An integrated bridge-shooting wellhead device

CN224849852UActive Publication Date: 2026-10-13BAOJI SAFE PETROLEUM MACHINERY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522560852.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-12-02
Publication Date
2026-10-13
Estimated Expiration
2035-12-02

AI Technical Summary

Technical Problem

[0005]本实用新型提供一种一体化桥射井口装置,解决了传统桥射井口装置需分次吊装安装多个部件,作业流程繁琐、工作量大,且由壬接头连接导致装置高度高、密封性易受影响的问题

Benefits of technology

本实用新型提供一种一体化桥射井口装置,通过防喷器笼架、作业平台、防喷器、第一双丝接头、下捕捉器、旋塞阀、第二双丝接头和插拔器等结构相互进行配合,在桥射井口作业时,通过第一双丝接头和第二双丝接头可一次性完成防喷器、下捕捉器与插拔器的集成连接,替代传统由壬接头,降低连接高度,减少连接次数,且无需分次吊装各部件,大幅降低工作量与作业风险,解决了传统桥射井口装置需分次吊装安装多个部件,作业流程繁琐、工作量大,且由壬接头连接导致装置高度高、密封性易受影响的问题。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224849852U_ABST
    Figure CN224849852U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of integrated bridge shooting wellhead device, comprising: blowout preventer cage, operation platform, blowout preventer, first double-wire joint, lower catcher, plug valve, second double-wire joint and plug-in device.The utility model provides a kind of integrated bridge shooting wellhead device, through blowout preventer cage, operation platform, blowout preventer, first double-wire joint, lower catcher, plug valve, second double-wire joint and plug-in device etc. Structure is mutually matched, when bridge shooting wellhead operation, through first double-wire joint and second double-wire joint, the integrated connection of blowout preventer, lower catcher and plug-in device can be completed one-time, replace traditional by ren joint, reduce connection height, reduce connection times, and without hoisting each component in batches, greatly reduce workload and operation risk, solve the problem that traditional bridge shooting wellhead device needs to hoist and install multiple components in batches, operation process is complicated, workload is large, and by ren joint connection leads to device height is high, and sealing property is susceptible to influence.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of blowout preventer technology, and in particular to an integrated bridge-jet wellhead device. Background Technology

[0002] In cable logging and perforation operations, the wellhead blowout preventer is installed on the Christmas tree to seal the wellhead with the cable in case of cable accidents such as cable jamming or wire skipping, and to close the wellhead in case of various abnormal accidents. The function of the downhole catcher is first to serve as a warning when the logging instruments and gun strings are raised to the wellhead, and then to protect the logging instruments and gun strings from falling into the well and causing accidents due to various unexpected situations after they have passed through.

[0003] The traditional method involves first connecting the blowout preventer (BOP) above the wellhead, then connecting it to the BOP via a union joint (including a rubber O-ring) under the lower catcher, and finally connecting it to the lower catcher via a union joint (including a rubber O-ring) under the plug-in device. Each component requires hoisting, which not only increases the workload but also raises the operational risks and the risk of leakage due to frequent disassembly and reassembly. Furthermore, because the union nut requires a large axial dimension during installation (limited by the mechanical structure itself), traditional BOP devices suffer from drawbacks such as high height, heavy weight, complex structure, and cumbersome operating procedures.

[0004] Therefore, it is necessary to provide an integrated bridge-shot wellhead device to solve the above-mentioned technical problems. Utility Model Content

[0005] This utility model provides an integrated bridge-jetting wellhead device, which solves the problems of traditional bridge-jetting wellhead devices requiring multiple components to be hoisted and installed in stages, resulting in a cumbersome operation process, a large workload, and the high height of the device and easy impact on sealing due to the connection of the connector.

[0006] To solve the above-mentioned technical problems, this utility model provides an integrated bridge-jetting wellhead device, comprising: The device comprises a blowout preventer (BOP) cage, a working platform, a BOP, a first twin-wire connector, a lower catch, a stopcock valve, a second twin-wire connector, and a plug-in device. The working platform is located on top of the BOP cage, the BOP is located on the inner side of the BOP cage, the lower catch is located on top of the BOP, the plug-in device is located on top of the lower catch, the first twin-wire connector is located between the lower catch and the BOP, and its function is to provide a sealed connection between the BOP and the lower catch, the second twin-wire connector is located between the lower catch and the plug-in device, and its function is to provide a sealed connection between the lower catch and the plug-in device, and the stopcock valve is installed on the front of the lower catch.

[0007] Preferably, the blowout preventer cage includes a frame, a foot pedal, four U-shaped slots, and two steel plate strips. The foot pedal is installed on the front of the frame, the four U-shaped slots are installed on the inner side of the frame, and the two steel plate strips are fixedly installed on the top of the frame.

[0008] Preferably, the four U-shaped slots are respectively disposed at both ends of the front and back of the blowout preventer to limit the sides of the blowout preventer, and the two steel plate pressure strips are respectively disposed at both ends of the top of the blowout preventer to limit the top of the blowout preventer.

[0009] Preferably, both the first and second twin-wire connectors include two external threads, a boss partition wall, and two sealing structures. The two external threads are respectively fixedly installed on the top and bottom of the boss partition wall, and the two sealing structures are respectively disposed at one end of the two external threads.

[0010] Preferably, a lifting connector is installed on the top of the plug-in device.

[0011] Preferably, the integrated bridge-jet wellhead device further includes an upper connector for the inserter, a blowout preventer string, and a wellhead flange. The upper connector for the inserter is installed on the top of the inserter, the blowout preventer string is installed on the top of the upper connector for the inserter, and the wellhead flange is installed on the bottom of the blowout preventer.

[0012] Preferably, the integrated bridge-jet wellhead device further includes multiple mounting components, each of which is disposed on the top of the blowout preventer cage and the bottom of the working platform. Each mounting component includes a mounting nut, a mounting bracket, a mounting bolt, and a base plate. The base plate is disposed at the bottom of the blowout preventer cage, the mounting bracket is disposed on the outer side of the working platform, the mounting bolt passes through the top of the mounting bracket and extends to the bottom of the base plate, and the mounting nut is threaded to the outer side of the mounting bolt and is located at the bottom of the base plate.

[0013] Compared with related technologies, the integrated bridge-jet wellhead device provided by this utility model has the following beneficial effects: This utility model provides an integrated bridge-jet wellhead device. The device comprises a blowout preventer (BOP) cage, a working platform, the BOP, a first double-wire connector, a lower catch, a plug valve, a second double-wire connector, and a plug-in device. During bridge-jet wellhead operations, the BOP, lower catch, and plug-in device can be integrated and connected in one step via the first and second double-wire connectors, replacing the traditional union connector. This reduces the connection height, the number of connection steps, and eliminates the need for multiple hoisting operations, significantly reducing workload and operational risks. It solves the problems of traditional bridge-jet wellhead devices requiring multiple hoisting operations, resulting in cumbersome procedures, high workload, and the high device height and compromised sealing due to union connector connections. Attached Figure Description

[0014] Figure 1 A schematic diagram of the structure of a first embodiment of an integrated bridge-jet wellhead device provided by this utility model; Figure 2 for Figure 1 The diagram shown is a schematic of the blowout preventer cage structure. Figure 3 for Figure 1 The schematic diagram shows the structure of the blowout preventer, the first twin-wire connector, the lower catcher, and the plug valve. Figure 4 for Figure 3 The diagram shows the structure of the first twin-wire connector. Figure 5 A schematic diagram of the structure of a second embodiment of an integrated bridge-jet wellhead device provided by this utility model; Figure 6 A schematic diagram of the third embodiment of the integrated bridge-jet wellhead device provided by this utility model; Figure 7 for Figure 6 The enlarged schematic diagram of part A is shown.

[0015] Numbered in the diagram: 1. Blowout Preventer (BOP) cage, 101. Frame, 102. Pedal, 103. U-shaped slot, 104. Steel plate strip, 2. Working platform, 3. BOP, 4. First double-threaded connector, 41. External thread, 42. Boss isolation wall, 43. Sealing structure, 5. Lower catcher, 6. Plug valve, 7. Second double-threaded connector, 8. Insertor / puller, 9. Lifting connector, 10. Upper connector of insertor / puller, 11. BOP string, 12. Wellhead flange, 13. Mounting assembly, 131. Mounting nut, 132. Mounting bracket, 133. Mounting bolt, 134. Base plate. Detailed Implementation

[0016] The present invention will be further described below with reference to the accompanying drawings and embodiments.

[0017] First Embodiment

[0018] Please refer to the following: Figure 1 , Figure 2 , Figure 3 , Figure 4 ,in, Figure 1 A schematic diagram of the structure of a first embodiment of an integrated bridge-jet wellhead device provided by this utility model; Figure 2 for Figure 1 The diagram shown is a schematic of the blowout preventer cage structure. Figure 3 for Figure 1 The schematic diagram shows the structure of the blowout preventer, the first twin-wire connector, the lower catcher, and the plug valve. Figure 4 for Figure 3 The diagram shows the structure of the first twin-wire connector.

[0019] An integrated bridge-fuse wellhead device includes: a blowout preventer (BOP) cage 1, a working platform 2, a BOP 3, a first double-wire connector 4, a lower catch 5, a stopcock valve 6, a second double-wire connector 7, and a plug-in device 8. The working platform 2 is located on top of the BOP cage 1. The BOP 3 is located on the inner side of the BOP cage 1. The lower catch 5 is located on top of the BOP 3. The plug-in device 8 is located on top of the lower catch 5. The first double-wire connector 4 is located between the lower catch 5 and the BOP 3, and its function is to provide a sealing connection between the BOP 3 and the lower catch 5. The second double-wire connector 7 is located between the lower catch 5 and the plug-in device 8, and its function is to provide a sealing connection between the lower catch 5 and the plug-in device 8. The stopcock valve 6 is installed on the front of the lower catch 5.

[0020] The blowout preventer cage 1 includes a frame 101, a foot pedal 102, four U-shaped slots 103, and two steel plate pressure strips 104. The foot pedal 102 is installed on the front of the frame 101, the four U-shaped slots 103 are all installed on the inner side of the frame 103, and the two steel plate pressure strips 104 are all fixedly installed on the top of the frame 101.

[0021] The four U-shaped slots 103 are respectively disposed at both ends of the front and back of the blowout preventer 3 to limit the side of the blowout preventer 3, and the two steel plate pressure strips 104 are respectively disposed at both ends of the top of the blowout preventer 3 to limit the top of the blowout preventer 3.

[0022] Both the first twin-wire connector 4 and the second twin-wire connector 7 include two external threads 41, a boss isolation wall 42, and two sealing structures 43. The two external threads 41 are respectively fixedly installed on the top and bottom of the boss isolation wall 42, and the two sealing structures 43 are respectively disposed at one end of the two external threads 41.

[0023] The top of the plug-in device 8 is equipped with a lifting connector 9.

[0024] The blowout preventer cage 1 is connected to the blowout preventer 3 by clamping the blowout preventer 3 with a square tube structure having a U-shaped slot 103, and by the steel plate pressure strip 104 on its top and bolts. The lower catcher 5 is connected to the internal thread on the top of the blowout preventer 3 through the first double-threaded connector 4, and the plug-in connector 8 is connected to the internal thread on the top of the lower catcher 5 through the second double-threaded connector 7, forming a whole. First: The blowout preventer cage 1 has a guide U-shaped slot 103 inside. During installation, the blowout preventer 3 is slid into the U-shaped slot 103 of the blowout preventer cage 1 along the guide slot. After it is in place, a steel plate pressure plate 104 is placed on top and then locked to the crossbeam with high-strength bolts to form an integral whole with the cage. Next, screw the lower end of the first double-threaded connector 4 (with sealing rings installed at both ends) into the inner thread at the top of the blowout preventer 3.

[0025] Then screw the inner thread on the lower end face of the lower catcher 5 to the upper end of the first double-thread connector 4 to complete the installation of the lower catcher 5. Then screw the lower end of the second double-wire connector 7 into the top inner wire of the lower catcher 5; Finally, screw the inner thread on the lower end of the plugger 8 onto the upper end of the second double-thread connector 7 to complete the installation of the plugger 8.

[0026] Both ends of the first double-threaded connector 4 and the second double-threaded connector 7 are machined with right-hand external threads, which connect to the internal threads on the upper end face of the blowout preventer 3, the lower end face of the lower catcher 5, and the lower end face of the inserter 8, respectively. The outer sides of both ends of the first double-threaded connector 4 and the second double-threaded connector 7 have sealing groove structures 43, which provide a sealing function after the sealing ring is installed. By rotating the double-threaded connector and the lower catcher 5, a reliable connection and seal between the two can be achieved. Then, the second double-threaded connector is installed into the internal thread on the upper end face of the lower catcher 5. Finally, the inserter 8 is installed into the external thread on the other end of the double-threaded connector and screwed in to lock it. This structure saves the large amount of operating space required by the traditional union nut and integrates this integrated bridge-jetting wellhead device. It does not need to be disassembled during use and only needs to be opened during maintenance. Transportation hoisting, maintenance hoisting, and temporary hoisting operations: Normally, the blowout preventer 3, lower catcher 5, and inserter 8 are integrated into one unit, serving as a single unit for transportation, operation, and storage. Therefore, this integrated wellhead unit is equipped with a dedicated lifting connector 9 for hoisting. When transportation is required, the lifting connector 9 must first be inserted into the flared opening at the top of the integrated wellhead unit. After insertion, connect the hydraulic lines and start the hydraulic system. Operate the hydraulic valves to lock the locking blocks and locking discs of the inserter. Then, disconnect the hydraulic system lines for hoisting. Note: Individual components or parts should only be disassembled for repair or maintenance when the integrated wellhead unit malfunctions. Disassembly is generally unnecessary. See the attached diagram below for details. Figure 1 .

[0027] Operating conditions during wellhead connection operations: The robotic arm of the intelligent integrated work vehicle inserts the upper connector 10 of the special plug-in device 8 at the bottom of the pre-connected blowout preventer string 11 into the guide horn at the top of the integrated bridge-jet wellhead device. After it is in place, the locking block and locking disc on the plug-in device 8 are locked. Then, the robotic arm of the integrated intelligent bridge-jet work system is operated to lift the integrated bridge-jet wellhead device as a whole and insert it into the union at the top of the wellhead flange 12. The union nut is tightened, completing the hoisting and installation of the integrated bridge-jet wellhead device at the wellhead. Note: No additional crane is required for connection to the well, which greatly improves the efficiency of the operation.

[0028] Based on the above-mentioned reconstructed technical solution, the beneficial effects should be fully deepened and quantified; Revolutionary improvement in operational efficiency: Transforming the on-site "serialized" step-by-step installation into an "integrated plug-and-play" overall hoisting, reducing the installation and dismantling time of wellhead equipment in single-well operations; Safety is significantly enhanced: It avoids high-altitude and cross-operations, reduces the frequent movement of personnel up and down the wellhead, and fundamentally reduces safety risks such as falls and collisions; modular integration also reduces well control risks caused by misinstallation or omissions on site; Reduced transportation and warehousing costs: The integrated structure is more compact than the dispersed components, reducing the size and number of transport skids and directly lowering the transportation cost per well; at the same time, standardized modules facilitate warehouse management. In addition, the overall integration reduces the height, thus effectively solving the major problem of height restrictions during transportation.

[0029] Improved reliability: The integrated connection manufactured in the factory has a much higher quality control, sealing and strength reliability than the separate installation under field conditions.

[0030] The working principle of the integrated bridge-jetting wellhead device provided by this utility model is as follows: The blowout preventer 3 and the lower catcher 5 are connected by a first double-threaded connector 4: the bottom external thread 41 of the double-threaded connector is threaded to the top interface of the blowout preventer 3, and the top external thread is threaded to the bottom interface of the lower catcher 5. The boss isolation wall 42 enhances the structural strength and can also tighten and limit the threads on both sides. The sealing structure 43 at both ends (using metal sealing ring + rubber sealing gasket double sealing) ensures that there is no leakage at the connection. Similarly, the lower catcher 5 and the plug-in device 8 are connected by a second double-threaded connector 7, which replaces the traditional union connector and reduces the connection gap. The connected blowout preventer 3 is placed inside the frame 101 of the blowout preventer cage 1. Four U-shaped slots 103 respectively lock the two ends of the front and back of the blowout preventer 3, restricting the horizontal movement of the blowout preventer 3. Two steel plate pressure strips 104 press on the top two ends of the blowout preventer 3, restricting the vertical displacement and ensuring the stability of the blowout preventer during operation. The working platform 2 allows the operator to stand and operate the plug valve 6 (which can control the opening and closing of the wellhead passage during operation). The pedal 102 is a movable pedal that can be flexibly hung in a certain place for temporary tasks, and at the same time, it can facilitate personnel to get on and off the platform. The entire assembly (blowout preventer 3, lower catcher 5, and plugger 8 are integrated) can be hoisted using the lifting joint 9 at the top of the plugger 8, reducing the workload of multiple hoisting operations compared to traditional devices. After hoisting, this integrated bridge-perforation wellhead device can be connected to the flange at the top of the wellhead to carry out cable logging and perforation operations. The lower catcher 5 can prevent logging instruments and gun strings from falling accidentally, and the blowout preventer 3 can seal the wellhead in the event of a cable accident, ensuring operational safety.

[0031] Compared with related technologies, the integrated bridge-jet wellhead device provided by this utility model has the following beneficial effects: The blowout preventer (BOP) cage 1, working platform 2, BOP 3, first double-wire connector 4, lower catcher 5, plug valve 6, second double-wire connector 7, and plug-in device 8 work together to achieve a seamless connection of the BOP 3, lower catcher 5, and plug-in device 8 during bridge-jet wellhead operations. This replaces the traditional union connector, reducing connection gaps and leakage risks. Furthermore, it eliminates the need for multiple hoisting operations of each component, significantly reducing workload and operational risks. This solves the problems of traditional bridge-jet wellhead devices requiring multiple hoisting operations of multiple components, resulting in cumbersome procedures, heavy workloads, and the high height and compromised sealing caused by union connector connections.

[0032] Second Embodiment

[0033] Please refer to the following: Figure 5 Based on the integrated bridge-flying wellhead device provided in the first embodiment of this application, the second embodiment of this application proposes another integrated bridge-flying wellhead device. The second embodiment is merely a preferred embodiment of the first embodiment, and the implementation of the second embodiment will not affect the separate implementation of the first embodiment.

[0034] Specifically, the second embodiment of this application provides an integrated bridge-fuse wellhead device that differs in that the integrated bridge-fuse wellhead device further includes an upper connector 10 for the inserter, a blowout preventer string 11, and a wellhead flange 12. The upper connector 10 for the inserter is installed on the top of the inserter 8, the blowout preventer string 11 is installed on the top of the upper connector 10 for the inserter, and the wellhead flange 12 is installed on the bottom of the blowout preventer 3.

[0035] S1. First, install the hoisting connector 9 ( Figure 1 (Middle) Insert into the flared port at the top of the plug-in 8; S2, Connect the hydraulic lines; S3. Close the locking block and locking disc; S4. Disconnect and remove the hydraulic lines; S5. The lifting joint 9 at the top of the intelligent integrated operation vehicle is lifted onto the transport skid via the boom hook, external crane, or gantry crane. S6. The entire transport skid is hoisted onto the transport vehicle using the four-limb locking devices; S7. Transported to the wellhead of the oilfield well site; S8. Use the four-limb locking devices on the transport skid to lift the entire transport skid from the transport vehicle to the ground; S9. Connect the hydraulic lines; S10. Open the locking disc and locking block; S11, Lift out the lifting joint 9 ( Figure 1 middle); S12. Connect the blowout preventer held by the intelligent integrated work vehicle to the required height; S13. The connected connector 10 of the plug-in device is inserted into the flared opening of the plug-in device 8 at the top of the integrated bridge-jetting wellhead device by the robotic arm of the intelligent integrated operation vehicle; S14. Close the locking block and locking disc; S15. The entire integrated bridge-jet wellhead assembly is lifted to the top of the wellhead using the robotic arm of the work vehicle; S16. Insert the union into the union joint (on the upper side of the wellhead flange) and tighten the union nut.

[0036] After the work is completed, disassemble in the opposite direction and then store in the factory warehouse.

[0037] The working principle of the integrated bridge-jetting wellhead device provided by this utility model is as follows: The upper connector 10 of the plug-in device is threaded to the top of the plug-in device 8 and is used to adapt to the installation of the blowout preventer string 11. The blowout preventer string 11 provides a space and channel for the logging cable and the perforating gun string to be pulled out and lowered into the well. The wellhead flange 12 is connected to the bottom of the blowout preventer 3 by tightening the union nut and is connected to the top flange of the production tree by bolts to achieve a stable and sealed connection between the device and the wellhead, ensuring the pressure bearing capacity of the wellhead operation.

[0038] Compared with related technologies, the integrated bridge-jet wellhead device provided by this utility model has the following beneficial effects: The upper connector 10 of the plug-in device, the blowout preventer string 11, and the wellhead flange 12 work together to provide a space and passage for the logging cable and the perforating gun string to be pulled out and lowered into the well during bridge-perforation wellhead operations. The wellhead flange 12 is firmly connected to the top flange of the Christmas tree by bolts, which enhances the sealing and bearing capacity of the device and the wellhead, and is suitable for high-pressure wellhead operation scenarios.

[0039] Third Embodiment

[0040] Please refer to the following: Figure 6 and Figure 7 Based on the integrated bridge-flying wellhead device provided in the first embodiment of this application, the third embodiment of this application proposes another integrated bridge-flying wellhead device. The third embodiment is merely a preferred embodiment of the first embodiment, and the implementation of the third embodiment will not affect the separate implementation of the first embodiment.

[0041] Specifically, the third embodiment of this application provides an integrated bridge-flying wellhead device that differs in that it further includes multiple mounting components 13. These mounting components 13 are disposed on the top of the blowout preventer cage 1 and the bottom of the working platform 2. Each mounting component 13 includes a mounting nut 131, a mounting bracket 132, a mounting bolt 133, and a base plate 134. The base plate 134 is disposed at the bottom of the blowout preventer cage 1. The mounting bracket 132 is disposed on the outer side of the working platform 2. The mounting bolt 133 passes through the top of the mounting bracket 132 and extends to the bottom of the base plate 134. The mounting nut 131 is threaded onto the outer side of the mounting bolt 133 and is located at the bottom of the base plate 134.

[0042] The working principle of the integrated bridge-jetting wellhead device provided by this utility model is as follows: The base plate 134 of the mounting assembly 13 is attached to the blowout preventer cage 1, and the mounting bracket 132 is attached to the outer side of the working platform 2. The mounting bolt 133 is passed from the top of the mounting bracket 132 to the bottom of the base plate 134. The mounting nut 131 is tightened so that the mounting bracket 132 and the base plate 134 cooperate to clamp the working platform 2 and the blowout preventer cage 1, thereby enhancing the fixing strength between the blowout preventer cage 1 and the working platform 2 and preventing the device from shaking during high-pressure operation. Multiple installation components 13 are evenly distributed (e.g., 4, located at the four corners of the work platform 2) to ensure uniform force distribution.

[0043] Compared with related technologies, the integrated bridge-jet wellhead device provided by this utility model has the following beneficial effects: With the installation component 13 in place, during bridge-jet wellhead operations, the installation bolt 133 passes through the installation frame 132 and the base plate 134, and the installation nut 131 is tightened to make the two work together to clamp the working platform 2 and the blowout preventer cage 1. Multiple installation components 13 are evenly distributed, which greatly enhances the fixing strength of the blowout preventer cage 1 and the working platform 2, and avoids the device shaking and shifting during high-pressure operations.

[0044] The above description is merely an embodiment of this utility model and does not limit the patent scope of this utility model. Any equivalent structural or procedural transformations made based on the content of this utility model specification and drawings, or direct or indirect applications in other related technical fields, are similarly included within the patent protection scope of this utility model.

Claims

1. An integrated bridge-jet wellhead device, characterized in that, include: The device comprises a blowout preventer (BOP) cage, a working platform, a BOP, a first twin-wire connector, a lower catch, a stopcock valve, a second twin-wire connector, and a plug-in device. The working platform is located on top of the BOP cage, the BOP is located on the inner side of the BOP cage, the lower catch is located on top of the BOP, the plug-in device is located on top of the lower catch, the first twin-wire connector is located between the lower catch and the BOP, and its function is to provide a sealed connection between the BOP and the lower catch, the second twin-wire connector is located between the lower catch and the plug-in device, and its function is to provide a sealed connection between the lower catch and the plug-in device, and the stopcock valve is installed on the front of the lower catch.

2. The integrated bridge-jet wellhead device according to claim 1, characterized in that, The blowout preventer cage includes a frame, a foot pedal, four U-shaped slots, and two steel plate strips. The foot pedal is installed on the front of the frame, the four U-shaped slots are installed on the inner side of the frame, and the two steel plate strips are fixedly installed on the top of the frame.

3. The integrated bridge-jet wellhead device according to claim 2, characterized in that, The four U-shaped slots are respectively disposed at both ends of the front and back of the blowout preventer to limit the sides of the blowout preventer, and the two steel plate pressure strips are respectively disposed at both ends of the top of the blowout preventer to limit the top of the blowout preventer.

4. The integrated bridge-jet wellhead device according to claim 1, characterized in that, Both the first and second twin-wire connectors include two external threads, a boss partition wall, and two sealing structures. The two external threads are respectively fixedly installed on the top and bottom of the boss partition wall, and the two sealing structures are respectively disposed at one end of the two external threads.

5. The integrated bridge-flying wellhead device according to claim 1, characterized in that, The top of the plug-in device is equipped with a lifting connector.

6. The integrated bridge-jet wellhead device according to claim 1, characterized in that, It also includes a plug-in connector, a blowout preventer string, and a wellhead flange. The plug-in connector is installed on the top of the plug-in connector, the blowout preventer string is installed on the top of the plug-in connector, and the wellhead flange is installed on the bottom of the blowout preventer.

7. The integrated bridge-jet wellhead device according to claim 1, characterized in that, It also includes multiple mounting components, each of which is disposed at the top of the blowout preventer cage and the bottom of the work platform. Each mounting component includes a mounting nut, a mounting bracket, a mounting bolt, and a base plate. The base plate is disposed at the bottom of the blowout preventer cage, the mounting bracket is disposed on the outer side of the work platform, the mounting bolt passes through the top of the mounting bracket and extends to the bottom of the base plate, and the mounting nut is threaded to the outer side of the mounting bolt and is located at the bottom of the base plate.