A mine underground pipeline erecting installation device

CN224850306UActive Publication Date: 2026-10-13JINCHUAN GROUP NICKEL COBALT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202522172146.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-10-14
Publication Date
2026-10-13
Estimated Expiration
2035-10-14

AI Technical Summary

Technical Problem

[0004]本实用新型的目的是提供一种矿山井下管道架设安装装置,以解决现有矿山井下空间有限,无法快速更换排水管道的问题

Benefits of technology

1、本实用新型通过滑动杆、手拉葫芦和支撑组件相结合,使更换、安装管道时,无需另外搭建脚手架,仅需少量的工作人员即可完成管道的安装和运输,有效提高了工作人员的工作效率,大量降低了工作强度。

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224850306U_ABST
    Figure CN224850306U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of mine underground pipeline erecting installation devices, belong to mine filling technical field, solve the problem that existing mine underground space is limited, cannot quickly replace drain pipeline.This utility model includes trolley, trolley top side symmetry fixedly equipped with stand, two stand inboard slidingly connected with adjustable sliding rod, sliding rod top is equipped with hand chain block, sliding rod is equipped with support assembly, support assembly includes symmetrically arranged threaded rod, support beam and telescopic rod, two threaded rods are connected with threaded sleeve, threaded rod is detachably connected with sliding rod, support beam is symmetrically connected on threaded rod, two telescopic rods are movably connected with two support beams respectively.The utility model has simple structure, and pipeline installation process is convenient, pipeline is lifted by hand chain block cooperative work, greatly eliminates safety risk, improves work efficiency, reduces labor intensity, has very strong practicality, and application prospect is wide.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of mine filling technology, specifically relating to a mine underground pipeline erection and installation device. Background Technology

[0002] In the metal mine production system, the underground drainage system, along with ventilation, transportation, and power supply systems, is a core system for ensuring the safety of underground operations and maintaining production continuity. Its smooth and efficient operation directly affects the overall production efficiency of the mine and the safety of the underground working environment. As the mining depth of metal mines continues to extend downward, the underground geological environment becomes increasingly complex. On the one hand, factors such as rock seepage and groundwater recharge lead to severe scaling in the underground horizontal tunnel drainage pipes, resulting in increased drainage time, higher energy consumption, and lower efficiency. It is necessary to replace the severely scaled horizontal tunnel drainage pipes in a timely manner.

[0003] Currently, the traditional construction method of using scaffolding as a high-altitude work platform is commonly used in underground pipeline replacement construction. When erecting scaffolding, components such as uprights, horizontal bars, and scaffold boards must be assembled section by section according to the tunnel height and pipeline route. This not only consumes a large amount of steel and labor but also takes a long time. After the pipeline installation is completed, the scaffolding must be dismantled and transported, further increasing construction time and costs. This construction method is not only inefficient but also leads to a prolonged pipeline replacement period. If the drainage system is in a state of partial shutdown for an extended period, it may affect the normal production progress of the mine and even trigger a sudden increase in underground drainage pressure, adversely affecting mine production and operation. Utility Model Content

[0004] The purpose of this utility model is to provide a device for installing underground pipelines in mines, so as to solve the problem that the existing underground space in mines is limited and it is impossible to quickly replace drainage pipelines.

[0005] The technical solution of this utility model is: a pipeline erection and installation device for underground mines, including a trolley, with columns symmetrically fixed on one side of the top of the trolley, and adjustable sliding rods slidably connected to the inner sides of the two columns. A hand-operated hoist is provided on the top of the sliding rod, and a support assembly is provided inside the sliding rod. The support assembly includes symmetrically arranged threaded rods, support beams, and telescopic rods. A threaded sleeve is connected between the two threaded rods. The threaded rods are detachably connected to the sliding rods. The support beams are symmetrically connected to the threaded rods, and the two telescopic rods are movably connected to the two support beams respectively.

[0006] As a further improvement of this utility model, the inner sides of the two columns are provided with sliding limiting grooves, and the sliding rod is slidably connected in the sliding limiting grooves.

[0007] As a further improvement of this utility model, the sliding rod is provided with multiple limiting holes, and the column is provided with multiple mounting holes. The limiting holes and the mounting holes are connected by positioning pins.

[0008] As a further improvement of this utility model, a plug is provided on the outside of the threaded rod, and the plug is inserted into the corresponding limiting hole.

[0009] As a further improvement of this utility model, a hanging rod is provided at the top of the sliding rod, and the hand-operated hoist is connected to the hanging rod.

[0010] As a further improvement of this utility model, both support beams are provided with grooves, and the top of the telescopic rod is provided with a slider, which is slidably connected in the groove, and the other end of the telescopic rod is in contact with the ground.

[0011] As a further improvement of this utility model, a fixing rod is provided between the two support beams to increase the support effect.

[0012] As a further improvement of this utility model, the bottom of the trolley is connected to a connecting shaft via a sleeve, and wheels are connected to both sides of the connecting shaft.

[0013] As a further improvement of this utility model, the trolley has a slot on the side away from the column, and multiple counterweights are installed in the slot.

[0014] The beneficial effects of this utility model are: 1. This utility model combines a sliding rod, a hand-operated hoist, and a support assembly, so that when replacing or installing pipes, there is no need to build additional scaffolding. Only a small number of workers are required to complete the installation and transportation of pipes, which effectively improves the work efficiency of workers and greatly reduces the workload.

[0015] 2. This utility model also achieves the installation and transportation of pipelines by cooperating with the support component and the threaded rod, and by using the support beam that can rotate on the threaded rod. This makes it easy to slide the pipeline to the required installation position, simplifies the installation steps, avoids the dangers of manually carrying pipelines up and down scaffolding, protects the safety of workers, and improves work efficiency.

[0016] 3. This utility model relies on the wheels at the bottom of the trolley. By using different wheel types, it can be transported on the track in the tunnel, or directly in the tunnel. It can also be transported and installed in places without tracks, making it easy to adapt to various terrains in the tunnel and improving the applicability of the parts transportation.

[0017] 4. This utility model has a simple structure and is convenient for pipeline installation. By using a hand-operated hoist to lift the pipeline, it greatly eliminates safety risks, improves work efficiency, and reduces labor intensity. It has strong practicality and broad prospects for promotion and application. Attached Figure Description

[0018] Figure 1 This is a schematic diagram of the structure of this utility model; Figure 2 This is a schematic diagram of the threaded rod structure of this utility model; Figure 3 This is a schematic diagram of the telescopic rod and support beam structure of this utility model.

[0019] In the diagram: 1-Trolley; 2-Wheel; 3-Coupling; 4-Counterweight; 5-Column; 6-Sliding rod; 7-Positioning hole; 8-Limiting hole; 9-Positioning pin; 10-Hand chain hoist; 11-Sliding limit groove; 12-Threaded rod; 13-Telescopic rod; 14-Hanging rod; 15-Support beam; 16-Fixing rod; 17-Threaded sleeve; 18-Slide groove; 19-Slider; 20-Socket. Detailed Implementation

[0020] The present invention will now be described in further detail with reference to the accompanying drawings and specific embodiments.

[0021] Example 1 like Figure 1-3 As shown, a mine underground pipeline erection and installation device includes a trolley 1. Columns 5 are symmetrically fixed to one side of the top of the trolley 1. Adjustable sliding rods 6 are slidably connected to the inner sides of the two columns 5. A hand-operated hoist 10 is installed at the top of the sliding rod 6. A support assembly is located inside the sliding rod 6. The support assembly includes symmetrically arranged threaded rods 12, support beams 15, and telescopic rods 13. A threaded sleeve 17 connects the two threaded rods 12. The threaded rods 12 are detachably connected to the sliding rods 6. The support beams 15 are symmetrically connected to the threaded rods 12. The two telescopic rods 13 are movably connected to the two support beams 15 respectively.

[0022] The inner sides of the two columns 5 are provided with sliding limit grooves 11, and the sliding rod 6 is slidably connected in the sliding limit grooves 11.

[0023] Multiple limiting holes 8 are provided through the sliding rod 6, and multiple mounting holes 7 are provided through the column 5. The limiting holes 8 and the mounting holes 7 are connected by positioning pins 9.

[0024] The threaded rod 12 is provided with a plug 20 on the outside, and the plug 20 is inserted into the corresponding limiting hole 8.

[0025] The top of the sliding rod 6 is provided with a hanging rod 14, and the hand chain hoist 10 is connected to the hanging rod 14.

[0026] Both support beams 15 are provided with grooves 18, and the top of the telescopic rod 13 is provided with a slider 19. The slider 19 is slidably connected in the groove 18, and the other end of the telescopic rod 13 is in contact with the ground.

[0027] A fixing rod 16 is provided between the two supporting beams 15.

[0028] The bottom of the trolley 1 is connected to a coupling 3 via a sleeve, and wheels 2 are connected to both sides of the coupling 3.

[0029] The trolley 1 has a slot on the side away from the column 5, and multiple counterweights 4 are installed in the slot to prevent the trolley 1 from tipping over due to excessive weight on the pipe-laying side.

[0030] A method for using a pipeline installation device in underground mines includes the following steps: A. Place a spare pipe on the trolley 1, move the trolley 1 to the pipe installation location using the wheels 2, fix the wheels 2 with the track chocks, extend the sliding rod 6 to the required height, and fix the sliding rod 6 to the column 5 by passing the positioning pin 9 through the positioning hole 7 and the limiting hole 8 in sequence. Place a suitable counterweight 4 in the slot of the trolley 1 to prevent tipping. B. Suspend the pipe to be installed on the hand chain hoist 10, and lift the pipe to the highest position by pulling the hand chain hoist 10. First, extend the telescopic rod 13 to a suitable height, and then insert the slider 19 into the slide groove 18 so that the telescopic rod 13 lifts the support beam 15 to a stable state. Control the hand chain hoist 10 to lower the pipe smoothly and place the pipe on the support beams 15 on both sides. C. The pipe is pulled by the hand chain hoist 10 and rolled on the support beam 15. The staff adjusts the telescopic rod 13 to lift the support beam 15 and tilt it counterclockwise so that the support beam 15 contacts the installation position. Finally, the hand chain hoist 10 is controlled to roll the pipe to the installation position. D. First, the staff will spot weld the replacement pipes to secure them, completing the initial fixation. Then, a professional welder will perform the welding to complete the final pipe installation.

[0031] The columns 5 are arranged opposite each other on the left and right. This component is a load-bearing component and needs to be firmly welded to the trolley 1.

Claims

1. A device for erecting and installing underground pipelines in a mine, characterized in that: Includes a trolley (1), on one side of the top of the trolley (1) are symmetrically fixed columns (5), and the inner sides of the two columns (5) are slidably connected to an adjustable sliding rod (6). A hand-operated hoist (10) is provided on the top of the sliding rod (6), and a support component is provided inside the sliding rod (6). The support assembly includes symmetrically arranged threaded rods (12), support beams (15) and telescopic rods (13). A threaded sleeve (17) is connected between the two threaded rods (12). The threaded rods (12) are detachably connected to the sliding rods (6). The support beams (15) are symmetrically connected to the threaded rods (12). The two telescopic rods (13) are movably connected to the two support beams (15) respectively.

2. The underground pipeline erection and installation device in a mine according to claim 1, characterized in that: The inner sides of the two columns (5) are provided with sliding limit grooves (11), and the sliding rod (6) is slidably connected in the sliding limit grooves (11).

3. A mine underground pipeline erection and installation device according to claim 1 or 2, characterized in that: The sliding rod (6) is provided with multiple limiting holes (8), and the column (5) is provided with multiple mounting holes (7). The limiting holes (8) and the mounting holes (7) are connected by positioning pins (9).

4. The underground pipeline erection and installation device in a mine according to claim 3, characterized in that: The threaded rod (12) is provided with a plug (20) on the outside, and the plug (20) is inserted into the corresponding limiting hole (8).

5. The underground pipeline erection and installation device in a mine according to claim 4, characterized in that: The top of the sliding rod (6) is provided with a hanging rod (14), and the hand-operated hoist (10) is connected to the hanging rod (14).

6. The underground pipeline erection and installation device in a mine according to claim 1, characterized in that: Both support beams (15) are provided with grooves (18), and the top of the telescopic rod (13) is provided with a slider (19), which is slidably connected in the groove (18).

7. The underground pipeline erection and installation device in a mine according to claim 6, characterized in that: A fixing rod (16) is provided between the two supporting beams (15).

8. The underground pipeline erection and installation device in a mine according to claim 1, characterized in that: The trolley (1) has a slot on the side away from the column (5), and multiple counterweights (4) are provided in the slot.