
[0012] More preferably, a temporary adhesive pad is provided between the bottom of the connecting plate and the hollow double tempered coated glass.
[0013] Compared with the prior art, this utility model has the following features and beneficial effects: This application involves welding a 70*150*5 steel plate (connecting plate) with two φ10 holes to the end of the scaffold steel pipe as a post-installed wall tie. During the initial construction phase, this wall tie is fixed to the structure with expansion bolts for connection. After the curtain wall aluminum keel is installed, the wall tie is re-fixed to the slot in the curtain wall frame using φ6 curtain wall-specific stainless steel bolts. The wall tie is removed after the curtain wall glass is installed and caulking is applied. The post-installed wall tie has greater applicability and is easier to dismantle and modify on site, effectively solving the problem of having to remove the scaffold wall ties during curtain wall glass installation. The scaffold wall tie is transferred from the structural wall to the curtain wall frame, ensuring the safety of scaffold use. Attached Figure Description
[0014] Figure 1 This is a schematic diagram of the construction structure for the conversion and installation of wall ties in an aluminum frame curtain wall construction scaffolding according to this application.
[0015] Attached reference numerals: 1-Wall tie; 2-Main keel; 21-Decorative cover connecting groove; 22-Hollow main rectangular frame structure; 3-Special inverted conical chemical anchor; 4-Structural wall; 5-Bolt; 6-Scaffolding member; 7-Aluminum alloy concealed frame beam; 8-Galvanized angle steel; 9-Temperature rubber pad; 10-Hollow double tempered coated glass; 11-Connecting plate. Detailed Implementation
[0016] To make the technical means, innovative features, objectives and effects of this utility model easier to understand, the utility model will be further described below.
[0017] The embodiments described herein are specific implementations of this utility model, used to illustrate the concept of this utility model. They are all illustrative and exemplary, and should not be construed as limiting the implementation methods or scope of this utility model. In addition to the embodiments described herein, those skilled in the art can employ other obvious technical solutions based on the content disclosed in the claims and specification of this application. These technical solutions include those that make any obvious substitutions and modifications to the embodiments described herein.
[0018] Example 1 A construction structure for converting and installing wall ties in aluminum frame curtain wall construction scaffolding includes wall ties 1 and main keel 2 arranged sequentially from the inner side of the wall to the outer side. The wall ties 1 are fixed to the structural wall 4 by special inverted conical chemical anchors 3. Hollow double tempered coated glass 10 is connected to both sides of the main keel 2. The top of the main keel 2 is provided with a decorative cover connecting groove 21. The decorative cover connecting groove 21 is connected to a connecting plate 11 by bolts 5. The connecting plate 11 is connected to scaffolding rods 6.
[0019] The main keel 2 is a finished exposed frame column, including a hollow main rectangular frame structure 22. The decorative cover connecting groove 21 is set on the hollow main rectangular frame structure 22. The hollow double tempered coated glass 10 is fixed on both sides of the decorative cover connecting groove 21. An aluminum alloy hidden frame beam 7 is connected between the main keels 2. The aluminum alloy hidden frame beam 7 is fixed to the main keel 2 by galvanized angle steel 8. The decorative cover connecting groove 21 is set vertically along the main keel 2.
[0020] Example 2 Based on Embodiment 1, the bolt head of bolt 5 is confined within the decorative cover connecting groove 21. The bolt passes through the connecting plate 11 and is fixed by a nut. The decorative cover connecting groove 21 has a U-shaped cross-section, with two vertical plates of the U-shape bent relative to each other. The distance between the bent plates is the bolt outlet of bolt 5. A temporary adhesive pad 9 is provided between the bottom of the connecting plate 11 and the hollow double-tempered coated glass 10. By using scaffolding-mounted wall ties with matching aluminum frame slots, the wall ties are initially fixed to the main structure. After the curtain wall aluminum frame is installed, the wall ties are transferred to the aluminum frame for fixing. This approach effectively ensures safe construction of the glass curtain wall using scaffolding.
[0021] Key points of construction operation: (1) Fabricate matching post-installed wall ties; (2) Installation of aluminum frame for curtain wall; (3) The aluminum frame slot is opened to insert the wall-connecting bolts into the slot; (4) Disassemble the wall tie and fix it to the aluminum frame of the curtain wall.
[0022] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. It will be apparent to those skilled in the art that this utility model is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or basic characteristics of this utility model. Therefore, the embodiments should be considered exemplary and non-limiting in all respects. The scope of this utility model is defined by the appended claims rather than the foregoing description, and thus all variations falling within the meaning and scope of equivalents of the claims are intended to be included within this utility model. No reference numerals in the claims should be construed as limiting the scope of the claims.
[0023] Furthermore, it should be understood that although this specification describes embodiments, not every embodiment contains only one independent technical solution. This narrative style is merely for clarity. Those skilled in the art should consider the specification as a whole, and the technical solutions in each embodiment can also be appropriately combined to form other embodiments that can be understood by those skilled in the art.
Claims
1. A construction structure for converting and installing wall ties in an aluminum frame curtain wall construction scaffold, comprising wall ties (1) and main keel (2) arranged sequentially from the inner side of the wall to the outer side of the wall, wherein the wall ties (1) are fixed to the structural wall (4) by special inverted conical chemical anchors (3), characterized in that: The main keel (2) is connected to hollow double tempered coated glass (10) on both sides. The top of the main keel (2) is provided with a decorative cover connecting groove (21). The decorative cover connecting groove (21) is connected to a connecting plate (11) by bolts (5). The connecting plate (11) is connected to scaffolding rods (6).
2. The construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding as described in claim 1, characterized in that: The main keel (2) is a visible frame column, including a hollow main rectangular frame structure (22), a decorative cover connecting groove (21) is provided on the hollow main rectangular frame structure (22), and hollow double tempered coated glass (10) is fixed on both sides of the decorative cover connecting groove (21).
3. The construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding as described in claim 1, characterized in that: An aluminum alloy hidden frame beam (7) is connected between the main keel (2).
4. The construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding as described in claim 3, characterized in that: The aluminum alloy concealed frame beam (7) is fixed to the main keel (2) by galvanized angle steel (8).
5. The construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding as described in claim 1, characterized in that: The decorative cover connecting groove (21) is set vertically along the main keel (2).
6. The construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding as described in claim 1, characterized in that: The bolt head of the bolt (5) is located in the decorative cover connecting groove (21), and the bolt passes through the connecting plate (11) and is fixed by the nut.
7. The construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding as described in claim 1, characterized in that: The decorative cover connecting groove (21) has a U-shaped cross section. The two vertical plates of the U-shaped structure are bent relative to each other, and the distance between the bent plates is the screw outlet of the bolt (5).
8. A construction structure for the conversion and installation of wall ties in aluminum frame curtain wall construction scaffolding as described in any one of claims 1 to 7, characterized in that: A temporary adhesive pad (9) is provided between the bottom of the connecting plate (11) and the hollow double tempered coated glass (10).